The NHIDCL has issued a formal invitation for competitive bids for the National Highways And Infrastructure Development Corporation Limited project, for Nhidcl/maint./j-bc/tender/ Tez/2019-20/03 in Biswanath, Assam, with an estimated contract value of Rs. 8,15,77,003. The bid opening date for this tender is 22-08-2019 and the last date for bid submission is 06-09-2019. Interested bidders for National Highways And Infrastructure Development Corporation Limited tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Costs
EMD
₹ 8,20,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Nhidcl/maint./j-bc/tender/ Tez/2019-20/03
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_NHIDC_496577_1Bid Award Id
ViewTender No
NHIDCL/Maint./J-BC/Tender/ Tez/2019-20/03Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Maintenance of Earthen Shoulder -
(Filling with fesh soil) (Making up loss of material / irregularities on shoulder( Average 150mm filling) to the design level by adding fresh approved soil and compacting with appropriate equipment.
36000
-
-
... More
Prime Coat Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means (Including cost of testing of material at site and laboratory as directed by the deptt.)
(ii) with Bitumen emulsion- CSS-1h
4005
-
-
... More
Tack Coat
Providing and applying tack coat with bitumen emulsion using emulsion pressurre distributor at the rate of 0.20 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom (including cost of testing of materials at site and laboratory as directed by the deptt.)
(I) with Bitumen emulsion CSS-1h
(a) Normal bituminous surfaceRate Rs./cum including lead
154822
-
-
... More
Dense Graded Bituminous Macadam - 50 mm thickness (Overlay)
'Providing and laying dense bituminous macadam with 100-120 THP batch type HMP producing an average output of 75 tonnes per hour using crushed aggregate of specified grading premixed with bituminous binder @4.0 to 4.5% by weight of total mix and filler transporting the Hot Mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MOSRT&H Cl. 507, complete in all respects. (Including carriage of mixed materials upto 10km initial lead from mixing plant) (including cost of testing of materials at site and laboratory as directed by the Deptt.) - for grading II (19mm nominal size material)
3850
-
-
... More
Bituminous Concrete- 30 mm thickness
(Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder@ 5.4 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the reqd. grade, level and alignment,rolling with smooth wheeled,vibratory and tandem rollers to achieve the desired compaction as per MoRT&H cl. no.509. complete in all respect.
(Including carriage upto initial lead of 5km from quarry and carriage of mixed materials upto 10km initial lead from mixing plant)- for grading II material
2310
-
-