Irrigation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 59,589Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Solar Powered Mdtw Scheme At Luitporia Gp (3 Points) Under Ridf-xxvii Nabard For The Year 2021-22_package_2
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ID_25856_1Bid Award Id
ViewTender No
JC (I)/Tech/E-Tender/2021-22/17Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Supplying sal wooden hammer of of size 15 cm x 10 cm with 45 cm long & 5 cm wooden handle etc. complete as directed.
2
-
-
Approach Road
-
-
-
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed.
A) Ordinary soil
445.5
-
-
Collection and supply of sand and gravel (40% sand and 60% gravel) of size 13mm to 38mm from approved quarry including loading, unloading and stacking in measurable stacks at work site up to a height of 1.00m including payment of forest royality etc.
19.8
-
-
Labour charges for spreading hard river shingles / sand gravels to required thickness over approach subway etc. including ramming, dressing the seat before laying the materials lead upto 30.00 M and lift 1.50 M. Complete as directed.
19.8
-
-
Boring and Installation of Tube Well
-
-
-
Movement of drilling Rig, Tools & Plants, Accessories including drill pipes, casing pipes etc. to drilling site and back
50
-
-
Boring of DTW of bore hole up to 450mm dia and up to a depth of 70 M or up to required depth by RC/DR Drilling Rig including supply and transportation of all required tools & Plants, materials & labour to site to perform the job in complete as directed in alluvium areas ( means areas where the strata comprises of loose, unconsiolidated materials like clays, silts, sands gravels, pebbles, cobbles and boulders) as per IS:2800 (part-1) of 1991. ( soil sample must be collected & keep properly at every 3.00 M interval of depth in boring. The job also include movement of rig by making temporary approach road etc. to the field up to distance of 1000M)
70
-
-
Supply, lowering & installation in tube well 200mm PVC housing pipe / blind pipe of wall thickness of 10.0 mm to 11.2 mm for casing assembly including supply of well cap, sockets, reducer, MS housing clamps etc. as required as per IS : 12818-1997 of length 3.00 M of repute brand like Oriplast / Jindal / Prince etc. and as directed.
( Litholog Assembly diagram must be approved by Engineer-in-Charge of the work prior to installation)
52
-
-
Supply, lowering & installation in tube well 150mm PVC Ribbed Screen Filter pipe of wall thickness of 10.0 mm to 11.2 mm for casing assembly including supply of sockets, reducer etc. as required as per IS : 12818-1997 of length 3.00 M/2.00 M of repute brand like Oriplast / Jindal / Prince etc. and as directed
( Litholog Assembly diagram must be approved by Engineer-in-Charge of the work prior to installation)
18
-
-
Shrouding the DTW assembly by river pea gravel of size 4 mm to 8 mm free from sand / dust and any other foreign materials after screening / stacking at site including supply, transportation, labour etc. complete as directed.
10
-
-
Developing the tube well assembly by Air-Compressor of capacity 8-12 kg/cm2 and CFM=450 M3/min so as to get sand free discharge of water with supply of all required materials at site complete as directed including furnishing of litho-log / draw down data etc. as per IS : 11185 of 1999. ( For new DTW minimum 72 hours development is compulsory. Additional pea gravel required if any, during development would be extra The following data should be reflected in the report of development
1. Static water level
2. Drawdown at various discharge
3. Available average discharge
72
-
-
Supply & Installation of Solar Pumping System: (a) Solar Submersible Standalone Pump set with 7.5 HP AC Induction motor and Solar Power Controller Unit Conform IEC 6168311:1999) with overload, overunder voltage, short circuit protection, suitable for 200 mm bore well and discharge capacity approx 1400 LPM at 10 M head (Dynamic Head Range 10- 20 Mtr and Shut off head 30 M) working at 8000 Wattp of solar power along with Cables, Inverter external box, surge suppressor, DC MCB & all necessary accessories like, 2(two) pairs of Assembly support clamps, 10(ten) nos. of Cable clamp / clip, 1 (one) no. of Delivery bend, 20(twenty) mtr. column pipe, 1(one) no. of Short pipe of 1.5 Mtr. length of required diameter, 40(forty) mtr.