Industries And Commerce Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Industries And Commerce Department Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date3 Dec 2024
Closing Soon24 Dec 2024
Tender Amount₹ 41,35,14,893.6 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
(a) Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes from Owner's designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Procurement and Installation of PE Fittings, PE Valves, Transition Fittings PE Pipe 20mm (PE 100 SDR11) x GI Pipe 1/2" and PE Pipe 20mm (PE 100 SDR11) x GI Pipe 3/4",Warning Mats,Saddle HDPE casing Pipes, Half concrete sleeves and other items required for execution shall also be in Contractor's scope. { Preparation of detailed route plan, making trial pits by liasoning with local authorities/ public to determine the underground utilities/ services etc. If Required, Liasioning shall be carried out by the contractor in the interest of completion of work. However, No extra payment shall be made.}. Laying rates quoted anywhere in this SOR shall be inclusive of all Liaison expenses. storage of FIM in contractor’s own store, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / site-incharge. Dewatering of trenches / pits if required as per site condition.Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies). Trenching to the required depth in all type of surface except hard rock (however putting up sufficient protection/casings whithout any additional cost at locations where proper depth cannot be attained), uncoiling / stringing of pipes, jointing of the pipe ends/ fittings/ valves by qualified personnel, using approved electro fusion techniques as per the specification. Laying Methodology (Open Cut / Moling / HDD) shall be decided as per instruction of EIC in the respective areas. (b) Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits by liasoning with local authorities/ public to determine the underground utilities/ services etc., restoration of the abandoned/ trial pits of any depth to original condition. (c) Lowering the MDPE pipeline in trench, padding around pipeline with suitable soil, laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated material, if suitable, after screening or procurement of suitable sand/ soil as per directions of EIC/ Site-In charge. Compaction with manual techniqe/ jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles/ slabs/ curb stones etc. removed during excavation. Roads, pavements, footpaths etc. shall be made motorable wherever pipeline is laid. Cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per specifications, instructions of land owners/ EIC to the complete satisfaction of local authorities. The laying shall be carried out by any methodology as per specification in consultation with EIC. The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the requirement of the Owner.

-

-

-

... More
(d) Procurement & installation of GI Sleeves, 2.5" NB x 300 mm length to 3" NB x 300 mm length GI Sleeve / Half Round Concrete Sleeves for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job. Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of EIC. (e) Preparation, Certification and submission of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements. Restore all surrounding ground features to that as existing before and as directed by EIC, which would include replanting of any uprooted trees etc. Pneumatic testing and commissioning as per specification and approved procedures , providing all tools and tackles, test ends, Nitrogen, instruments, manpower and other related accessories as per the instructions of the EIC. Returning of all unused material to Owner stores on completion of Gas Charging. Submission of all documents required for contract closure as mentioned in the contract. Any other activities related to operation / safety / statutory / maintenance of the works not mentioned above shall also be covered under the Scope of work and has to be completed by the Contractor within specified schedule without any extra cost to Owner. (f) Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge.

-

-

-

... More
(g) Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise. (h) Includes laying of pipeline in all type of surface except hard rock i.e. all kinds including Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after raking up of hard surface of any type. Roads, Pavement, Footpaths etc. shall be made motorable once the pipeline is laid. (i) Laying using any method (Open trench including chipping method, Moling and/or HDD) with or without casing, it Includes survey of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by EIC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the the pipe dia. Jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction, submission of as-graphs and as-built drawings as per the attached specification and the instruction of EIC/ Owner. (j) Taking of UTM coordinate at every 10 mtr. of interval, Refrence Points with Landmarks & inform to Owner in the approved format. Coordinate shall be taken as per instrument approved by Owner. (K) Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract.

-

-

-

... More
MDPE Pipeline laying in all type of surface except hard rock by open cut method without casing

-

-

-

... More
Laying of pipeline in all type of surface except hard rock by open trench method after raking up of surface of any type . Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 1 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 20 mm dia pipe

15000

-

4050000

... More
Laying, testing, purging with nitrogen & commissioning of 32 mm dia pipe

11210

-

4035600

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

11400

-

5244000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

3800

-

1938000

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

25000

-

13500000

... More
MDPE Pipeline laying in all type of surface except hard rock by open cut method with casing ( Including supply & installation of HDPE casing pipe)

-

-

-

... More
Laying of pipeline in all type of surface except hard rock by open trench method after raking up of surface of any type including supply & laying of HDPE casing pipe. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 1 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 20 mm dia pipe

6500

-

2600000

... More
Laying, testing, purging with nitrogen & commissioning of 32 mm dia pipe

590

-

306800

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

600

-

444000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

380

-

319200

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

784400

... More
MDPE Pipeline laying using manual Moling Technique without casing

-

-

-

... More
Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 20 mm dia pipe

35000

-

19250000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

380

-

380000

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

814000

... More
MDPE Pipeline laying using manual moling technique with casing ( Including supply & installation of HDPE casing pipe)

-

-

-

... More
Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 20 mm dia pipe

500

-

360000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

380

-

543400

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

1280200

... More
MDPE Pipeline laying using Directional Drilling Technique without casing

-

-

-

... More
Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. Indicative Stretch is 3 km and above & may vary as per site condition.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 20 mm dia pipe

25000

-

7750000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

30020

-

19513000

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

56250

-

38250000

... More
MDPE Pipe laying using Directional Drilling Technique with casing ( Including supply & installation of HDPE casing pipe)

-

-

-

... More
Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 20 mm dia pipe

500

-

235000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

760

-

805600

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

954600

... More
Pipeline laying in Jack boring/cased crossing / Auger boring crossing - (Including supply & installation of HDPE casing pipe) in all types of soil

-

-

-

... More
Laying of MDPE pipes with casing by cased crossing. It includes survey of the underground utilities, submission of profile for approval, execution of the work as per the standard procedure, including , excavation of the pits, Supply & laying of HDPE casing pipeinsertion/pulling of the MDPE pipe, removal of malba, subsequent backfilling and restoration of the facility crossed as per original condition, including supply of all other materials, equipment, consumables, manpower etc. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 2 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

380

-

779000

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

1702000

... More
MDPE Pipeline laying using manual Moling Technique/HDD/Auguar Boaring, Jack Boring etc without casing

-

-

-

... More
Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates. Indicative Stretch is 3 km and above & may vary as per site condition.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 32 mm dia pipe

103250

-

57820000

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

101400

-

62868000

... More
MDPE Pipeline laying using manual Moling Technique/HDD/Auguar Boaring, Jack Boring etc with casing

-

-

-

... More
Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 32 mm dia pipe

1180

-

1227200

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

2400

-

2880000

... More
MDPE Pipe line laying in Hard rock using open cut method (Chiselling) or Hard Rock drilling methodology

