Irrigation Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Irrigation Department Tender

Works
Civil And Construction
Eprocure
Opening Date26 Sep 2024
Closing Date18 Oct 2024
Tender Amount₹ 3,76,33,955 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Item No. 3 : Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing. From 468 to 1000 m.

1117.2

-

810.22

... More
Item No. 4 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCCwork including cutting, bending, cranking with two piles 0.91M (20BWG) annealed wire hooking tying, complete as directed. From 468 to 1000 m.

383.64

-

13127.94

... More
Item No. 5 :Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) From 468 to 1000 m.

8810.69

-

978.08

... More
Item No. 15 : Collection of sand gravel (40% sand and 60% gravel of size 25 mm to 60 mm) free from dust and dirt including stacking in measurable stacks at quarry site and making payment of forest royalty etc. as directed complete. From 468 to 1000 m.

167.58

-

944.83

... More
Item No. 16 : Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site completed as directed. Quarry = Dhansiri = Distance = 5.00 Km For First Km.

167.58

-

107.14

... More
For subsequence Km.

670.32

-

44.13

... More
Item No. 17 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M complete as directed.

167.58

-

457.23

... More
Item No. 7 : CC work in proportion 1:2:4 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 6 mm to 20 mm including curing with necessary timber shuttering, scaffolding where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

574.56

-

8992.08

... More
Item No. 8 : 12mm cement plastering including clearing surface and curing, complete as directed.

2447.2

-

302.65

... More
Item No. 9 : Providing 50mm wide expansion joints with bituminous compound mixedwith coarse sand for canal work at an interval of 10M apart including laying, fitting the compound in proper position, etc, complete as directed.

286.2

-

544.44

... More
Item No. 10 :Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1KM including paying compensation of earth obtained from private land if any loading, unloading, spreading thesame in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment,breaking clods not more than 10mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will bemade after deduction of 12.50% shrinkage allowance from the gross quantity).

5442.84

-

748.6

... More
Construction of Bed Barrier

-

-

-

... More
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). (B) In soil mixed with gravel and boulder upto 30 cm size

187.68

-

504.75

... More
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). (ii)With shuttering & without Dewatering

21.18

-

8106.45

... More
Item no. 4: CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

130.68

-

8756.64

... More
Item No. 4 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCCwork including cutting, bending, cranking with two piles 0.91M (20BWG) annealed wire hooking tying, complete as directed. From 468 to 1000 m.

60.48

-

13127.94

... More
Item No. 5 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) (ii) With 38 mm thick wood plank

476.34

-

380.91

... More
Item no.7: 12 mm cement plastering including clearing surface and curing, complete as directed. In proportion 1:4

139.98

-

284.71

... More
Item no.8: Collection of one man size 25cm to 30cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height a tquarry site and complete as directed.

9.48

-

1077.1

... More
Item No. 9 : Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site completed as directed. Quarry = Dhansiri = Distance = 5.00 Km For First Km.

9.48

-

107.14

... More
For subsequence Km.

47.4

-

44.13

... More
Item No. 10 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3M, complete as directed.

9.48

-

862.09

... More
Item no.11: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).

225

-

617.97

... More
Construction of RCC precast slab

-

-

-

... More
Item No. 4 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCCwork including cutting, bending, cranking with two piles 0.91M (20BWG) annealed wire hooking tying, complete as directed.

4.5

-

13127.94

... More
Item no. 4: CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

8.28

-

8756.64

... More
Item No. 5 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered). (Abutment / Return Wall / Piers / Pedestal etc.) (A) Shuttering (Slab)

42.36

-

380.91

... More
Construction of 600 mm dia HP Culvert

-

-

-

... More
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). (B) In soil mixed with gravel and boulder upto 30 cm size

252

-

504.75

... More
Item No. 2: CC work in proportion 1:4:8 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

17.28

-

7591.09

... More
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately). (ii)With shuttering & without Dewatering

57.76

-

8106.45

... More
Item no. 4: CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

21.12

-

8756.64

... More
Item No. 5: Supplying of 600mm dia NP3 R.C.C Hume pipe

16

-

17545.72

... More
Item No. 6:Labour for fitting and fixing hume pipe in position with collars including joining the cement mortar in proportion 1:3 and curing, including carrying the same from godown to site and complete as directed.

40

-

561.13

... More
Item no.7: 12 mm cement plastering including clearing surface and curing, complete as directed.

96.96

-

302.65

... More
Item no.8: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).

603.44

-

617.97

... More
Construction of 4.00 m Cattle cart crossing

-

-

-

... More
Item No. 1: Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). (B) In soil mixed with gravel and boulder upto 30 cm size

225.9

-

504.75

... More
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

14.5

-

8106.45

... More
Item No. 4 : Supplying fitting fixing and laying reinforcement (TATA) in position in RCCwork including cutting, bending, cranking with two piles 0.91M (20BWG) annealed wire hooking tying, complete as directed.

93.78

-

13127.94

... More
Item No. 5 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered).

464.65

-

380.91

... More
Item No. 5 :RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

182.25

-

10093.61

... More
Item no.7: 12 mm cement plastering including clearing surface and curing, complete as directed. In proportion 1:4

120

-

284.71

... More
Item no.8: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).

1128.8

-

617.97

... More
Construction of 110 mm dia PVC outlet

-

-

-

... More
Item No.1 : Earthwork in excavation in foundation of canal structures in all types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site. (Including bailing out stagnant rain water where necessary). (A) In all types of soil (except soil mixed with gravel and boulder) (i) For normal lead of 30 M and lift of 1.50 M

206.5

-

358.69

... More
Item No.2 : Centering and shuttering including propping, nailing, bolting with earth oiling inside face etc and removal of forms after completion of CC and RCC works etc, complete as directed. (Measurement to be taken on the face area timbered).

1376.5

-

380.91

... More
Item no. 3: CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

48.5

-

8106.45

... More
Item no. 4: CC work in proportion 1:2:4 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).

138

-

8756.64

... More
Item No. 5 : Supplying, fitting, fixing PVCpipes(IS12818,6kg/cm2 ), joining pipeswith relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately)

150

-

741.74

... More
Item no.6: 12 mm cement plastering including clearing surface and curing, complete as directed. In proportion 1:4

285

-

284.71

... More
Item no.7 : Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).

525

-

617.97



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.