(approx.) Flat flexible cable (motor to controller) as per latest MNRE norms and as per IS. (b) Supply, fitting-fixing and testing & commissioning of Solar PV modules conforming to IEC 61215 specification or equivalent National or International standards consisting of solar panels framed in anodized aluminium frame of 8000 Wp (approx.) considering 7.15 kWh/ M2/ Day of solar insolation under standard test condition on horizontal surface with tolerance (+/-) 15% and hot dipped galvanized(minm 80 micron thickness) mounting mild steel structure of rectangular hollow sections, angles, heavy duty pipes of dia 150 mm (all materials duly IS marked) for providing sufficient strength with dual axis manual tracking arrangement which can withstand load of modules and high wind velocities upto 150 Km/hr including RCC foundation designed against all possible loads (Dead, Live and imposed load), Controller conform to IEC 61683-1999 & IEC 60068-1-2, IEC 60068 2- (2, 14, 30, 78) ( The series and parallel combination of Solar Modules to be done in such a way that Jalverter/ Controller input voltage requirement is met i.e. System Vmp 587 V & System Voc 800 V) and necessary connection cables, pipes to the water trough and other accessories, etc. complete in all respect as directed (Controller to be installed with suitable arrangement on the body of the pole of mounting structure with rain proof provision. SPV panel should be of reputed make like TATA/Bikram/Waaree etc. and carry at least 20 years warrenty & Comprehensive maintenance for 1 year and should installed preferably above HFL) (c) Earthing with 50 mm dia Gl pipe 3.64 mm thick x 3.04 Mts. long and 1 x4 SWG GI (Hot Dip) wire (4 Mts. long), 13 mm dia x 80 mm long GI bolts5, double nuts, double washers incl. S &F 15 mm dia GI pipe protection (1 Mts. long) to be filled with bitumen partly under the ground level and partly above ground level driven to an average depth of 3.65 Mts. Below the ground level as below: (a) By ISI-Medium Gl pipe including excavation of soil tor installation of Earth Electrode and filling & Tamming and connecting to individual structure to earth electrode including S&F 20 mm x 3 mm galvanized (Hot Dip) MS flat on wall/floor with GI saddles as required and connection to equipments incl. drilling holes, with bolts, nuts, washers etc. (d) Lightning protection (Arrestor)(pole mounted)(Lightning protection with 3" X 1.5" G.I pipe of 4 mts height with base flange in proper RCC foundation and S & F Lightning Conductor Air Terminal made of 20 mm dia 1000 mm long Gl pipe (ISI Medium) having five discharge prongs of 4 SWG GI (Hot Dip) wire at top duly soldered with 7/16 stranded GI (Hot Dip) wire and 85 mm dia 65 mm thick Gl base plate at bottom incl. necessary holes etc including supply & fixing GI (Hot Dip) strips 20 mm x 3 mm thick for horizontal run on the /Roof with GI Saddles 1100 mm apart. NB :- 1. Solar Pump set should be of reputed make and carry 5 years warranty/ guarantee 2. Flow Range 90L per Wp of PV array from TDH of 10 M 3. Controller DC Input Voltage: (i) System Vmp 587 V & (ii) System Voc 800 V 4. Controller Conforming to : IEC 61683-1999 & IEC 60068- 1-2,IEC 60068-2-(2,14,30,78) (Rate As per MNRE Circular No. 32/24/2020-SPV Division, dt-26/10/2021 including cost of remote monitoring & USPC) This benchmark cost are for the systems installed as per MNRE specifications inclusive of the total cost of system and its installation, commissioning, transportation, insurance, warranty/guarantee, monitoring & maintenance for five years. Cost Solar Standalone Pumping System Rs 4,08,631.00 Add GST @ 18% = Rs 73,553.58 Cost Solar Pumping System = Rs 4,82,184.58
1
-
-
Supply, fitting-fixing of Heavy duty CIDF sluice valve inside screw, non raising, vertical spindle type with hand wheel operation need of water purpose. The rotation of closing should be counter clock wise. The holes of the flange should be drilled as per BSS No. 10 , Part-I, Table-D. All materials construction and components should strickly conform to IS : 14846-2000 and having marked with manufacturers name and trade mark in the delivery pipe layout as directed / as per drawing along with HD GI flange, pipe joining materials and painting in complete as directed.
(i) 100mm dia
2
-
-
Supply, fitting-fixing of Heavy duty CIDF Reflex valve, swing check type with bypass arrangement, horizontal operating. The holes of the flange to be as per BSS No. 10, Part-I, Table-D and the material, construction and all components should strictly conform to IS : 5312 (Part-I)-2004 and having arked with manufacturers name and trade mark in the delivery pipe layout as directed / as per drawing along with HD GI flange, pipe jointing set and painting in complete as directed.
(i) 100mm dia
1
-
-
Supply, fitting-fixing of delivery pipes of 80/100 mm dia GI / fabricated GI pipes (HD of repute brand with ISI marked) with flange at both end / wherever required with pipe jointing sets, including painting in complete as per drawing / specification including temporary pipe support as required and as directed
8
-
-
Ftting-fixing of MS / GI bend of 80/100mm dia x 450 / 900 / 1200 with GI / fabricated GI pipes with flange at both end and pipe jointing sets, including painting as per drawing / specification as directed.
3
-
-
Supply, fitting-fixing of surge tank of size 900m dia x 1250mm long made of 4mm MS plate with raiser assembly of size 75mm dia x 6.0m long and S-band of size 200mm x 1600mm long made of 4mm MS plate including painting the above with one coat of synthetic enamel primer fllowed by 2 (two) coats of successive synthetic enamel/ bituminous black paint and made provision for mounting the surge tank on a specified foundation by nuts & bolts of suitable size as per drawing & specification as directed.
1
-
-
Supplying Fitting & Fixing of Metal Box for Protection of Controller Unit on Mounting Structcure
-
-
-
Supply, Erection, Fitting & Fixing of MS Metal Box of size 800mm(H)x500mm(B)x 300mm (D) where controller unit along with MCB will be placed on Mounting Structure for protecting it from rainwater etc. including painting with approved paint, and fixing it to the mounting structure with necessary arrangement including arrangement for locking metal box door and completed as required in all respect and as directed.
1
-
-
Underground PVC Pipe Distribution System
-
-
-
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mention in the approved drawing and as directed and specified. In ordinary soil
438.77
-
-
Supplying, fitting, fixing PVC Pipes (IS 12818, 6 kg/cm2), joining pipes with relevant cement, levelling, testing leakages etc. complete as directed. (Cost of E/W foundation trenches will be paid separately).
-
-
-
A) 160mm dia (Main line)
430
-
-
B) 110mm dia (Branch line)
350
-
-
Supplying, fitting, fixing PVC unequal tee joining with pipes with solvent cement, testing leakages etc. complete as directed. Size 160 mm x 160 mm x 110 mm
6
-
-
Supplying, fitting, fixing PVC reducer joining with pipes with solvent cement, testing leakages etc, complete as directed.
Size 160 mm x 110 mm
1
-
-
Supplying, fitting, fixing, joining of PVC end cap fitting with solvent cement as per specification including local carriage, testing leakage etc. complete as directed.
Size : 110mm
7
-
-
Spout Chamber
-
-
-
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mention in the approved drawing and as directed and specified. In ordinary soil
5.49
-
-
C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
1.64
-
-
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc.including racking out joints and curing etc. complete. (In proportion 1:4)
3.43
-
-
12 mm cement plastering including clearing surface and curing complete as directed. In prop. 1: 4
27.12
-
-
Supplying, fitting, fixing 110 mm dia PVC Rising pipe from the toe of main line including local carriage, testing leakage etc. complete as directed.
7
-
-
Supplying, fitting, fixing PVC bend pipe size joining with pipes with solvent cement, testing leakages etc. complete as directed. 110 mm / 90o
7
-
-
Supplying, fitting, fixing PVC Pipes (IS 12818, 4 kg/cm2), joining pipes with relevant cement, levelling, testing leakages etc. complete as directed. (Cost of E/W foundation trenches will be paid separately). 110mm dia For outlet
11.34
-
-
Boundary Wall
-
-
-
Earthwork in excavation trenches of walls, retaining walls, footing of columns, steps and septic tank including refilling (return filling) the quantity as necessary after completion of works, breaking clods in return filling, dressing, ramming, watering etc. and removal of surplus earth with all lead and lift upto 2 metre as directed and specified in following classification of soils, including bailing out of water where necessary upto depth below the existing ground level as mention in the approved drawing and as directed and specified.
(a) In ordinary soil
23
-
-
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
Flat brick soling
18.63
-
-
C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
1.4
-
-
R.C.C work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 (M15) with hard river shingles of size 6mm to 20mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering, scaffolding etc. where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
8.44
-
-
Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works as directed complete. (Measurement to be taken on the face area timbered)
-
-
-
(C) Shuttering (Column)
66.09
-
-
(B) Shuttering (Beams) with out props
33.04
-
-
1st class brick work in cement mortar in abutment and wing wall, parapet wall etc.including racking out joints and curing etc. complete. (a) In proportion 1:4
8.8
-
-
12 mm cement plastering including clearing surface and curing complete as directed. In proportion 1:4
142.08
-
-
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying complete as directed.
7.66
-
-
Supplying, fitting and fixing double leaf heavy duty iron gate, frame made from 40mm x 40mm x 6mm M.S. angle and with M.S. flat of 40mm x 6mm size as per approved design.Necessary locking arrangement for temporary closing the gate and 2nos.( minimum) strong iron hinges of M.S bars and flat of same sizes on each leaf to be embedded in C.C brick pillers as necessary including a red oxide painting to all iron works as directed and specified.(Separate payment will be made for posts).
4.28
-
-
Earthwork in filling in Marginal bund / Guide bank / Afflux bund / Canal embankment etc. to the design section and grade by obtaining earth from outside borrow pits and filling in uniform layer not exceeding 15cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps from the seat at embankment and borrow pit area, breaking clods not more than 10mm cube, ramming, watering, dressing and roughening the seat of embankment, profiling etc. Paying compensation of earth borrowed from private or forest land if any, lead upto 30 M and lift upto 1.5 M complete as directed.
72
-
-
Supporting Pillar
-
-
-
Earth work in excavation of foundation of canal structures in all types of soil as per design and drawing dressing the foundation, shoring, etc. removing the surplus spoils by head load to a safe distance from the working place and depositing required spoils in uniform layers dressing, watering, breaking clods to not more than 10mm cube with compaction complete as directed at site (including bailing out stagnant water where necessary).
a. All type of soil except soil mixed with gravel and boulders
For normal lead of 30m and lift of 1.50m
4.41
-
-
Soiling in foundation floor at all levels including filling interstices,ramming etc complete as directed and of specified thickness with 9 cm brick on flat including sand packing.
2.43
-
-
C.C work in proportion 1:3:6 in foundation / abutment / piers / wing walls etc.with hard broken stone agg. of size 13 mm to 38 mm including curing with necessary timber shuttering, scaffolding etc.where necessary complete as directed. (Shuttering, scaffolding cost will be paid separately).
0.24
-
-
R.C.C. work in slab, abutment cap and above abutment, pier cap,pedestals, dirt wall etc. in proportion 1:2:4 with hard broken stone aggregate of size 6mm to 20mm with proper reinforcement as per design including necessary curing etc. complete as directed with necessary timber shuttering ,scaffolding etc. where necessary complete as directed.( shuttering, scaffolding will be paid separately).
0.86
-
-
Centering and shuttering including propping etc. where necessary and removal of forms after completion of C.C. and R.C.C. works as directed complete (measurement to be taken on the face area timbered). Column
8.02
-
-
Supplying, fitting, fixing and laying reinforcement (TATA approved quality ) in position in R.C.C. work, including cutting, bending, cranking with two plies 0.91mm (20 BWG) annealed wire hooking tying complete as directed.
0.57
-
-
12 mm thick cement plastering including clearing surface and curing complete as directed in prop. 1:4
6.67
-
-
Sign Board
-
-
-
Supply of sign board made of 1.60mm thick MS iron sheet fitted with steel frame of size 1.05 m x 0.75m fixed with 2 Nos. 50mm dia GI (medium) pipes 2.10m above and 0.60m below ground fitted with C.C. work in proportion 1:3:6 and size 0.45m x 0.45m x 0.60m below ground including painting with approved paint including writing letters complete as directed.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements