Inland Waterways Authority Of India Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Inland Waterways Authority Of India - IWAI Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date19 Aug 2024
Closing DateCancelled
Tender Amount₹ 17,97,500
Costs
EMD
₹ 36,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWAI_815183_3Bid Award Id
ViewTender No
IWAI/GHY/SL Burhidihing/4(06)/2023-24Tender Authority
Inland Waterways Authority Of India ViewPurchaser Address
-Website
http://https://iwai.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
For surface preparation and painting of the underwater hull,above water hull plate and side plate to be undertaken after chipping ,scrapping and wire brushing as per following standards : (i) Surface preparation :By water jet cleaning (ii)Surface painting :-Marine quality painting to be done in dust free environment using airless spray machine as following -(a) 1st coat -100 micron primer (b) 2nd coat -70 micron tiecoat (c) 3rd coat -125 micron anti follic paint (d) 4th coat -125 micron anti follic glossy paint .All pipe lines should be colored as per marine color code.
300
-
-
... More
Shipside valves ,sea chest ,mud box ,strainer to be opened ,cleaned and boxed back and renewal of gasket and nut bolt as required .
1
-
-
... More
Propeller and its shaft ,bushes to be opened ,Tip clearance to be checked and fitting after repairing ,machining ,and straightening.Bades root to inspect for cracks .Propeller shaft gland packing to renew and Fwd and aft bush clearance to measure and record as required as per direction of EIC.
2
-
-
... More
Rudder assembly,shaft, bushes inspection,rudder shaft gland packing to renew and worn out stud to renew. Check bottom pintle clearance and renew spare as required ,rudder bush grease lubrication passage to clean .Manual steering system oil to drained and renew with new oil and the pipelines as required to make the steering operating with ease as required .2 nos port and stbd rudder safety chain is not available same to be fitted as per direction of EIC.
1
-
-
... More
Wheelhouse steering for manoeuvering the rudder has to be serviced with renewal of spare as required as per direction of EIC.
1
-
-
... More
2 nos main engine make- Greaves T8D2V6M, 180 BHP each major overhauling is to be done by authorised dealer service engg. with all unit tappet clearance to check and adjust.Fuel filter,lube oil and coolant filters renewal .Both engine starting system and safety parameters to check and repair.Cylinder head inspection ,liner calibration ,piston inspection,piston ring clearance ,bearing clearance to be checked and renew damaged ones with new oring and gaskets as required . Checking of exhaust system ,lubrication system ,cooling system ,fuel system and repair to be done as required with required spare as per direction of EIC /surveyor with successful trial run shown .
-
-
-
... More
Labour charges
2
-
-
... More
Cost of spares on actual plus 10% basis.
-
-
-
... More
Both Genset maker -Kirloskar 4R 1040T and 3R 1040 top overhauling of engine is to be done and same is to fitted in place with new gasket and with all unit tappet clearance to check and adjust by authorised dealer service engg including servicing and cleaning of lube oil cooler and turbo charger.Main genset electrric solenoid valve of auto start and off is not working same to be rectified .Harbour genset RPM meter not working same to be rectified .Checking of self starting system ,dynamo ,battery charger ,safety parameters and cut outs to check ,exhaust system ,lubrication system ,cooling system ,fuel system ,all foundation bolts and repair/renewal of spare to be done as required as per direction of EIC /surveyor with successful trial run shown .
-
-
-
... More
Labour charges
2
-
-
... More
Cost of spares on actual plus 10% basis.
-
-
-
... More
Both genset alternator to overhaul including exciter and AVR check, insulation checking ,heat varnishing, megger testing etc is to be done with renewal of necessary spare parts as required as per direction of EIC/ Surveyor.
2
-
-
... More
1 nos weather tight door , rudder room hatch and Fwd emergency escape hatch ,5 nos cabin window glass rubber packing renewal and 5 nos hatch cover rubber packing to renew with required spare as required as per direction of EIC/Surveyor.
1
-
-
... More
Both main engine gear box gear oil temperature , water temperature meter and RPM meter of both main engine not working and Wheelhouse to Engine room telegraph system is not working same to be repaired/ renewed as per direction of EIC.
1
-
-
... More
Installation of 500 W solar power unit with solar panel ,batteries and other applicale accessories with output to vessel apparatus as required as per direction of EIC.
1
-
-
... More
Fire extinguisher to be hydraulic tested, refilled with same refilling materials and made operational after renewal of accessories, certificate is to be produced as required as per direction of Surveyor/ EIC.
-
-
-
... More
DCP 5 KG
5
-
-
... More
Mechanical foam type 9 Ltr
5
-
-
... More
Water Co2 9 liters.
2
-
-
... More
Cropping and renewal of damaged plate of guard railing ,deck ,side shell angles ,frames railing ,bracket ,Engine room etc MS plate /Iron plate,pipe of existing thickness followed by paint with red oxide primer as required to be done as per direction of EIC..Deck plate is damaged in rudder room and have hole in 2 places ,cropping and renewal of plating as per direction of EIC. Aft deck of vessel plating (200 sqft ) is to be renewed with same MS plating thickness as required . Renewal of 3 mm thick 1 m MS supporting pipe structure for awning sheet and supply and fitting 4 nos chain hook as not available on guard railing as per direction of EIC .
1200
-
-
... More
The entire ship side shell plate from LWL to deck plate, bathroom, galley inside, engine room, store, roof, railing, railing chain, bollard, draft mark, plimsoll mark, stairs, stair railings, rooms,cabins,wheelhouse, roof along with all other structure with same existing paint and other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted as following, (a.)1 coat zinc chromate primer, (b.) 1 coat epoxy paint (c) marine quality paint to be done in dust free environment using airless spray machine of 100 micron each . All pipe lines should be colored as per marine color code. After it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of EIC/ Surveyor.
700
-
-
... More
Supply and fitting of IRS approved multipurpose 6 seater FRP boat as per direction of EIC including cost of labour and material.
1
-
-
... More
Sewage tank and motor with line to be checked , cleaned and rectified as required as per direction of EIC .
1
-
-
... More
Wheelhouse ceiling damped with leaking rain water same to be repaired /renew as there is leak in top roof of W/H which need to be arrested by renewing with same original sheet and making adjustment as per direction of EIC .
1
-
-
... More
Installment of new VHF of reputed make at wheel house as required as per direction of EIC/Surveyor.
1
-
-
... More
Kitchen tap with suction and discharge pipe fitting to be repaired / renewed as required .Three nos bathroom jetspray tap ,3 nos bathroom orissa pan seat ,3 nos bathroom exhaust fan ,3 nos bathroom flush,3 nos bathroom drain strainer, 2 nos bathroom wash basin and 3 nos wash basin discharge pipeline fitments damaged same to repair/renew .2 nos window hatch fitments to renew and 2 nos geaser not working same to repair/renew along with fittings as per direction of EIC.
1
-
-
... More
Awning sheet structure (150 sqft) is damaged on both forward and aft of deck fitting same to repair/ renew . as per direction of EIC .
2
-
-
... More
Water treatment plant of 20 lts each of Tushar not working same to repair/ renew or fitting of reputed aquagaurd as per direction of EIC.
1
-
-
... More
Provision for supply and fitting of 4 nos fire bucket along with repair of 3 nos fire bucket stand and shore supply glass cabinet with required Ms plating as per direction of EIC.
1
-
-
... More
Anchor winch motor seal is leaking and sewage pump seal is leaking same to be repaired / renewed as required as per direction of EIC.
2
-
-
... More
Anchor winch motor electric supply is not coming ,ER control panel 3 nos light switch is not working,Aft light system wiring is not working same to be repaired ,6 nos tubelight of engine room renewal ,W/H 4 nos CFL light renewal ,2 nos navigational light , supply and fitment of 2 nos search light as required as per direction of EIC.
1
-
-
... More
Bumper line rubber fender (8 m *0.25 m ) in the aft shipside of the vessel same to renewed with same thick rubber packing as required as per direction of EIC .
1
-
-
... More
15 nos curtain 1*1 m to supply and fitting as required as per direction of EIC.
15
-
-
... More
Sewage tank dischage pipeline and fitments from tank to kitchen is leaking and damaged same to repair /renew. Bumper line pipe fitting is damaged over rudder room deck area ,suction pipe of semi rotary hand pump damaged and have leak on rudder room deck area same to be repaired as per direction of EIC .
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements