Irrigation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 50,000Document Cost
₹ 500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ID_36886_1Tender No
GDI/NIT/1/TB/1071Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Item No. 3 : RCC work in slab, abutment cap and above abutment, pier cap, pedestals, dirtwall etc. in proportion 1:1½:3 with hard broken stone aggregate of size 6 mm to20 mm with proper reinforcement as per design including necessary curing, dewatering etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
8.78
-
111819.18
Item No. 4 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
B)(i) Shuttering (Beam) without Prop.
33.48
-
7471.4
C) Shuttering (Column)
12.48
-
6848.77
Item No. 5 : 12 mm cement plastering including clearing surface and curing, complete as directed. (i) In proportion 1:3
175.16
-
53012.17
Item No. 6 : Supplying 1 1/2" dia GI pipe for hand railing including fitting & fixing the same in position etc, complete as directed.
111.6
-
110312.14
Repairing works at Head work site of Bhetijan Salbari FIS
-
-
-
tem No. 1 : Construction of 1.00 M square boulder sausage including supplying of materials with 25 cm to 30 cm size boulders collecting from a lead of 25 KM encased in 15 cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart, laid in position as directed including necessary local carriage of materials, paying necessary forest royalty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vertical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc, all complete as directed.
(ii) With river boulder
40
-
217767.6
Item No. 2 : Collection of one man size 25 cm to 30 cm hard river boulder including stacking in measurable stacks of not more than 1.00 M height at quarry site and making payment of forest royalty etc, complete as directed.
18.3
-
19686.04
Item No. 3 : Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed. (A) For normal road upto 25.0 Km (ii) With Contractor's Profit & GST
18.3
-
20186.73
Item No. 4 : Carriage of boulders, gravels, metal screening, stacking in measurable stacks at site, complete as directed.
(B) For 1st KM of Quarry Road
(ii) With Contractor's Profit & GST
18.3
-
1960.66
Item No. 5 : Labour charge for pitching with one man size boulder including dressing and ramming the seat to proper size and slope, pitching etc. with local carriage of boulders from a distance of 60 M with lift upto 3 M, complete as directed.
18.3
-
15776.25
Strengthening of Feeder Canal Embankment of Bhetijan Salbari FIS
-
-
-
Item No. 1 : Earthwork in filling in all soils in plinth, canal embankment and bed filling as per design section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same including light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50 % shrinkage allowance from the gross quantity).
300.36
-
253774.16
Construction of RCC Canal at Bhetijan Salbari FIS
-
-
-
Item No. 1 : Earth work in excavation in foundation of canal structure in all type of soil as per design & drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to a safe distance from the working place & depositing the required soils in uniform layers, dressing, watering & breaking clods not more than 10 mm. cube with compensation complete as directed at site (including bailing out stagnant rain water where necessary). A. In all types of soils (except soil mixed with gravel & boulders) (i).For normal lead of 30.0 m and lift of 1.5 m
89.04
-
31937.76
Item No. 2 : Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
127.2
-
103059.98
Item No. 3 : CC work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc. with hard river shingles of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
12.72
-
110008.28
Item No. 4 : Supplying, fitting, fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking, tying, complete as directed.
56.31
-
739234.3
Item No. 5 : R.C.C. work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
43.55
-
439292.33
Item No. 6 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed. (Measurement to be taken on the face area timbered).
B)(i) Shuttering (Beam) without Prop.
441.69
-
98567.54
A) Shuttering (Slab)
2.16
-
805.83
Item No. 7 : Earth work in back filling of structure obtained from outside borrow pits filling in 15cm layers, ramming, dressing, watering including paying compensation of land if any (with lead upto 30.0 m and lift 1.50m).
44.52
-
27437.23
Item No. 8 :Supplying, fitting, fixing PVC pipes (IS 12818, 6 kg/cm2), joining pipes with relevant cement, levelling, testing leakages etc, complete as directed. (Cost of E/W foundation trenches will be paid separately) (i) For 110 mm dia
1.5
-
1112.61
Construction of Sign Board
-
-
-
Item No. 1 :Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
1
-
12221
Evaluation Notes How It Works ?