Irrigation Department Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 93,580Document Cost
₹ 950Tender Fee
Refer Documents
Summary
Improvement Of Kaldiya Fis Under Sopd-g For The Year 2023- 24 Package 3
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_ID_35838_3Bid Award Id
ViewTender No
TID/Tech-186/Pt.-V/2023-24/09 Date.29/01/2024.Tender Authority
Irrigation Department ViewPurchaser Address
-Website
http://assamtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Renovation of 5 Nos. hume pipe Cross Drainage (Double Row) at different chainage of Main Canal & Branch Canal of Kaldiya FIS.
-
-
-
... More
Item No.1: Earthwork in excavation of foundation trenches of wall,retaining wall,footing of columns,steps and septic tank including refilling the quantity a necessary after completion of work,breaking clods in return filling,watering and ramming etc. and removal of surplus earth with all lead and lift upto 2m as directed and specified in following classification of soils including bailing out water where necessary upto depth below the existing GL mentioned in the approved drawing and as directed and specified.
888.8
-
714.96
... More
Item No.2: Dismantling the CC abutment wall and wing wall of upper portion of ground level including removing the debris from the site of works as directed
23.2
-
682.65
... More
Item No.3: Supplying fitting fixing and laying reinforcement (TATA) in position in RCC work including cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed
6.6
-
13393.96
... More
Item No.4 : Centering and shuttering including propping etc where necessary and removal of forms after completion of CC and RCC works, complete as directed (Measurement to be taken on the face area timbered).
146
-
380.66
... More
Item No.5: RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1:2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
23.2
-
10093.6
... More
Item No.6: Earthwork in back filling of structures, obtained from outside borrow pits filling in 15 cm layers, ramming, dressing, watering, including paying compensation of land if any (with lead up to 30 M and lift 1.5 M).
553
-
577.67
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements