Municipal Corporation Tender

... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Municipal Corporation - GMC Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date1 Mar 2025
Closing Date28 Mar 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Machine Repairing Works Including Auxiliary Replacement Works (schedule-2)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Carbon Brass for slip ring motor of Kirloskar / Compton / GEC motor__(i) 150 H.P. – 200 H.P.

1

-

-

... More
Carbon Brass for slip ring motor of Kirloskar / Compton / GEC motor__(ii) 210 H.P. – 250 H.P.

1

-

-

... More
Carbon Brass for slip ring motor of Kirloskar / Compton / GEC motor__(iii) 275 H.P. – 400 H.P.

1

-

-

... More
Moving contact roller for starter drum of MEI / Kilburn make starter.

1

-

-

... More
Contact finger for MEI/Kilburn type O.C.B. (M.C./V.C.)____(i) 40 H.P. – 100 H.P.

1

-

-

... More
Contact finger for MEI/Kilburn type O.C.B. (M.C./V.C.)____(ii) 110 H.P. – 220 H.P.

1

-

-

... More
Contact finger for MEI/Kilburn type O.C.B. (M.C./V.C.)____(iii) 250 H.P. – 400 H.P.

1

-

-

... More
Moving contact point for MEI / Kilburn type O.C.B____(i) 40 H.P. – 100 H.P.

1

-

-

... More
Moving contact point for MEI / Kilburn type O.C.B____(ii) 110 H.P. – 220 H.P.

1

-

-

... More
Moving contact point for MEI / Kilburn type O.C.B____(iii) 250 H.P. – 400 H.P.

1

-

-

... More
Relay contact or for star delta starter___A. For line connection. (i) 5 H.P. – 10 H.P.

1

-

-

... More
Relay contact or for star delta starter___A. For line connection. (ii) 15 H.P. – 30 H.P.

1

-

-

... More
Relay contact or for star delta starter___A. For line connection. (iii) 40 H.P.- 60 H.P.

1

-

-

... More
Relay contact or for star delta starter___A. For line connection. (iv) 61 HP – 110 HP

1

-

-

... More
Relay contact or for star delta starter___A. For line connection. (v) 111 HP – 220 HP

1

-

-

... More
Relay contact or for star delta starter___A. For line connection. (vi) 221 HP – 400 HP

1

-

-

... More
Relay contact or for star delta starter___B. For Star Connection___(i) 5 H.P. – 10 H.P.

1

-

-

... More
Relay contact or for star delta starter___B. For Star Connection___(ii) 15 H.P. – 30 H.P.

1

-

-

... More
Relay contact or for star delta starter___B. For Star Connection___(iii) 40 H.P.- 60 H.P.

1

-

-

... More
Relay contact or for star delta starter___B. For Star Connection___(iv) 61 HP – 110 HP

1

-

-

... More
Relay contact or for star delta starter___B. For Star Connection___(v) 111 HP – 220 HP

1

-

-

... More
Relay contact or for star delta starter___B. For Star Connection___(vi) 221 HP – 400 HP

1

-

-

... More
Relay contact or for star delta starter___C. For delta connection with overload system_____(i) 5 H.P. – 10 H.P.

1

-

-

... More
Relay contact or for star delta starter___C. For delta connection with overload system_____(ii) 15 H.P. – 30 H.P.

1

-

-

... More
Relay contact or for star delta starter___C. For delta connection with overload system_____(iii) 40 H.P.- 60 H.P.

1

-

-

... More
Relay contact or for star delta starter___C. For delta connection with overload system_____(iv) 61 HP – 110 HP

1

-

-

... More
Relay contact or for star delta starter___C. For delta connection with overload system_____(v) 111 HP – 220 HP

1

-

-

... More
Relay contact or for star delta starter___C. For delta connection with overload system_____(vi) 221 HP – 400 HP

1

-

-

... More
Timer switch for star delta starter_____(i) 5 H.P. – 10 H.P.

1

-

-

... More
Timer switch for star delta starter_____(ii) 15 H.P. – 30 H.P.

1

-

-

... More
Timer switch for star delta starter_____(iii) 40 H.P.- 60 H.P.

1

-

-

... More
Timer switch for star delta starter_____(iv) 61 HP – 110 HP

1

-

-

... More
Timer switch for star delta starter_____(v) 111 HP – 220 HP

1

-

-

... More
Timer switch for star delta starter_____(vi) 221 HP – 400 HP

1

-

-

... More
No volt coil___a)    For star delta starter ___1)   5 H.P. – 20 H.P.

1

-

-

... More
No volt coil___a)    For star delta starter ___2)   25 H.P. – 50 H.P.

1

-

-

... More
No volt coil___b) For O.S.R. type starter (O.C.B.)___1) 60 H.P. – 100 H.P.

1

-

-

... More
No volt coil___b) For O.S.R. type starter (O.C.B.)___2) 110 H.P. – 220 H.P.

1

-

-

... More
No volt coil___b) For O.S.R. type starter (O.C.B.)___3) 240 H.P. – 400 H.P.

1

-

-

... More
H.T. Barrel with metal parts.

1

-

-

... More
H.T. Fuse___ i) 15 Amp – 20 Amp

1

-

-

... More
H.T. Fuse___ii) 25 Amp – 40 Amp

1

-

-

... More
H.T. Fuse___iii) 41 Amp – 60 Amp

1

-

-

... More
H.T. Fuse___iv) 61 Amp – 100 Amp

1

-

-

... More
H.T. Metal parts skipper for hooking the barrel of heavy duty____i) Lower parts.

1

-

-

... More
H.T. Metal parts skipper for hooking the barrel of heavy duty____ii) Upper parts

1

-

-

... More
Over load coil for MEI / Kilburn type O.C.B___i)  40 H.P. – 100 H.P.

1

-

-

... More
Over load coil for MEI / Kilburn type O.C.B___ii) 110 H.P. – 200 H.P.

1

-

-

... More
Over load coil for MEI / Kilburn type O.C.B___iii) 220 H.P. – 400 H.P.

1

-

-

... More
No volt coil assembly for MEI / Kilburn type O.C.B.___i) 40 H.P. – 100 H.P.

1

-

-

... More
No volt coil assembly for MEI / Kilburn type O.C.B.___ii.) 110 H.P. – 200 H.P.

1

-

-

... More
No volt coil assembly for MEI / Kilburn type O.C.B.___iii.) 220 H.P. – 400 H.P.

1

-

-

... More
L / V contact point for O.C.B. of MEI / Kilburn make starter.___(i) 50 H.P. – 150 H.P.

1

-

-

... More
L / V contact point for O.C.B. of MEI / Kilburn make starter.___(ii) 180 H.P. – 400 H.P.

1

-

-

... More
Flat contact point for starter drum of MEI / Kilburn make starter___(i) 50 H.P. – 150 H.P.

1

-

-

... More
Flat contact point for starter drum of MEI / Kilburn make starter___(ii) 180 H.P. – 400 H.P.

1

-

-

... More
O.C.B. handle lock of MEI / Kilburn make starter.___(i) 50 H.P. – 150 H.P.

1

-

-

... More
O.C.B. handle lock of MEI / Kilburn make starter.___(ii) 180 H.P. – 400 H.P.

1

-

-

... More
Main switch of English electric / GEC / Heavels 500 volts T.P.N. type of H.R.C. fuse linking.____i)                32 Amp

1

-

-

... More
Main switch of English electric / GEC / Heavels 500 volts T.P.N. type of H.R.C. fuse linking.____ii)              63 Amp

1

-

-

... More
Main switch of English electric / GEC / Heavels 500 volts T.P.N. type of H.R.C. fuse linking.____iii)            100 Amp

1

-

-

... More
Main switch of English electric / GEC / Heavels 500 volts T.P.N. type of H.R.C. fuse linking.____iv)            200 Amp

1

-

-

... More
Main switch of English electric / GEC / Heavels 500 volts T.P.N. type of H.R.C. fuse linking.____v)              300 Amp

1

-

-

... More
Main switch of English electric / GEC / Heavels 500 volts T.P.N. type of H.R.C. fuse linking.____vi)            400 Amp

1

-

-

... More
Main switch of English electric / GEC / Heavels 500 volts T.P.N. type of H.R.C. fuse linking.____vii)          600 Amp

1

-

-

... More
H.R.C. fuse GEC / English electric make.____i.                     32 Amp

1

-

-

... More
H.R.C. fuse GEC / English electric make.____ii.                    63 Amp

1

-

-

... More
H.R.C. fuse GEC / English electric make.____iii.                 100 Amp

1

-

-

... More
H.R.C. fuse GEC / English electric make.____iv.   200 Amp

1

-

-

... More
H.R.C. fuse GEC / English electric make.____v.    300 Amp

1

-

-

... More
H.R.C. fuse GEC / English electric make.____vi.     400 Amp

1

-

-

... More
H.R.C. fuse GEC / English electric make.____vii.    600 Amp

1

-

-

... More
Backlight insulator for starter drum male and female with copper bolt

1

-

-

... More
Oil immersed star delta starter of MEI / Kilburn make manually Operated 3 PH – 440 volt 50 HZ. _____ i)          20 H.P. – 30 H.P.

1

-

-

... More
Oil immersed star delta starter of MEI / Kilburn make manually Operated 3 PH – 440 volt 50 HZ. _____ ii)        40 H.P. – 60 H.P.

1

-

-

... More
A.T.S. starter of MEI / Kilburn make manually operated 3 phase. 440 volt 50 HZ____i) 25 H.P. – 40 H.P.

1

-

-

... More
A.T.S. starter of MEI / Kilburn make manually operated 3 phase. 440 volt 50 HZ____ii) 50 H.P. – 90 H.P.

1

-

-

... More
A.T.S. starter of MEI / Kilburn make manually operated 3 phase. 440 volt 50 HZ____iii) 100 H.P. – 200 H.P.

1

-

-

... More
D.O.L. starter L & T / Siemens make 3 phase__440 volts 50 HZ___i) 5 H.P. – 10 H.P.

1

-

-

... More
D.O.L. starter L & T / Siemens make 3 phase__440 volts 50 HZ___ii) 12 H.P. – 20 H.P.

1

-

-

... More
Automatic star delta starter of L & T / Siemens / Compton / make, 3 phase 440 volts, 50 HZ____i) 5 H.P. – 10 H.P.

1

-

-

... More
Automatic star delta starter of L & T / Siemens / Compton / make, 3 phase 440 volts, 50 HZ____ii) 12.5 H.P. – 25 H.P.

1

-

-

... More
Automatic star delta starter of L & T / Siemens / Compton / make, 3 phase 440 volts, 50 HZ____iii) 30 H.P. – 50 H.P.

1

-

-

... More
O.S.R. type starter of MEI / Kilburn make manually operated 3 phase, 440 volt 50 HZ for slip ring type motor____i) 150 H.P.

1

-

-

... More
O.S.R. type starter of MEI / Kilburn make manually operated 3 phase, 440 volt 50 HZ for slip ring type motor____ii) 200 H.P.

1

-

-

... More
O.S.R. type starter of MEI / Kilburn make manually operated 3 phase, 440 volt 50 HZ for slip ring type motor____iii) 240 H.P.

1

-

-

... More
O.S.R. type starter of MEI / Kilburn make manually operated 3 phase, 440 volt 50 HZ for slip ring type motor____iv) 400 H.P.

1

-

-

... More
Carbon holder for slip ring motor of Kirloskar / Compton GEC make____i)  150 H.P. – 200 H.P.

1

-

-

... More
Carbon holder for slip ring motor of Kirloskar / Compton GEC make____ii) 220 H.P. – 400 H.P.

1

-

-

... More
Slip ring for Kirloskar / Compton GEC make motor____i) 150 H.P. – 200 H.P.

1

-

-

... More
Slip ring for Kirloskar / Compton GEC make motor____ii) 220 H.P. – 400 H.P.

1

-

-

... More
Aluminium conductor P.V.C. insulated armoured cable for working voltage 660 volts to 1100 volt and maximum conductor temperature 72º C (ISI marked)._A. 3 Core___ i.   60 mm2

1

-

-

... More
Aluminium conductor P.V.C. insulated armoured cable for working voltage 660 volts to 1100 volt and maximum conductor temperature 72º C (ISI marked)._A. 3 Core___ ii.  95 mm2

1

-

-

... More
Aluminium conductor P.V.C. insulated armoured cable for working voltage 660 volts to 1100 volt and maximum conductor temperature 72º C (ISI marked)._A. 3 Core___ iii.  185 mm2

1

-

-

... More
Aluminium conductor P.V.C. insulated armoured cable for working voltage 660 volts to 1100 volt and maximum conductor temperature 72º C (ISI marked)._B. 3½Core___ i.                 60 mm2

1

-

-

... More
Aluminium conductor P.V.C. insulated armoured cable for working voltage 660 volts to 1100 volt and maximum conductor temperature 72º C (ISI marked)._B. 3½Core___ ii.                95 mm2

1

-

-

... More
Aluminium conductor P.V.C. insulated armoured cable for working voltage 660 volts to 1100 volt and maximum conductor temperature 72º C (ISI marked)._B. 3½Core___ iii.              185 mm2

1

-

-

... More
Aluminium conductor P.V.C. insulated XLPE armoured cable for working voltage 11 KV and maximum conductor temperature 72º C (ISI marked)__A. 3 Core___i.     95 mm2

1

-

-

... More
Aluminium conductor P.V.C. insulated XLPE armoured cable for working voltage 11 KV and maximum conductor temperature 72º C (ISI marked)__A. 3 Core___ii.        185 mm2

1

-

-

... More
P.V.C. wire single core of copper multi strand___i.    1.5 mm2

1

-

-

... More
P.V.C. wire single core of copper multi strand___ii.   4.0 mm2

1

-

-

... More
P.V.C. wire single core of copper multi strand___iii.     6 mm2

1

-

-

... More
Flexible wire (P.V.C.)____i.      10 Amp

1

-

-

... More
Flexible wire (P.V.C.)____ii.      5 Amp

1

-

-

... More
Submersible cable of Copper multi strand for submersible pump set._____ a)      4.00 sq. mm.

1

-

-

... More
Submersible cable of Copper multi strand for submersible pump set._____ b)     6.00 sq. mm.

1

-

-

... More
Submersible cable of Copper multi strand for submersible pump set._____ c)      10.00 sq. mm.

1

-

-

... More
Submersible cable of Copper multi strand for submersible pump set._____ d)     16.00 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ a)      10 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ b)     25 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ c)      35 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ d)     50 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ e)      65 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ f)       95 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ g)      120 sq. mm.

1

-

-

... More
Copper cable single core multi strand_____ h)     240 sq. mm.

1

-

-

... More
P.V.C. Tape (Big Size)

1

-

-

... More
Black Tape

1

-

-

... More
Ampere tape

1

-

-

... More
M.C.B. of L & T make / Havels make 3 phase __i.      32 Amp

1

-

-

... More
M.C.B. of L & T make / Havels make 3 phase __ii.      63 Amp

1

-

-

... More
M.C.B. of L & T make / Havels make 3 phase __iii.     100 Amp

1

-

-

... More
M.C.B. of L & T make / Havels make 3 phase __iv.      200 Amp

1

-

-

... More
M.C.B. of L & T make / Havels make 3 phase __v.       300 Amp

1

-

-

... More
M.C.B. of L & T make / Havels make 3 phase __vi.      400 Amp

1

-

-

... More
M.C.B. of L & T make / Havels make 3 phase __vii.      600 Amp

1

-

-

... More
C.T. Coil for ammeter____i) C.T.R. – 100/5 Amp

1

-

-

... More
C.T. Coil for ammeter____ii) C.T.R. – 200/5 Amp

1

-

-

... More
C.T. Coil for ammeter____iii) C.T.R. – 300/5 Amp

1

-

-

... More
C.T. Coil for ammeter____iv) C.T.R. – 400/5 Amp

1

-

-

... More
C.T. Coil for ammeter____v) C.T.R. – 600/5 Amp

1

-

-

... More
Ammeter C.T.R. type____i)       0 – 400 Amp

1

-

-

... More
Ammeter C.T.R. type____ii)     0 – 250 Amp

1

-

-

... More
Ammeter C.T.R. type____iii)   0 – 100 Amp

1

-

-

... More
Volt meter 0-440 volt 3 phase

1

-

-

... More
Rotary Switch._____i)       For Voltmeter.

1

-

-

... More
Rotary Switch._____ii)     For Ammeter

1

-

-

... More
Resistance coil of MEI / Kilburn make starter drum suitable for____150 H.P. – 400 H.P. starter

1

-

-

... More
Cut-out bridge with complete male / female set____i.   16 Amp

1

-

-

... More
Cut-out bridge with complete male / female set____ii.    32 Amp

1

-

-

... More
Cut-out bridge with complete male / female set____iii.  63 Amp

1

-

-

... More
Cut-out bridge with complete male / female set____iv.    100 Amp

1

-

-

... More
Cut-out bridge with complete male / female set____v.   200 Amp

1

-

-

... More
Supply of Electric lamp of Philips / Bajaj make 230 volt._A. Florescent – 40 watt (tube light)

1

-

-

... More
Supply of Electric lamp of Philips / Bajaj make 230 volt._B. General Bulbi) 100 watt

1

-

-

... More
Supply of Electric lamp of Philips / Bajaj make 230 volt._B. General Bulbii) 200 watt

1

-

-

... More
Supply of Electric lamp of Philips / Bajaj make 230 volt._B. General Bulbiii) 500 watt

1

-

-

... More
Tube light frame of make Bajaj / Philips with starter, choke & tube

1

-

-

... More
Choke for tube light

1

-

-

... More
Starter for tube light

1

-

-

... More
Holder for tube / bulb (any type)

1

-

-

... More
Transformer oil Gulf / Indian Oil Barrel (210 litre)

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.i.                                 6305

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.ii.                               6306

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.iii.                              6307

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.iv.                              6308

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.v.                                6309

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.vi.                              6310

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.vii.                             6311

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.viii.                           6312

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.ix.                              6313

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.x.                                6314

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xi.                              6315

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xii.                             6316

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xiii.                           6317

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xiv.                           6318

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xv.                             6319

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xvi.                           6322

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xvii.                          6405

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xviii.                        3305

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xix.                           3306

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xx.                             7308

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xxi.                           7309

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xxii.                          7310

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xxiii.                        7311

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xxiv.                         7312

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xxv.                          7313

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xxvi.                         6218

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____.a) Ball Bearing_____ Model no______.xxvii.                       6212

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingi) NU/N-308

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingii) NU/N-309

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingiii) NU/N-310

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingiv) NU/N-311

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingv) NU/N-315

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingvi) NU/N-318

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingvii) NU/N-319

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingviii) NU/N-412

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingix) NU/N 413

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingx) NU/N-321

1

-

-

... More
Supply of bearing for pump / meter of S.K.F. or equivalent make as per following specification_____b) Roller Bearingxi) NU/N-322

1

-

-

... More
C.I. coupling for pump & motor of Bolt & bushing type____i. Up to 6 inch dia (150 mm)

1

-

-

... More
C.I. coupling for pump & motor of Bolt & bushing type____ii. 8 inch dia (200 mm)

1

-

-

... More
C.I. coupling for pump & motor of Bolt & bushing type____iii. 10 inch dia (250 mm)

1

-

-

... More
C.I. coupling for pump & motor of Bolt & bushing type____iv.  12 inch dia (300 mm)

1

-

-

... More
Coupling nuts & bolt for pump and motor____a.     5 - 15 H.P.

1

-

-

... More
Coupling nuts & bolt for pump and motor____b.  20 – 50 H.P.

1

-

-

... More
Coupling nuts & bolt for pump and motor____c. 60 – 180 H.P.

1

-

-

... More
Coupling nuts & bolt for pump and motor____d.   200 – 400 H.P.

1

-

-

... More
Supply of steel coupling of star (love joy) type complete set with steel ring bushing etc. including boring as per size of pump motor shaft, key slot etc.______1) Up to 6 inch dia (150 mm)

1

-

-

... More
Supply of steel coupling of star (love joy) type complete set with steel ring bushing etc. including boring as per size of pump motor shaft, key slot etc.______2) 8 inch dia (200 mm)

1

-

-

... More
Supply of steel coupling of star (love joy) type complete set with steel ring bushing etc. including boring as per size of pump motor shaft, key slot etc.______3) 10 inch dia (250 mm)

1

-

-

... More
Supply of steel coupling of star (love joy) type complete set with steel ring bushing etc. including boring as per size of pump motor shaft, key slot etc.______4) 12 inch dia (300 mm)

1

-

-

... More
Rubber bushing pad for star type coupling.____1) 6″ dia coupling (150 mm)

1

-

-

... More
Rubber bushing pad for star type coupling.____2) 8″ dia coupling (200 mm)

1

-

-

... More
Rubber bushing pad for star type coupling.____3) 10″ dia coupling (250 mm)

1

-

-

... More
Rubber bushing pad for star type coupling.____4) 12″ dia coupling (300 mm)

1

-

-

... More
Rubber bushing pad of star type for star coupling_10 – 60 H.P. (upto 6″ dia)

1

-

-

... More
Rubber belt for coupling of pump & motor____1)   50 mm width, 10 mm thick

1

-

-

... More
Rubber belt for coupling of pump & motor____2)   80 mm width, 10 mm thick

1

-

-

... More
Rubber belt for coupling of pump & motor____3)   100 mm width, 10 mm thick

1

-

-

... More
G.M. gland bushing for pumps____1) 5 – 10 H.P.

1

-

-

... More
G.M. gland bushing for pumps____2) 15 – 40 H.P

1

-

-

... More
G.M. gland bushing for pumps____3) 50 – 180 H.P.

1

-

-

... More
G.M. gland bushing for pumps____4) 200 - 400 H.P.

1

-

-

... More
C.I. bushing for pump____1) 5 – 10 H.P.

1

-

-

... More
C.I. bushing for pump____2) 15 – 40 H.P

1

-

-

... More
C.I. bushing for pump____3) 50 – 180 H.P.

1

-

-

... More
C.I. bushing for pump____4) 200 - 400 H.P.

1

-

-

... More
S. S Bushing for pump____1)   5 – 10 H.P.

1

-

-

... More
S. S Bushing for pump____2)   15 – 40 H.P

1

-

-

... More
S. S Bushing for pump____3)   50 – 180 H.P.

1

-

-

... More
S. S Bushing for pump____4)   200 - 400 H.P.

1

-

-

... More
Bronze impeller for pumps____1)    5 to 10 H.P.

1

-

-

... More
Bronze impeller for pumps____2)    15 to 30 H.P.

1

-

-

... More
Bronze impeller for pumps____3)    40 to 60 H.P.

1

-

-

... More
M.S. Pumps shaft for_____1) 1 H.P. to 5 H.P.

1

-

-

... More
M.S. Pumps shaft for_____2) 7.5 H.P. to 20 H.P.

1

-

-

... More
M.S. Pumps shaft for_____3) 30 H.P. to 60 H.P.

1

-

-

... More
M.S. Pumps shaft for_____4) 75 H.P. to 110 H.P.

1

-

-

... More
M.S. Pumps shaft for_____5) 150 H.P. to 220 H.P.

1

-

-

... More
M.S. Pumps shaft for_____6) 240 H.P. to 400 H.P.

1

-

-

... More
S.S. Pumps shaft for______1)   1 H.P. to 5 H.P.

1

-

-

... More
S.S. Pumps shaft for______2)   7.5 H.P. to 20 H.P.

1

-

-

... More
S.S. Pumps shaft for______3)   30 H.P. to 60 H.P.

1

-

-

... More
S.S. Pumps shaft for______4)   75 H.P. to 110 H.P.

1

-

-

... More
S.S. Pumps shaft for______5)   150 H.P. to 220 H.P.

1

-

-

... More
S.S. Pumps shaft for______6)   240 H.P. to 400 H.P.

1

-

-

... More
M.S. gland plate for pumps____1)      5 to 10 H.P.

1

-

-

... More
M.S. gland plate for pumps____2)      15 to 30 H.P.

1

-

-

... More
M.S. gland plate for pumps____3)      40 to 60 H.P.

1

-

-

... More
M.S. gland plate for pumps____4)      75 to 150 H.P.

1

-

-

... More
M.S. gland plate for pumps____5)      180 to 240 H.P.

1

-

-

... More
M.S. gland plate for pumps____6)      250 to 400 H.P.

1

-

-

... More
C.I. bearing cashing of pump_____1)   5 to 10 H.P.

1

-

-

... More
C.I. bearing cashing of pump_____2)   15 to 30 H.P.

1

-

-

... More
C.I. bearing cashing of pump_____3)   40 to 60 H.P.

1

-

-

... More
C.I. bearing cashing of pump_____4)   75 to 150 H.P.

1

-

-

... More
C.I. bearing cashing of pump_____5)   180 H.P. – 240 H.P.

1

-

-

... More
C.I. bearing cashing of pump_____6)   250 H.P. – 400 H.P.

1

-

-

... More
M.S. impeller nuts for_____1)   5 to 10 H.P.

1

-

-

... More
M.S. impeller nuts for_____2)   15 to 30 H.P.

1

-

-

... More
M.S. impeller nuts for_____3)   40 to 60 H.P.

1

-

-

... More
M.S. impeller nuts for_____4)   75 to 150 H.P.

1

-

-

... More
M.S. impeller nuts for_____5)   180 H.P. – 240 H.P.

1

-

-

... More
M.S. impeller nuts for_____6)   250 H.P. – 400 H.P.

1

-

-

... More
Impeller for pump (Brass)_____1.  5 to 10 H.P.

1

-

-

... More
Impeller for pump (Brass)_____2.  15 to 30 H.P.

1

-

-

... More
Impeller for pump (Brass)_____3.  40 to 60 H.P.

1

-

-

... More
Impeller for pump (Brass)_____4.  75 to 150 H.P.

1

-

-

... More
Impeller for pump (Brass)_____5.  180 H.P. – 240 H.P.

1

-

-

... More
Impeller for pump (Brass)_____6.  250 H.P. – 400 H.P.

1

-

-

... More
Impeller for pump (S.S.)____1.  5 to 10 H.P.

1

-

-

... More
Impeller for pump (S.S.)____2.  15 to 30 H.P.

1

-

-

... More
Impeller for pump (S.S.)____3.  40 to 60 H.P.

1

-

-

... More
Impeller for pump (S.S.)____4.  75 to 150 H.P.

1

-

-

... More
Impeller for pump (S.S.)____5.  180 H.P. – 240 H.P.

1

-

-

... More
Impeller for pump (S.S.)____6.  250 H.P. – 400 H.P.

1

-

-

... More
Impeller for pump (C.I.)_____1.  5 to 10 H.P.

1

-

-

... More
Impeller for pump (C.I.)_____2.  15 to 30 H.P.

1

-

-

... More
Impeller for pump (C.I.)_____3.  40 to 60 H.P.

1

-

-

... More
Impeller for pump (C.I.)_____4.  75 to 150 H.P.

1

-

-

... More
Impeller for pump (C.I.)_____5.  180 H.P. – 240 H.P.

1

-

-

... More
Impeller for pump (C.I.)_____6.  250 H.P. – 400 H.P.

1

-

-

... More
M.S. stud for Pump body______1.  5 to 10 H.P.

1

-

-

... More
M.S. stud for Pump body______2.  15 to 30 H.P.

1

-

-

... More
M.S. stud for Pump body______3.  40 to 60 H.P.

1

-

-

... More
M.S. stud for Pump body______4.  75 to 150 H.P.

1

-

-

... More
M.S. stud for Pump body______5.  180 H.P. – 240 H.P.

1

-

-

... More
M.S. stud for Pump body______6.  250 H.P. – 400 H.P.

1

-

-

... More
M.S. stud for Gland packing plate_____1.  5 to 10 H.P.

1

-

-

... More
M.S. stud for Gland packing plate_____2.  15 to 30 H.P.

1

-

-

... More
M.S. stud for Gland packing plate_____3.  40 to 60 H.P.

1

-

-

... More
M.S. stud for Gland packing plate_____4.  75 to 150 H.P.

1

-

-

... More
M.S. stud for Gland packing plate_____5.  180 H.P. – 240 H.P.

1

-

-

... More
M.S. stud for Gland packing plate_____6.  250 H.P. – 400 H.P.

1

-

-

... More
Rubber bushing for coupling nuts of size____a. 1¾ X 1″ X ½″

1

-

-

... More
Rubber bushing for coupling nuts of size____b. 1½ X 1¾ X ⅞″

1

-

-

... More
Bearing cover for motor & pumps____1.  5 to 20 H.P.

1

-

-

... More
Bearing cover for motor & pumps____2.  30 to 60 H.P.

1

-

-

... More
Bearing cover for motor & pumps____3.  75 to 150 H.P.

1

-

-

... More
Bearing cover for motor & pumps____4.  180 to 400 H.P.

1

-

-

... More
Check nut for pump & motor ______5 to 20 H.P.

1

-

-

... More
Check nut for pump & motor ______30 to 60 H.P.

1

-

-

... More
Check nut for pump & motor ______75 to 150 H.P.

1

-

-

... More
Check nut for pump & motor ______180 to 400 H.P.

1

-

-

... More
M.S. / C.I. Van guide for pump _____a. 60 H.P. – 100 H.P.

1

-

-

... More
M.S. / C.I. Van guide for pump _____b. 110 H.P. – 200 H.P.

1

-

-

... More
M.S. / C.I. Van guide for pump _____c. 220 H.P. – 300 H.P.

1

-

-

... More
Brass Van guide for pump _____a. 60 H.P. – 100 H.P.

1

-

-

... More
Brass Van guide for pump _____b. 110 H.P. – 200 H.P.

1

-

-

... More
Brass Van guide for pump _____c. 220 H.P. – 300 H.P.

1

-

-

... More
Supply of gland packing for Pump / Valves____(Champion 3316 Make)____a. 12 mm

1

-

-

... More
Supply of gland packing for Pump / Valves____(Champion 3316 Make)____b. 14 mm

1

-

-

... More
Supply of gland packing for Pump / Valves____(Champion 3316 Make)____c. 16 mm

1

-

-

... More
Supply of gland packing for Pump / Valves____(Champion 3316 Make)____d. 18 mm

1

-

-

... More
Supply of gland packing for Pump / Valves____(Champion 3316 Make)____e. 20 mm

1

-

-

... More
Supply of gland packing for Pump / Valves____(Champion 3316 Make)____f. 22 mm

1

-

-

... More
Supply of gland packing for Pump / Valves (S.K.R. Make)___a. 12 mm

1

-

-

... More
Supply of gland packing for Pump / Valves (S.K.R. Make)___b. 14 mm

1

-

-

... More
Supply of gland packing for Pump / Valves (S.K.R. Make)___c. 16 mm

1

-

-

... More
Supply of gland packing for Pump / Valves (S.K.R. Make)___d. 18 mm

1

-

-

... More
Supply of gland packing for Pump / Valves (S.K.R. Make)___e. 20 mm

1

-

-

... More
Supply of gland packing for Pump / Valves (S.K.R. Make)___f. 22 mm

1

-

-

... More
Power contactor 400 (Schneider/ Equivalent Brand)

1

-

-

... More
Power contactor 150/160 (Schneider/ Equivalent Brand)

1

-

-

... More
MNX 225 coil contactor (L&T Make/ Equivalent Brand)

1

-

-

... More
Power relay contactor (L&T Make/ Equivalent Brand)____i. for 180 H.P. to 220 H.P. starter

1

-

-

... More
R.C.C.B of rated Ampere_____i) 200 Amp

1

-

-

... More
R.C.C.B of rated Ampere_____ii) 400 Amp

1

-

-

... More
R.C.C.B of rated Ampere_____iii) 600 Amp

1

-

-

... More
Supply, installation, testing and commissioning of Vacuum Pump set with necessary accessories including Connection with main switch____5 H.P.

1

-

-

... More
Supply, installation, testing and commissioning of Vacuum Pump set with necessary accessories including Connection with main switch____10 H.P.

1

-

-

... More
Lighting Arrestor, 11 KV

1

-

-

... More
DO, 11 KV

1

-

-

... More
Gang, 11 KV

1

-

-

... More
Transformer Gasket changing and fitting

1

-

-

... More
Transformer LT Stud nut_____i) 16 mm

1

-

-

... More
Transformer LT Stud nut_____ii) 19 mm

1

-

-

... More
D-Contact bar for O.C.B. of MEI / Kilburn make starter____(i) 150 H.P. – 200 H.P.

1

-

-

... More
D-Contact bar for O.C.B. of MEI / Kilburn make starter____(ii) 210 H.P. – 250 H.P.

1

-

-

... More
D-Contact bar for O.C.B. of MEI / Kilburn make starter____(iii) 275 H.P. – 400 H.P.

1

-

-

... More
Impeller neck ring for multistage pump (C.I)____1.  25 H.P to 60 H.P.

1

-

-

... More
Impeller neck ring for multistage pump (C.I)____2.  61 H.P to 150 H.P.

1

-

-

... More
Impeller neck ring for multistage pump (C.I)____3.  151 H.P to 240 H.P.

1

-

-

... More
Impeller neck ring for multistage pump (Brass)_____1.  25 H.P to 60 H.P.

1

-

-

... More
Impeller neck ring for multistage pump (Brass)_____2.  61 H.P to 150 H.P.

1

-

-

... More
Impeller neck ring for multistage pump (Brass)_____3.  151 H.P to 240 H.P.

1

-

-

... More
Labour charge for opening out of squirrel cage /Slip ring type & size of induction motor including dismantling the coupling joints where necessary and refitting the same after cleaning, greasing all complete with testing.________a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for opening out of squirrel cage /Slip ring type & size of induction motor including dismantling the coupling joints where necessary and refitting the same after cleaning, greasing all complete with testing.________b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for opening out of squirrel cage /Slip ring type & size of induction motor including dismantling the coupling joints where necessary and refitting the same after cleaning, greasing all complete with testing.________c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for opening out of squirrel cage /Slip ring type & size of induction motor including dismantling the coupling joints where necessary and refitting the same after cleaning, greasing all complete with testing.________d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for opening out of squirrel cage /Slip ring type & size of induction motor including dismantling the coupling joints where necessary and refitting the same after cleaning, greasing all complete with testing.________e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for opening out of squirrel cage /Slip ring type & size of induction motor including dismantling the coupling joints where necessary and refitting the same after cleaning, greasing all complete with testing.________f.  240 H.P. to 400 H.P.

1

-

-

... More
Repairing the rotor of slip ring type induction motor with all necessary materials and fitting fixing & testing after complete of job._____a. 40 H.P. to 100 H.P.

1

-

-

... More
Repairing the rotor of slip ring type induction motor with all necessary materials and fitting fixing & testing after complete of job.______b. 150 H.P. to 220 H.P.

1

-

-

... More
Repairing the rotor of slip ring type induction motor with all necessary materials and fitting fixing & testing after complete of job.______c. 240 H.P. to 400 H.P.

1

-

-

... More
Rewinding the rotor of slip ring type induction motor with all necessary materials & fitting fixing & testing after completion of job.________a.  40 H.P. to 100 H.P.

1

-

-

... More
Rewinding the rotor of slip ring type induction motor with all necessary materials & fitting fixing & testing after completion of job.________b. 150 H.P. to 220 H.P.

1

-

-

... More
Rewinding the rotor of slip ring type induction motor with all necessary materials & fitting fixing & testing after completion of job.________c.  240 H.P. to 400 H.P.

1

-

-

... More
Repairing the stator of slip ring type induction motor with all necessary materials & fitting fixing & testing after completion of job.________a.  40 H.P. – 100 H.P.

1

-

-

... More
Repairing the stator of slip ring type induction motor with all necessary materials & fitting fixing & testing after completion of job.________b. 150 H.P. to 220 H.P.

1

-

-

... More
Repairing the stator of slip ring type induction motor with all necessary materials & fitting fixing & testing after completion of job.________c.  240 H.P. to 400 H.P.

1

-

-

... More
Rewinding the stator of slip ring type induction motor with all necessary materials & fitting fixing and testing after completion of job._______a.   40 H.P. to 100 H.P.

1

-

-

... More
Rewinding the stator of slip ring type induction motor with all necessary materials & fitting fixing and testing after completion of job._______b.  150 H.P. to 220 H.P.

1

-

-

... More
Rewinding the stator of slip ring type induction motor with all necessary materials & fitting fixing and testing after completion of job._______c.   240 H.P. to 400 H.P.

1

-

-

... More
Repairing the stator of squirrel cage type induction motor with all necessary materials & fitting fixing & testing after completion of job.________a.      1 H.P. to 3 H.P.

1

-

-

... More
Repairing the stator of squirrel cage type induction motor with all necessary materials & fitting fixing & testing after completion of job.________b.      5 H.P. to 10 H.P.

1

-

-

... More
Repairing the stator of squirrel cage type induction motor with all necessary materials & fitting fixing & testing after completion of job.________c.      15 H.P. to 30 H.P.

1

-

-

... More
Repairing the stator of squirrel cage type induction motor with all necessary materials & fitting fixing & testing after completion of job.________d.      40 H.P. to 100 H.P.

1

-

-

... More
Repairing the stator of squirrel cage type induction motor with all necessary materials & fitting fixing & testing after completion of job.________e.      150 H.P. to 220 H.P.

1

-

-

... More
Repairing the stator of squirrel cage type induction motor with all necessary materials & fitting fixing & testing after completion of job.________f.       240 H.P. to 400 H.P.

1

-

-

... More
Rewinding the stator of squirrel cage type induction motor with all necessary materials & fitting fixing and testing after completion of job.______a.  1 H.P. to 3 H.P.

1

-

-

... More
Rewinding the stator of squirrel cage type induction motor with all necessary materials & fitting fixing and testing after completion of job.______b. 5 H.P. to 10 H.P.

1

-

-

... More
Rewinding the stator of squirrel cage type induction motor with all necessary materials & fitting fixing and testing after completion of job.______c.  15 H.P. to 30 H.P.

1

-

-

... More
Rewinding the stator of squirrel cage type induction motor with all necessary materials & fitting fixing and testing after completion of job.______d. 40 H.P. to 100 H.P.

1

-

-

... More
Rewinding the stator of squirrel cage type induction motor with all necessary materials & fitting fixing and testing after completion of job.______e.  150 H.P. to 220 H.P.

1

-

-

... More
Rewinding the stator of squirrel cage type induction motor with all necessary materials & fitting fixing and testing after completion of job.______f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for repairing of A.T.S./ Automatic Star- delta type starter in different places, resemble after proper checking & changing of necessary defective parts including load testing at site (spare parts supply by department.)______a.   5 H.P. to 20 H.P.

1

-

-

... More
Labour charge for repairing of A.T.S./ Automatic Star- delta type starter in different places, resemble after proper checking & changing of necessary defective parts including load testing at site (spare parts supply by department.)_____b.  30 H.P. to 60 H.P.

1

-

-

... More
Labour charge for repairing of A.T.S./ Automatic Star- delta type starter in different places, resemble after proper checking & changing of necessary defective parts including load testing at site (spare parts supply by department.)_____c.  75 H.P. to 150 H.P.

1

-

-

... More
Labour charge for repairing of A.T.S./ Automatic Star- delta type starter in different places, resemble after proper checking & changing of necessary defective parts including load testing at site (spare parts supply by department.)_____d. 180 H.P. to 220 H.P

1

-

-

... More
Rewinding of transformer coil of A.T.S. type starter with all necessary materials fitting, fixing and testing all complete as directed_______a.  5 H.P. to 20 H.P.

1

-

-

... More
Rewinding of transformer coil of A.T.S. type starter with all necessary materials fitting, fixing and testing all complete as directed_______b. 30 H.P. to 60 H.P.

1

-

-

... More
Rewinding of transformer coil of A.T.S. type starter with all necessary materials fitting, fixing and testing all complete as directed_______c.  75 H.P. to 150 H.P.

1

-

-

... More
Rewinding of transformer coil of A.T.S. type starter with all necessary materials fitting, fixing and testing all complete as directed_______d. 180 H.P. to 220 H.P

1

-

-

... More
Labour charge for opening out of oil immersed starter drum of slip ring motor reassembling the same after proper checking and changing of necessary parts. (Spare parts supply by department.)_____a.  100 H.P. to 200 H.P.

1

-

-

... More
Labour charge for opening out of oil immersed starter drum of slip ring motor reassembling the same after proper checking and changing of necessary parts. (Spare parts supply by department.)_____b. 220 H.P. to 400 H.P.

1

-

-

... More
Opening out of O.C.B. at site and reassemble after changing and rectification of defective materials O.C.B. testing (spare parts supply by department)_____a.  100 H.P. to 200 H.P.

1

-

-

... More
Opening out of O.C.B. at site and reassemble after changing and rectification of defective materials O.C.B. testing (spare parts supply by department)_____b. 220 H.P. to 400 H.P.

1

-

-

... More
Labour charge for changing of no volt coil of starter and O.C.B.______a.  5 H.P. to 50 H.P.

1

-

-

... More
Labour charge for changing of no volt coil of starter and O.C.B.______b. 60 H.P. to 110 H.P.

1

-

-

... More
Labour charge for changing of no volt coil of starter and O.C.B.______c.  120 H.P. to 220 H.P.

1

-

-

... More
Labour charge for changing of no volt coil of starter and O.C.B.______d. 240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for changing of over load relay coil of starter_____a. 5 H.P. to 50 H.P.

1

-

-

... More
Labour charge for changing of over load relay coil of starter_____b. 60 H.P. to 110 H.P.

1

-

-

... More
Labour charge for changing of over load relay coil of starter_____c. 120 H.P. to 220 H.P.

1

-

-

... More
Labour charge for changing of over load relay coil of starter_____d. 240 H.P. to 400 H.P.

1

-

-

... More
Cable socket soldering or clamping with cutting of cable & supply of required size and type of socket (lug) including providing of all required materials like acid rang etc. or clamping machine whatever necessary and connecting to the machineries.________a. 1 H.P. to 3 H.P.

1

-

-

... More
Cable socket soldering or clamping with cutting of cable & supply of required size and type of socket (lug) including providing of all required materials like acid rang etc. or clamping machine whatever necessary and connecting to the machineries.________b. 5 H.P. to 10 H.P.

1

-

-

... More
Cable socket soldering or clamping with cutting of cable & supply of required size and type of socket (lug) including providing of all required materials like acid rang etc. or clamping machine whatever necessary and connecting to the machineries.________c. 15 H.P. to 30 H.P.

1

-

-

... More
Cable socket soldering or clamping with cutting of cable & supply of required size and type of socket (lug) including providing of all required materials like acid rang etc. or clamping machine whatever necessary and connecting to the machineries.________d. 40 H.P. to 100 H.P.

1

-

-

... More
Cable socket soldering or clamping with cutting of cable & supply of required size and type of socket (lug) including providing of all required materials like acid rang etc. or clamping machine whatever necessary and connecting to the machineries.________e. 150 H.P. to 220 H.P.

1

-

-

... More
Cable socket soldering or clamping with cutting of cable & supply of required size and type of socket (lug) including providing of all required materials like acid rang etc. or clamping machine whatever necessary and connecting to the machineries.________f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for changing fitting fixing of new main switch / M.C.B. of different sizes (switch supply by department)_____a.  16 to 63 Amp

1

-

-

... More
Labour charge for changing fitting fixing of new main switch / M.C.B. of different sizes (switch supply by department)_____b. 100 to 200 Amp

1

-

-

... More
Labour charge for changing fitting fixing of new main switch / M.C.B. of different sizes (switch supply by department)_____c.  220 to 400 Amp

1

-

-

... More
Labour charge for changing fitting fixing of new main switch / M.C.B. of different sizes (switch supply by department)_____d. 600 Amps and above

1

-

-

... More
Labour charge for changing fitting fixing of starter of different size including making the connection (starter supply by department)_______a.  1 H.P. to 5 H.P.

1

-

-

... More
Labour charge for changing fitting fixing of starter of different size including making the connection (starter supply by department)_______b. 7.5 H.P. to 30 H.P.

1

-

-

... More
Labour charge for changing fitting fixing of starter of different size including making the connection (starter supply by department)_______c.  40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for changing fitting fixing of starter of different size including making the connection (starter supply by department)_______d. 110 H.P. to 220 H.P.

1

-

-

... More
Labour charge for changing fitting fixing of starter of different size including making the connection (starter supply by department)_______e.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for repairing of MCCB/MCB/Main switch at different site with necessary materials.______a.   16 - 63 Amp

1

-

-

... More
Labour charge for repairing of MCCB/MCB/Main switch at different site with necessary materials.______b.  100 – 200 Amp

1

-

-

... More
Labour charge for repairing of MCCB/MCB/Main switch at different site with necessary materials.______c.   220 – 400 Amp

1

-

-

... More
Labour charge for repairing of MCCB/MCB/Main switch at different site with necessary materials.______d.  600 Amps and above

1

-

-

... More
Labour charge for fitting fixing of coupling including boring, key slots cutting after sleeve fitting as per motor & pump shafts._______a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for fitting fixing of coupling including boring, key slots cutting after sleeve fitting as per motor & pump shafts._______b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for fitting fixing of coupling including boring, key slots cutting after sleeve fitting as per motor & pump shafts._______c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for fitting fixing of coupling including boring, key slots cutting after sleeve fitting as per motor & pump shafts._______d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for fitting fixing of coupling including boring, key slots cutting after sleeve fitting as per motor & pump shafts._______e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for fitting fixing of coupling including boring, key slots cutting after sleeve fitting as per motor & pump shafts._______f.  240 H.P. to 400 H.P.

1

-

-

... More
Motor slip ring repairing for ____a.   110 to 220 H.P.

1

-

-

... More
Motor slip ring repairing for ____b.  240 to 400 H.P.

1

-

-

... More
Copper cable laying fitting fixing including supplying and soldering of cable socket as required for different size of motor & making the connection (cable supply by department)______a.  Main switch to starter 3 (line)

1

-

-

... More
Copper cable laying fitting fixing including supplying and soldering of cable socket as required for different size of motor & making the connection (cable supply by department)______b. Starter to motor (3 line)

1

-

-

... More
Rotor shafts welding turning as per size of bearing & also threading for check nut.____a.  1 H.P. to 3 H.P.

1

-

-

... More
Rotor shafts welding turning as per size of bearing & also threading for check nut.____b. 5 H.P. to 10 H.P.

1

-

-

... More
Rotor shafts welding turning as per size of bearing & also threading for check nut.____c.  15 H.P. to 30 H.P.

1

-

-

... More
Rotor shafts welding turning as per size of bearing & also threading for check nut.____d. 40 H.P. to 100 H.P.

1

-

-

... More
Rotor shafts welding turning as per size of bearing & also threading for check nut.____e.  150 H.P. to 220 H.P.

1

-

-

... More
Rotor shafts welding turning as per size of bearing & also threading for check nut.____f.  240 H.P. to 400 H.P.

1

-

-

... More
Motor cover repairing including sleeve fitting in bearing place as per the size of bearing_____.a.  1 H.P. to 3 H.P.

1

-

-

... More
Motor cover repairing including sleeve fitting in bearing place as per the size of bearing_____.b. 5 H.P. to 10 H.P.

1

-

-

... More
Motor cover repairing including sleeve fitting in bearing place as per the size of bearing_____.c.  15 H.P. to 30 H.P.

1

-

-

... More
Motor cover repairing including sleeve fitting in bearing place as per the size of bearing_____.d. 40 H.P. to 100 H.P.

1

-

-

... More
Motor cover repairing including sleeve fitting in bearing place as per the size of bearing_____.e.  150 H.P. to 220 H.P.

1

-

-

... More
Motor cover repairing including sleeve fitting in bearing place as per the size of bearing_____.f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for opening out of pump of different size including dismantling suction delivery pipe coupling joints where necessary and checking the complete pump, providing necessary gasket, grease & refitting the same_________a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for opening out of pump of different size including dismantling suction delivery pipe coupling joints where necessary and checking the complete pump, providing necessary gasket, grease & refitting the same_________b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for opening out of pump of different size including dismantling suction delivery pipe coupling joints where necessary and checking the complete pump, providing necessary gasket, grease & refitting the same_________c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for opening out of pump of different size including dismantling suction delivery pipe coupling joints where necessary and checking the complete pump, providing necessary gasket, grease & refitting the same_________d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for opening out of pump of different size including dismantling suction delivery pipe coupling joints where necessary and checking the complete pump, providing necessary gasket, grease & refitting the same_________e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for opening out of pump of different size including dismantling suction delivery pipe coupling joints where necessary and checking the complete pump, providing necessary gasket, grease & refitting the same_________f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for changing of impeller for pump after opening out the damage impeller.______a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for changing of impeller for pump after opening out the damage impeller.______b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for changing of impeller for pump after opening out the damage impeller.______c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for changing of impeller for pump after opening out the damage impeller.______d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for changing of impeller for pump after opening out the damage impeller.______e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for changing of impeller for pump after opening out the damage impeller.______f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for changing van guide for the following pump of different size._____a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for changing van guide for the following pump of different size._____b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for changing van guide for the following pump of different size._____c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for changing van guide for the following pump of different size._____d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for changing van guide for the following pump of different size._____e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for changing van guide for the following pump of different size._____f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for changing of bushing with greasing for pump the following size.______a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for changing of bushing with greasing for pump the following size.______b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for changing of bushing with greasing for pump the following size.______c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for changing of bushing with greasing for pump the following size.______d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for changing of bushing with greasing for pump the following size.______e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for changing of bushing with greasing for pump the following size.______f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for fitting fixing of M.S./ S.S. pump shafts with greasing as per sample for the following.______a. 1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for fitting fixing of M.S./ S.S. pump shafts with greasing as per sample for the following.______b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for fitting fixing of M.S./ S.S. pump shafts with greasing as per sample for the following.______c. 15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for fitting fixing of M.S./ S.S. pump shafts with greasing as per sample for the following.______d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for fitting fixing of M.S./ S.S. pump shafts with greasing as per sample for the following.______e. 150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for fitting fixing of M.S./ S.S. pump shafts with greasing as per sample for the following.______f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for pump shafts welding turning making and sizing complete including carrying of shaft from worksite to factory and refitting the same______a. 1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for pump shafts welding turning making and sizing complete including carrying of shaft from worksite to factory and refitting the same______b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for pump shafts welding turning making and sizing complete including carrying of shaft from worksite to factory and refitting the same______c. 15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for pump shafts welding turning making and sizing complete including carrying of shaft from worksite to factory and refitting the same______d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for pump shafts welding turning making and sizing complete including carrying of shaft from worksite to factory and refitting the same______e. 150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for pump shafts welding turning making and sizing complete including carrying of shaft from worksite to factory and refitting the same______f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for pump bearing cover welding, turning or sleeve fitting etc. complete._____a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for pump bearing cover welding, turning or sleeve fitting etc. complete._____b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for pump bearing cover welding, turning or sleeve fitting etc. complete._____c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for pump bearing cover welding, turning or sleeve fitting etc. complete._____d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for pump bearing cover welding, turning or sleeve fitting etc. complete._____e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for pump bearing cover welding, turning or sleeve fitting etc. complete._____f.  240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for fitting fixing of bearing with grease etc. including opening out of pump/ motor different site and refitting the same complete with testing._____a.  1 H.P. to 3 H.P.

1

-

-

... More
Labour charge for fitting fixing of bearing with grease etc. including opening out of pump/ motor different site and refitting the same complete with testing._____b. 5 H.P. to 10 H.P.

1

-

-

... More
Labour charge for fitting fixing of bearing with grease etc. including opening out of pump/ motor different site and refitting the same complete with testing._____c.  15 H.P. to 30 H.P.

1

-

-

... More
Labour charge for fitting fixing of bearing with grease etc. including opening out of pump/ motor different site and refitting the same complete with testing._____d. 40 H.P. to 100 H.P.

1

-

-

... More
Labour charge for fitting fixing of bearing with grease etc. including opening out of pump/ motor different site and refitting the same complete with testing._____e.  150 H.P. to 220 H.P.

1

-

-

... More
Labour charge for fitting fixing of bearing with grease etc. including opening out of pump/ motor different site and refitting the same complete with testing._____f.  240 H.P. to 400 H.P.

1

-

-

... More
Heating & varnishing of stator / rotor including supply of required varnish all complete with testing.______a.  1 H.P. to 3 H.P.

1

-

-

... More
Heating & varnishing of stator / rotor including supply of required varnish all complete with testing.______b. 5 H.P. to 10 H.P.

1

-

-

... More
Heating & varnishing of stator / rotor including supply of required varnish all complete with testing.______c.  15 H.P. to 30 H.P.

1

-

-

... More
Heating & varnishing of stator / rotor including supply of required varnish all complete with testing.______d. 40 H.P. to 100 H.P.

1

-

-

... More
Heating & varnishing of stator / rotor including supply of required varnish all complete with testing.______e.  150 H.P. to 220 H.P.

1

-

-

... More
Heating & varnishing of stator / rotor including supply of required varnish all complete with testing.______f.  240 H.P. to 400 H.P.

1

-

-

... More
Making & fitting of wooden base plate on the deck of barge with supplying necessary plank of Sal wood of required size including welding, cutting & fitting fixing of base plate, pump motor etc. as directed.______a.  5 H.P. to 10 H.P.

1

-

-

... More
Making & fitting of wooden base plate on the deck of barge with supplying necessary plank of Sal wood of required size including welding, cutting & fitting fixing of base plate, pump motor etc. as directed.______b. 15 H.P. to 30 H.P.

1

-

-

... More
Making & fitting of wooden base plate on the deck of barge with supplying necessary plank of Sal wood of required size including welding, cutting & fitting fixing of base plate, pump motor etc. as directed.______c.  40 H.P. to 100 H.P.

1

-

-

... More
Making & fitting of wooden base plate on the deck of barge with supplying necessary plank of Sal wood of required size including welding, cutting & fitting fixing of base plate, pump motor etc. as directed.______d. 150 H.P. to 220 H.P.

1

-

-

... More
Making & fitting of wooden base plate on the deck of barge with supplying necessary plank of Sal wood of required size including welding, cutting & fitting fixing of base plate, pump motor etc. as directed.______e.  240 H.P. to 400 H.P.

1

-

-

... More
Base plate modification as required for proper fitting of pump, motor including providing all the materials, welding cutting complete as directed._______a.  1 H.P. to 3 H.P.

1

-

-

... More
Base plate modification as required for proper fitting of pump, motor including providing all the materials, welding cutting complete as directed._______b. 5 H.P. to 10 H.P.

1

-

-

... More
Base plate modification as required for proper fitting of pump, motor including providing all the materials, welding cutting complete as directed._______c.  15 H.P. to 30 H.P.

1

-

-

... More
Base plate modification as required for proper fitting of pump, motor including providing all the materials, welding cutting complete as directed._______d. 40 H.P. to 100 H.P.

1

-

-

... More
Base plate modification as required for proper fitting of pump, motor including providing all the materials, welding cutting complete as directed._______e.  150 H.P. to 220 H.P.

1

-

-

... More
Base plate modification as required for proper fitting of pump, motor including providing all the materials, welding cutting complete as directed._______f.  240 H.P. to 400 H.P.

1

-

-

... More
Making of R.C.C. foundation over the floor of treatment plant for fitting, fixing of M.S. Base Plate for pump & motor _____a. 10 H.P. to 60 H.P.

1

-

-

... More
Making of R.C.C. foundation over the floor of treatment plant for fitting, fixing of M.S. Base Plate for pump & motor _____b. 100 H.P. to 220 H.P.

1

-

-

... More
Making of R.C.C. foundation over the floor of treatment plant for fitting, fixing of M.S. Base Plate for pump & motor _____c. 240 H.P. to 400 H.P.

1

-

-

... More
Carrying of motor from the Intake Barge to workshop for the purpose of rewinding/ repairing.______a. 100 H.P. to 220 H.P.

1

-

-

... More
Carrying of motor from the Intake Barge to workshop for the purpose of rewinding/ repairing.______b. 240 H.P. to 400 H.P.

1

-

-

... More
Labour charge for drilling and rethreading of gland plate hole of pump, valve, non return valve etc. including providing of new bolt as per threading size, fitting fixing complete._______a.  Hole up to 15 mm dia

1

-

-

... More
Labour charge for drilling and rethreading of gland plate hole of pump, valve, non return valve etc. including providing of new bolt as per threading size, fitting fixing complete._______b. Hole between 15 to 20 mm dia

1

-

-

... More
Labour charge for drilling and rethreading of gland plate hole of pump, valve, non return valve etc. including providing of new bolt as per threading size, fitting fixing complete._______c.  Hole between 20 to 25 mm dia

1

-

-

... More
Dismantling of submersible pumpr including cleaning greasing refitting & testing.a.   5 - 20 H.P.

1

-

-

... More
Dismantling of submersible pump including cleaning greasing refitting & testing.b.  21 – 50 H.P.

1

-

-

... More
Dismantling of submersible motor including cleaning greasing refitting & testing.a.   5 - 20 H.P.

1

-

-

... More
Dismantling of submersible motor including cleaning greasing refitting & testing.b.  21 – 50 H.P.

1

-

-

... More
Rewinding submersible motor including supplying all necessary materials complete with testing._____a.   5 H.P.

1

-

-

... More
Rewinding submersible motor including supplying all necessary materials complete with testing._____b.  7.5 – 20 HP

1

-

-

... More
Rewinding submersible motor including supplying all necessary materials complete with testing._____c.   21 – 30 H.P.

1

-

-

... More
Rewinding submersible motor including supplying all necessary materials complete with testing._____d.  31 – 50 H.P.

1

-

-

... More
Supply fitting fixing of G.M. bushing for submersible motor_____a.  5 H.P.

1

-

-

... More
Supply fitting fixing of G.M. bushing for submersible motor_____b. 7.5 – 20 HP

1

-

-

... More
Supply fitting fixing of G.M. bushing for submersible motor_____c.  21 – 30 H.P.

1

-

-

... More
Supply fitting fixing of G.M. bushing for submersible motor_____d. 31 – 50 H.P.

1

-

-

... More
Supply fitting fixing of S.S. shafts for submersible pump.____a. 5 H.P.

1

-

-

... More
Supply fitting fixing of S.S. shafts for submersible pump.____b. 7.5 – 20 HP

1

-

-

... More
Supply fitting fixing of S.S. shafts for submersible pump.____c. 21 – 30 H.P.

1

-

-

... More
Supply fitting fixing of S.S. shafts for submersible pump.____d. 31 – 50 H.P.

1

-

-

... More
Supply fitting fixing of thrust plate & bearing for submersible motor.________a. 5 H.P.

1

-

-

... More
Supply fitting fixing of thrust plate & bearing for submersible motor.________b. 7.5 – 20 HP

1

-

-

... More
Supply fitting fixing of thrust plate & bearing for submersible motor.________c. 21 – 30 H.P.

1

-

-

... More
Supply fitting fixing of thrust plate & bearing for submersible motor.________d. 31 – 50 H.P.

1

-

-

... More
Supply & fitting of impeller for submersible pump ____A) C.I.____ a.  5 H.P.

1

-

-

... More
Supply & fitting of impeller for submersible pump ____A) C.I.____ b. 7.5 – 20 HP

1

-

-

... More
Supply & fitting of impeller for submersible pump ____A) C.I.____ c.  21 – 30 H.P.

1

-

-

... More
Supply & fitting of impeller for submersible pump ____A) C.I.____ d. 31 – 50 H.P.

1

-

-

... More
Supply & fitting of impeller for submersible pump ____ B) G.M. ____ a.  5 H.P.

1

-

-

... More
Supply & fitting of impeller for submersible pump ____ B) G.M.b. 7.5 – 20 HP

1

-

-

... More
Supply & fitting of impeller for submersible pump ____ B) G.M.c.  21 – 30 H.P.

1

-

-

... More
Supply & fitting of impeller for submersible pump ____ B) G.M.d. 31 – 50 H.P.

1

-

-

... More
Joining of submersible cable with straight through socket joint with water proof tap

1

-

-

... More
Supplying fitting fixing cable joint box_____Outdoor:____a.  120- 240 Sq mm

1

-

-

... More
Supplying fitting fixing cable joint box_____Outdoor:____b. 300- 400 Sq mm

1

-

-

... More
Supplying fitting fixing cable joint box_____indoor:____a.  120- 240 Sq mm

1

-

-

... More
Supplying fitting fixing cable joint box_____indoor:____b. 300- 400 Sq mm

1

-

-

... More
Supplying fitting fixing cable joint box_____Straight through::____a. 120- 240 Sq mm

1

-

-

... More
Supplying fitting fixing cable joint box_____Straight through:____b. 300- 400 Sq mm

1

-

-

... More
Supplying fitting, fixing of heat Shrinkable type kits for transformer 11 KV(E) – XLPE __Outdoor__a.  120- 240 Sq mm

1

-

-

... More
Supplying fitting, fixing of heat Shrinkable type kits for transformer 11 KV(E) – XLPE __Outdoor__b. 300- 400 Sq mm

1

-

-

... More
Supplying fitting, fixing of heat Shrinkable type kits for transformer 11 KV(E) – XLPE __indoor__a.  120- 240 Sq mm

1

-

-

... More
Supplying fitting, fixing of heat Shrinkable type kits for transformer 11 KV(E) – XLPE __indoor__b. 300- 400 Sq mm

1

-

-

... More
Labour charge for fitting of Lighting Arrestor set

1

-

-

... More
Labour charge for fitting of DO set

1

-

-

... More
Labour charge for fitting of Gang set

1

-

-

... More
Labour charge for re-filling of Transformer oil

1

-

-

... More
Labour charge for heating of Transformer including providing heating equipments

1

-

-

... More
Filtration of Transformer oil including labour charge

1

-

-

... More
Centrifugal Monoblock Pump with all accessories like pipes, wires fittings, etc. (Crompton Make or Reputed Brand)____1 H.P

1

-

-

... More
Centrifugal Monoblock Pump with all accessories like pipes, wires fittings, etc. (Crompton Make or Reputed Brand)____2 H.P

1

-

-

... More
Sump De-watering pump with all accessories like pipes, wires fittings, etc. (Crompton Make or Reputed Brand)_____1 H.P

1

-

-

... More
Sump De-watering pump with all accessories like pipes, wires fittings, etc. (Crompton Make or Reputed Brand)_____2 H.P

1

-

-

... More
Sump De-watering pump with all accessories like pipes, wires fittings, etc. (Crompton Make or Reputed Brand)_____5 H.P

1

-

-

... More
Bearing Grease- AP-3

1

-

-

... More
Portable Generator with all accessories like wires, fittings, etc. (Honda Make or Reputed Brand)____a. 1 KVA

1

-

-

... More
Portable Generator with all accessories like wires, fittings, etc. (Honda Make or Reputed Brand)____b. 3 KVA

1

-

-

... More
Portable Generator with all accessories like wires, fittings, etc. (Honda Make or Reputed Brand)____c. 5KVA

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.