Inland Waterways Authority Of India Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Inland Waterways Authority Of India - IWAI Tender
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date22 Jul 2024
Closing Date30 Jul 2024
Tender Amount₹ 26,95,000
Costs
EMD
₹ 54,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IWAI_817458_1Bid Award Id
ViewTender No
IWAI/GHY/HSD DHANSIRI/4(07)/2024-25Tender Authority
Inland Waterways Authority Of India ViewPurchaser Address
-Website
http://https://iwai.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
For surface preparation and painting of the underwater hull,above water hull plate and side plate to be undertaken as per following standards : (i) Surface preparation :By water jet cleaning (ii)Surface painting :-Marine quality painting to be done in dust free environment using airless spray machine as following -(a) 1st coat -100 micron primer (b) 2nd coat -70 micron tiecoat (c) 3rd coat -125 micron anti follic paint (d) 4th coat -125 micron anti follic glossy paint .All pipe lines should be colored as per marine color code.
320
-
-
Sacrificial (zinc ) anode to be renewed in hull size (360*50*50)mm as required as per direction of EIC/IWT Surveyor.
1
-
-
Sea chest valves ,overboard valves ,Fire ,General service ,seawater and freshwater valves to be overhauled and pipeline to be operationally pressure tested as required with renewal of required materials - gasket ,valve seat etc.. Servicing and cleaning of sewage pump along with attached valves and pipelines as per direction of EIC/ Surveyor.
1
-
-
Sea chest ,mud box ,strainer to be opened ,cleaned and boxed back and renewal of gasket and nut bolt as required .
1
-
-
2 nos Dredge pump driving engine make- Cummins type NT-855 ,170 HP each , major overhauling is to be done by authorized dealer serv. engg along with all unit tappet clearance to check and adjust.Lube oil and fuel filters renewal including checking ,servicing and renewal of required spare .Checking of Self starting system ,safety parameters, exhaust system ,lubrication system ,cooling system ,fuel system and repair to be done as required as per direction of EIC /surveyor with successful trial run shown .
-
-
-
Labour charges
2
-
-
Cost of spares (actual + 10%)
-
-
-
1 nos 37 KVA Greaves genset major overhauling is to be done by authorized dealer serv. engg along with all unit tappet clearance to check and adjust . Lube oil and fuel filter renewal .Checking of self starting system ,safety parameters , gauges,exhaust system ,lubrication system ,cooling system ,fuel system ,all foundation bolts and repair / renewal with required spare ,leakage to arrest from flexible couplings to be done as required as per direction of EIC /surveyor with successful trial run shown .Supply of 2 nos Lube oil filter and 2 nos fuel filter .1 nos cylinder liner have crack same to be renewed.RPM meter and temperature meter repair/renewal and self start system to be repaired with required spare.
-
-
-
Labour charges
1
-
-
Cost of spares (actual + 10%)
-
-
-
1 nos 37 KVA Greaves genset complete overhauling is to be done by authorized dealer serv. engg along with all unit tappet clearance to check and adjust .Genset is non operational .Renewal of all unit bearings,connecting rod ,piston,intake and exhaust valve ,fuel injector including fuel pump ,lube oil pump ,water pump,all filters along with flexible coupling ,orings and gasket where required .There after checking of self starting system ,safety parameters, gauges,exhaust system ,lubrication system ,cooling system ,fuel system ,all foundation bolts and repair / renew with required spare and make genset operational as per direction of EIC /surveyor with successful trial run shown .
-
-
-
Labour charges
1
-
-
Cost of spares (actual + 10%)
-
-
-
2 nos air compressor engine to be serviced by authorized dealer serv. engg including checking of self starting system ,safety parameters ,gauges ,lubrication system ,cooling system ,fuel system ,all foundation bolts and repair / renew with required spare ,leakage to arrest from flexible couplings to be done as required as per direction of EIC /surveyor with successful trial run shown .
-
-
-
Labour charges
2
-
-
Cost of spares (actual + 10%)
-
-
-
The Alternator make Crompton Greaves of 37 KVA genset's servicing to be done by authorized dealer serv. engg with checking of insulation, heat varnishing and megger testing, etc. with renewal of material as required as per direction of EIC/ surveyor.
2
-
-
3 nos engine(HRP) make - Daewoo D1146, 140 HP, major overhauling is to be done by authorized dealer serv. engg with all unit tappet clearance to check and adjust including serving.Checking / repairing of self starting system ,safety parameters , gauges,exhaust system ,lubrication system ,cooling system ,fuel system ,all foundation bolts and repair/renewal of spare to be done as required as per direction of EIC /surveyor with successful trial run shown . Front HRP engine hydraulic pump and RPM meter repair/renewal,hydraulic line hose pipe repair/renewal ,shut down valve repair/renewal ,air filter and belt to renew as per direction of EIC. STBD side HRP engine RPM meter and air filter repair /renewal ,radiator servicing and hose pipe repair/renewal .Port side HRP engine RPM meter and shut down valve repair/renewal , filter and hydraulic hose repair/renewal.3 nos HRP engine v belt renewal as per direction of EIC.
-
-
-
Labour charges
3
-
-
Cost of spares (actual + 10%)
-
-
-
Hydraulic pump and pipelines to be checked by authorized dealer serv. engg and repaired alongwith leakage to be arrested with renewal of its gaskets, seals, o-rings, high pressure hoses, etc as required including material and make leak proof and operational of hydraulic lines with required pressure and ensure air free operation as per direction of EIC/ Surveyor.
1
-
-
Electrical/electronics, AC/DC line/wiring, panel of engine room, wheel house, accomodation (lights, fans etc) ,engine room (including emergency lights), general alarm bell, D.C. horn, air horn, battery charger, switch boards ,MCBs, switch boardv ,sensors, lighting, navigational lights, search light, halogen light ( 5 nos ) to supply , fire alarm, siren, bed light, table light, light cover, exhaust fan, wipers & other fittings etc. are to be checked by certified electrician and rectified the defects as required, with renewal of required materials as required as per direction of EIC/ Surveyor.Servicing of Blower and repair if required .supply and fitting of 3 nos flood light, 20 nos CFL light , 1 nos mulmeter and 3 nos battery connecting cables.WH battery charger repair /renewal.
1
-
-
The entire ship side shell plate from LWL to deck plate, superstructure, bathroom, galley inside, anchor chain, anchors, engine room, store, roof, railing, railing chain, bollard, draft mark, plimsoll mark, stairs, stair railings, rooms, roof along with other fitment etc, are to be proper cleaned, scrapped, wire brushed, chipped and painted as following, (a.)1 coat zinc chromate primer, (b.) 1 coat epoxy paint (c) marine quality paint to be done in dust free environment with 100 micron each . All pipe lines should be colored as per marine color code. After it name of vessel, deptt. and logo to be made by fluorescent sticker as required as per direction of EIC/ Surveyor.
800
-
-
Wheel house and accomodation 40 sqm floor mat renewal with the same material along with levelling cementing as per direction of EIC.
40
-
-
Supply and fitting of reputed 10nos (1m*1m) curtain ,mosquito net fitments on 4 nos door ,5 nos wall mounted fan of blade dia 200-300 mm as per direction of EIC.
1
-
-
Supply and fitting of 1 nos new Refrigerator of good brand of approx 190 litre with povision of jerk free arrangements to made to prevents vibration as per direction of EIC.
1
-
-
All rubber of weathertight door and hatches are hardened the same to be renewed alongwith missing hinges, with good quality of adhesive as required as per direction of Surveyor/EIC.
1
-
-
Galley's chimney to be repair/renew as required ,kitchen shelf and drawer to be made with wooden fitments and side plating of (25sqft ) area and floor tiles damaged same to be repaired /renew as required per direction of EIC.
1
-
-
Supply and fitting of reputed aquagaurd alongwith fitting at required place as per direction of EIC.
1
-
-
Repair of 1 nos bathroom tap,door & locks,tower bolt ,basin, shower, taps, commode base to be renewed, flush and 4 m pipeline repair/renewed ,floor tiles of approx area 30 sqft repair/renewal and ss plating of (25 sqft ) area damaged same to be repaired as required as per direction of EIC.
1
-
-
Supply of 6 nos of standard ISI marked life jacket as per new safety guidelines with certification and vessel name printed .
6
-
-
Supply of 4 nos of standard ISI marked life buoy as per new safety guidelines with certification and vessel name printed .
4
-
-
Supply of 1 nos screw driver set, plier set ,open and closed wrench set ,wooden hammer set, 1 nos spade ,4 nos 6 ton D-cycle and 1 nos grease gun .
1
-
-
Cropping and renewal of damaged plate of guard railing ,deck ,side shell angles ,frames railing ,bracket ,Engine room etc MS plate /Iron plate,pipe of existing thickness followed by paint with red oxide primer as required to be done as per direction of EIC.Wheelhouse ,upper deck and lower deck side plate have hole same to be repaired with existing plate of same thickness.
1200
-
-
Inspection ,servicing and repair of 3 nos HRP engine propulsion shaft , kort nozzle and its assembly along with nut and bolts and renewal of same if required with renewal of gland packing and checking /adjustment of clearances in the permissible range . Inspection of 3 nos kort nozzle movement and its rectification if any as per direction of EIC.
3
-
-
Dredge pump to be dismantled by authorized dealer serv. engg along with impeller , inspection cover , related pipeline , thrust bearing block inspection and servicing , renewal of seal and bearing if required and also renewal of spares if required as per direction of EIC .
-
-
-
Labour charges
2
-
-
Cost of spares (actual + 10%)
-
-
-
Dredge pump water injection 15 nos nozzle is not properly injecting water at adequate pressure same to be renewed with good quality water injection nozzle .
1
-
-
Wheel house air conditioner is out of order the same to be repair/renewed and fitting done as per direction of EIC/ surveyor.
1
-
-
Supply of reputed make 1 nos walkie talkie set along with programming of each other as require as per direction of EIC/Surveyor.
1
-
-
Supply and fitting of 2 nos 150 Ah/12v battery with box fitting as per direction of EIC.
2
-
-
Fire hose box (3 nos ) is damaged same to be repaired with plating of same thickness and painted with same color as per direction of EIC.
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements