Inland Waterways Authority Of India Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Inland Waterways Authority Of India - IWAI Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date21 May 2024
Closing Date13 Jun 2024
Tender Amount₹ 22,01,295
Costs
EMD
₹ 45,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWAI_808225_1Bid Award Id
ViewTender No
IWAI/GHY/Barak/4(01)/2024-25Tender Authority
Inland Waterways Authority Of India ViewPurchaser Address
-Website
http://https://iwai.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Sea chest, mud Box, strainer to be checked, repaired, cleaned and painted as required as per direction of IWT Surveyor/ EIC.
1
-
-
All fresh water valves, HSD valves, LO valves, fire line valves, sea chest valves, bilge, GS and OBD valves etc to be pressure tested, serviced / renewed. It's pipe line to be operationally tested as required as per direction of EIC/surveyor.
1
-
-
Cleaning and painting of bilges with one coat primer and 2 coats of marine quality paints as reuired as per direction of EIC/Surveyor.
1
-
-
Under water hull plate & side plate to be scraped & chipped & wire brushed from keel to LWL to remove fouling and paints and made suitable for inspection / painting. Painting of hull plate & side plate to be done by 3 coat as per painting scheme from keel to water level as required as per direction of IWT Surveyor/ EIC.
300
-
-
The entire ship side shell plate from LWL to main deck, deck plate, superstructure, bathrooms, galley, engine room, store, wheel house, railing, railing chain, crew room, roof, bollard, draft mark, mast frame, syntax water tank frame, void space, rudder room with cover, hatch cover, man hole cover, blower, inside/outside walking passage, stairs with railing and outside along with other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted by 3 coats of existing color marine paint. (1 coat zinc chromate primer, followed by two coat of existing color of marine paints ). All pipe lines should be colored as per marine color code. After it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of EIC/surveyor.
900
-
-
Down overhauling of main engine make cummins (model-N743M, 330 BHP) is to be carried out with renewal of spare parts. Checking of self starting system, safety parameters and cut outs, gauges, exhaust system/pipes with trunking/cover/glass wool, cooling system and radiator cleaning. All foundation bolts to be check as required as per direction of EIC /surveyor.
-
-
-
Labour charges
2
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Down overhauling of diesel genset make Simpson (20 KVA & 10 KVA) is to be carried out with renewal of spare parts. Checking of self starting system, safety parameters and cut outs, gauges, exhaust system/pipes with trunking/cover/glass wool, cooling system and radiator cleaning. All foundation bolts to be check as required as per direction of EIC /surveyor.
-
-
-
Labour charges
2
-
-
Cost of spares on actual plus 10% basis.
-
-
-
Entire AC&DC line/wiring, accomodation, engine room (including emergency lights), general alarm bell, D.C. horn, siren, switch boards, MCBs, navigational lights, search light, fire alarm, exhaust fan, wipers & other fittings etc. are to be checked and rectified as required as per direction of EIC/ Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Fire extinguisher to be hydraulic tested, refilled with same materials after renewal of accessories. Certificate is to be submitted as required as per direction of Surveyor/ EIC.
-
-
-
DCP 5 Kg
3
-
-
Mechanical foam type 9 Ltr
5
-
-
Water Co2 9 liters.
1
-
-
Installment of life buoys as per statutory and navigation standards, in respective place of vessels with S.I lights, rope and vessel name printed as required as per direction of surveyor/ EIC
4
-
-
Provision of life jacket as per statutory and navigation standards with vessel name printed as per direction of surveyor/ EIC
12
-
-
HSD reserve tank (Capcity- approx 2900 liters) to be opened and cleaned including labour & materials as required as per direction of EIC .
2
-
-
HSD service tank (cap- approx 200 liters) to be opened and cleaned including labour & materials as required as per direction of EIC .
2
-
-
The galley's basin tap, sink, discharge pipe, stainer and other fitting to be checked then repaired/renewed. Two no. attach bathroom's all accessories i.e taps, showers, comode & cover, flush tank, door & locks, valves, flushing tank pipe, complete wash basin, mirror, jet, exhaust window, soap stand, overheand tank with cover, towell rod, tiles, cloth hanger etc and fitments to be checked and rectified/renewed as required. Ensure leakage proof and free flow of water from over head tank as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Weather tight door, manhole and hatch cover's rubber/beading/packing to be renew, similar to existing one, as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Installation of 300 W solar power unit with solar panel, batteries and other applicable accessories with output to vessel's apparatus as required as per direction of EIC/ Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Both side rudder assembly to be dismantled, rudder stock, shaft and bushes to be checked and if required same to be build up as per existing as required as per direction of Surveyor/EIC.
-
-
-
Labour charges
2
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Both side propeller, shafts and bushes are to be opened for clearance check. Inspection of turners, bushes, shaft and blade etc then repaired & fairing with same composition of materials as required as per direction of Surveyor/EIC.
-
-
-
Labour charges
2
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Gear lever for increasing/decreasing the speed of main engine mounted on wheel house has to be serviced with renewal of spares/materials as required as per direction of EIC/surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Joystick and wooden wheel for manouvering the rudder mounted on wheel house has to be serviced with renewal of spares/materials as required as per direction of EIC/surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Sacrificial (zinc) anodes to be renewed as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
All fresh water pump and sea water pump with motors to be serviced to make fully operational as required as per direction of EIC/surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Installation of Hotplate at galley with all connection like electrical and mounting etc as required as per direction of surveyor/EIC.
1
-
-
Installation of reputed make Chimney at galley with all connection like electrical and mounting etc as required as per direction of surveyor/EIC.
1
-
-
Supply and fitting of walkie talke in wheel house as required as per direction of surveyor/EIC.
1
-
-
Supply and fitting of Diesel Fibreglass IRS Approved Multipurpose Row Boat Without OBM, Seating Capacity: 4 Person at aft with rest structure by gas cutting and welding etc as required as per direction of EIC/Surveyor.
1
-
-
Supply and fitting of Outboard Motor Engine on FRP boat as required as per direction of EIC/Surveyor.
1
-
-
Anchor chain is to be drawn out, cleaned, calibrated, serviced and painted along with chain compartment. Windlass to be serviced as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Sewage tank and motor with line to be checked, cleaned and rectified as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Servicing of Blowers(6 nos) and battery charger to make fully operational as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
All rotary hand pump to be serviced to make fully operational as required as per direction of EIC/Surveyor.
-
-
-
Labour charges
2
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Provision of emergency diesel pump (5 HP) with suction and delivery pipe etc as required as per direction of EIC/Surveyor.
1
-
-
Wooden work in kichen table, cup board, drawer, almirah, window and door are required as per direction of EIC.
1
-
-
Plywood works are required in master cabin, crew dining and surveyor cabin as required as per directionof EIC.
-
-
-
Labour charges
1
-
-
Cost of spares/material on actual plus 10% basis.
-
-
-
Installment of new VHF of reputed make at wheel house as required as per direction of EIC/Surveyor.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements