National Highways And Infrastructure Development Corporation Limited Tender
... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 2,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Ie Services For 4 Laning Of Silchar At Km 233.000 To Jiribam At Km 212.060 Of Nh-37in The State Of Assam And Manipur On Hybrid Annuity Mode Pkg-2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_NHIDC_855078_1Tender No
NHIDCL/Assam/NH-37/SJ-II/IE/25Tender Authority
National Highways And Infrastructure Development Corporation Limited ViewPurchaser Address
-Website
http://https://nhidcl.com/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Resident cum Highway Engineer
54
-
-
... More
Tunnel Design Engineer
36
-
-
... More
Tunnel Safety Expert
39
-
-
... More
Senior Geologist
12
-
-
... More
Bridge/Structural Engineer
42
-
-
... More
Senior Pavement Specialist
36
-
-
... More
Senior Quantity cum Material Expert
36
-
-
... More
Road Safety Expert
22
-
-
... More
Sub-Professional Staff
-
-
-
... More
Highway Design Engineer
7
-
-
... More
Bridge/Structure Design Engineer
7
-
-
... More
Environmental Engineer
12
-
-
... More
Survey Engineer
42
-
-
... More
Assistant Highway Engineer (01 no.)
54
-
-
... More
Assistant Tunnel Engineer (01 no.)
54
-
-
... More
CAD Expert
20
-
-
... More
Assistant Quality cum Material Engineer (01 no.)
36
-
-
... More
Electrical Engineer
12
-
-
... More
Horticulture cum Landscaping Expert
18
-
-
... More
Quantity Surveyor
42
-
-
... More
Assistant Tunnel Design Engineer
54
-
-
... More
Tunnel Excavation Engineer
36
-
-
... More
Tunnel Lining Engineer
30
-
-
... More
Geologist
30
-
-
... More
HTMS/Toll Expert
6
-
-
... More
Support Staff
-
-
-
... More
Office Manager
54
-
-
... More
Accountant cum Cashier
54
-
-
... More
Steno cum Computer Operator
54
-
-
... More
Office Boy (1 No.)
54
-
-
... More
Transportation (Fixed rate on rental basis) The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for all complete approx. 3000km/month run
-
-
-
... More
Innova/Scorpio or equivalent vehicle (not more than 3 years old) -1 No. (During Construction Period - 36 months & During Development and O&M Period 12 Months )
54
-
-
... More
Bolero or equivalent vehicle (not more than 3 years old)-2 No. (During Construction Period - 36 months & 12 Months During Development and O&M Period )
54
-
-
... More
Duty Travel to Site (Fixed Costs) (For all Lengths of projects) : Professional and Sub-Professional Staff
-
-
-
... More
Site to NHIDCL HQ for Key Professionals (Round Trip)
36
-
-
... More
Site to Regional Office for Key Profesionals (Round Trips )
54
-
-
... More
Office Rent (Fixed Costs)– Minimum 200 sqm area of office shall be rented. The rent cost includes electricity and water charges, maintenance, Cleaning, repairs, etc. complete.
54
-
-
... More
Office Supplies, Utilities and Communication (Fixed Costs)
-
-
-
... More
Office Supplies
54
-
-
... More
Drafting Supplies
54
-
-
... More
Computer Running Costs
54
-
-
... More
Domestic and International Communication
54
-
-
... More
Office Furniture and Equipment (Rental) :
54
-
-
... More
Monthly reports (Design and Construction) No of Reports - 48
162
-
-
... More
Half yearly Report
(Design and Construction) No of Reports - 24
18
-
-
... More
Various others reports as provided in the Concession Agreement such as Completion Report
(Design and Construction) No of Reports - 8
15
-
-
... More
Road Survey Equipment
-
-
-
... More
Surface defects detection and roughness measurement using Network Survey Vehicle (No. of times survey to be conducted - 3
39.27
-
-
... More
Pavement strength measurement using FWD (No. of times survey to be conducted - 1
13.09
-
-
... More
Bridge inspection using Mobile Bridge Inspection Unit (No. of times survey to be conducted - 3
39
-
-
... More
Road signs inspection using Retro Reflectometer
(No. of times survey to be conducted - 3
39.27
-
-
... More
Contigencies A fixed amount of Indian Rupees Ten Lakh (Rs 10,00,000/-) shall be included in the Financial Proposal
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%