Irrigation Department Tender

... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Irrigation Department Tender

Civil And Construction
Bridge Construction
Eprocure
Opening Date22 Jun 2023
Closing DateCancelled
Tender Amount₹ 1,23,13,754 
Notes
Download

Costs

Summary

Improvement Of Canal System At Bokpuri Fis Under Sopdg For The Year 2022_23 Under Paneri Kalaigaon Division I_ Tangla

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No.7: Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).

75.76

-

466.99

... More
CONSTRUCTION OF 110 MM DIA PVC OUTLET (Qnty for 12 Nos.)

-

-

-

... More
Item No. 2 : C.C. work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

6.17

-

6230.84

... More
Repairing of Head and Cross regulator gates

-

-

-

... More
Item No.2: Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).

13237.62

-

525.98

... More
Item No.3 :Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).

29.7

-

281.98

... More
CONSTRUCTION OF CATTLE & CART CROSSING CULVERT(4.00M wide)-1 UNIT

-

-

-

... More
Item No 6 :Providing CC counter weight with handle of approx 2 x 50kg on the specified MS hanger and properly tagged as directed.

2

-

4620.74

... More
Item No. 7 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).

14.5

-

388.55

... More
Item No.4 :Supply, fitting, fixing of square base plate of size 600mm x 600mm x 10mm with central circular hole, on the cross channels of the platform assembly as directed for erecting the tool post and distribution of axial load.

2

-

4400.71

... More
Item No. 7 : Earth work in back filling of structures with soil obtained from outside borrow pits filling in 15 cm thick layers, ramming, dressing, watering including paying compensation of land if any. (with lead upto 30 m. and lift 1.50 m.)

175.2

-

388.55

... More
Re-sectioning of canal system

-

-

-

... More
Item No.2 :RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:1½:3 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

4.32

-

8260.37

... More
Item No. 3 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

3.24

-

6230.84

... More
Item No.8 :Painting of exposed iron structure complete by one coat of red oxide metal primer, followed by two coats of synthetic enamel paints of different colour shades of ruputed brand with proper prior removing rust and foreign materials by steel wire brush as directed.

9.75

-

495.08

... More
Item No. 6 : 12 mm thick cement plastering work including clearing surface curing etc. complete as directed in prop. 1 : 4

21.6

-

208.33

... More
Construction of RCC precast slab (Qnty for 3 Nos.)

-

-

-

... More
Item No. 3 : Supplying fitting fixing and laying reinforcement in position in RCC work including cutting, bending, binding with black wire and tying etc., complete as directed.

18.76

-

8925.54

... More
Item No. 4 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.

4.08

-

8925.54

... More
Item No. 2 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

1.62

-

6230.84

... More
Item No. 6 : 12 mm cement plastering including clearing surface and curing complete as directed. In proportion 1:4

14.24

-

208.33

... More
Item No. 5 : R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

72.6

-

7657.28

... More
Item No.5 :Providing of HD thrust bearing for screw shaft of following diameter with precession placing on the recess of the bearing plate, followed with sufficient greasing as directed for (i) 40mm dia screw shaft

2

-

1320.21

... More
Item No. 4 : CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

2.76

-

6828.83

... More
Item No. 4 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).

92.93

-

281.98

... More
Item No.1 :Supplying, fitting, fixing and laying in position M.S. rod/ Torsteel/ TMT bars of all sizes as per design and drawing as required including cutting, bending, cranking with necessary lappage and tying with black wire complete as directed.

4.14

-

8925.54

... More
Item No. 5 : Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately).

36

-

576.87

... More
Item No. 3 : CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

4.26

-

6828.83

... More
Item No. 5 : R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

31.06

-

8260.37

... More
Item No.1: Earthwork in excavation of deposited silt mixed with slushy earth, sand, gravel etc. from the canal bed including resectioning, grading the canal bed, bailing out water where necessary and carrying and depositing the suitable earth on the top of both marginal embankment / side slopes in layers of 15 cm thick and breaking clods upto 15 mm cube by wooden rammer properly as directed lead upto 30 M and lift 1.5 M.

1342.2

-

334.85

... More
Item No.3 Supply, fitting, fixing of MS screw shaft of 50mm nominal dia of @ TPI, suare threaded of following lenths with a adrilled hole of 13 mm dia (incorporating standard tolerance) at the bottom non threaded portion to the MS bracket provided at the shutter with the help of lock pin as per required and as directed. (i) 3.00 m long...

6

-

13202.12

... More
CONSTRUCTION OF CATTLE CROSSING- 2 UNITS

-

-

-

... More
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).A. In all types of soils (except soil mixed with gravel and boulders) (i) For normal lead of 30 M and lift of 1.50 M

125.8

-

247.47

... More
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing dressing the foundation, soaring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).

8.8

-

247.47

... More
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). A. In all types of soils (except soil mixed with gravel and boulders) (i) For normal lead of 30 M and lift of 1.50 M

6.84

-

247.47

... More
Item No. 5 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of C.C and R.C.C works etc. complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) With 38mm thick plank.

37.36

-

281.98

... More
Strengthening of Afflux & Guide bund

-

-

-

... More
Item No. 2 : C.C. work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

2.9

-

6230.84

... More
Item No.2 :Supplying, fitting , fixing of best quality "J" type rubber seal as per IS: 11855 :1986 of following sizes duly bolted to the shutter as per in line hole sizex of the shutter with the help of MS flat of 25 mm x 6 mmm size. (b) 75 mm

12.8

-

1430.23

... More
Item No. 6: 12 mm thick cement plastering work including clearing surface curing etc. complete as directed in prop. 1 : 4.

43.52

-

208.33

... More
Item No. 2 :- Construction of 1.50 M x 1.00 M rectangular boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed. (ii) With river boulder

86

-

7290.75

... More
Item No. 7 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).

54.6

-

388.55

... More
Item No. 2 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).

49.2

-

281.98

... More
CONSTRUCTION OF 6.00 M. R. C. C. CULVERT- 1 Unit

-

-

-

... More
Item No. 1 :- Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity). Afflux bundh Guide bundh

3878.98

-

525.98

... More
Item No. 1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary).A. In all types of soils (except soil mixed with gravel and boulders) (i) For normal lead of 30 M and lift of 1.50 M

45.18

-

247.47

... More
Item No.7 :Providing steel wire rope of 16mm dia cross lay as per IS 2266:2002 passing over the double pulleys for hanging counter weight with the help of suitable hanger & galvanized "U" bolt of required size at one end and fastening the other end at the shutter hook as directed withproper static balancing of the system.

2

-

3520.57

... More
Item No. 3 : Supplying fitting fixing and laying reinforcement in position in RCC work including cutting, bending, binding with black wire and tying etc., complete as directed.

45.62

-

8925.53



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.