-

-

-

... More
(a) Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes from Owner's designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Procurement and Installation of PE Fittings, PE Valves, Transition Fittings, Warning Mats, HDPE casing Pipes, Half concrete sleeves and other items required for execution shall also be in Contractor's scope. { Preparation of detailed route plan, making trial pits by liasoning with local authorities/ public to determine the underground utilities/ services etc. If Required, Liasioning shall be carried out by the contractor in the interest of completion of work. However, No extra payment shall be made.}. Laying rates quoted anywhere in this SOR shall be inclusive of all Liaison expenses. storage of FIM in contractor’s own store, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / site-incharge. Dewatering of trenches / pits if required as per site condition.Repairing of all damaged utilities if any, and payment of any compensation (if claimed by owner / other utility agencies). Trenching to the required depth in hard rock (however putting up sufficient protection/casings whithout any additional cost at locations where proper depth cannot be attained), uncoiling / stringing of pipes, jointing of the pipe ends/ fittings/ valves by qualified personnel, using approved electro fusion techniques as per the specification. Laying Methodology (Open Cut / Rock drilling) shall be decided as per instruction of EIC in the respective areas. (b) Preparation and getting approval of schedules, execution procedures, drawings/ sketches/ wherever required, making trial pits by liasoning with local authorities/ public to determine the underground utilities/ services etc., restoration of the abandoned/ trial pits of any depth to original condition. (c) Lowering the MDPE pipeline in trench, padding around pipeline with suitable soil, laying of PE warning mat over the pipeline along the complete route and backfilling with available excavated material, if suitable, after screening or procurement of suitable sand/ soil as per directions of EIC/ Site-In charge. Compaction with manual techniqe/ jumping jack compactor and water at subsequent layers of 150mm, placement of all tiles/ slabs/ curb stones etc. removed during excavation. Roads, pavements, footpaths etc. shall be made motorable wherever pipeline is laid. Cleaning the area of all unserviceable materials, debris, excess earth near trenches to the designated disposal area as per specifications, instructions of land owners/ EIC to the complete satisfaction of local authorities. The laying shall be carried out by any methodology (Open Cut / Rock drilling) as per specification in consultation with EIC. The list of areas where the pipeline to be laid/ allocation of work will be done after awarding of the tender. The quantities are tentative and it may be changed during the tenure of contract as per the requirement of the Owner.

-

-

-

... More
(d) Procurement & installation of GI Sleeves, 2.5" NB x 300 mm length to 3" NB x 300 mm length GI Sleeve / Half Round Concrete Sleeves for domestic connections/ commercial and industrial installations as per Instruction of Owner/Owner's representative for satisfactory completion of job. Excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, firm fixing of the sleeves with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of pipe as defined in technical specification / instruction of EIC. (e) Preparation, Certification and submission of (DPR) daily progress reports, graphs, As-built drawings, crossings details, utility graphs and deviation statements. Restore all surrounding ground features to that as existing before and as directed by EIC, which would include replanting of any uprooted trees etc. Pneumatic testing and commissioning as per specification and approved procedures , providing all tools and tackles, test ends, Nitrogen, instruments, manpower and other related accessories as per the instructions of the EIC. Returning of all unused material to Owner stores on completion of Gas Charging. Submission of all documents required for contract closure as mentioned in the contract. Any other activities related to operation / safety / statutory / maintenance of the works not mentioned above shall also be covered under the Scope of work and has to be completed by the Contractor within specified schedule without any extra cost to Owner. (f) Final clean-up of right-of-use or area disturbed by contractor during their construction activities for laying of pipeline works and disposal of debris and surplus material to designated disposal areas and backfilling of trench and compaction of the same as per satisfaction of Owner and / or as directed by Engineer–in–charge. (g) Handing over the completed works to Owner for their operation/ use, reconciliation of material area wise.

-

-

-

... More
(h) Includes laying of pipeline in hard rock & in all types of surfaces i.e. all kinds including Kutcha, metal, concrete (PCC/RCC), bituminous, tiled, brick lined etc. after raking up of hard surface of any type. Roads, Pavement, Footpaths etc. shall be made motorable once the pipeline is laid. (i) Laying using any method (Open Cut / Rock drilling) with or without casing, it Includes survey of the under ground utilities, submission of site plans/layout drawings and HDD profiles for approval by EIC, execution of the work as per the specification, including excavation of the pits, moling with hole size not exceeding 20% of the the pipe dia. Jointing and insertion of the carrier pipe in casing pipe (on case to case basis) and subsequent backfilling, compaction, submission of as-graphs and as-built drawings as per the attached specification and the instruction of EIC/ Owner. (j) Taking of UTM coordinate at every 10 mtr. of interval, Refrence Points with Landmarks & inform to Owner in the approved format. Coordinate shall be taken as per instrument approved by Owner. (k) Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified schedule at no extra cost to Owner. All the work shall be executed in accordance with the provision of contract. (l) Survey of the under ground utilities, submission of profile for approval, execution of the work as per the standard procedure attached, including excavation of the pits, Jointing and insertion of the carrier pipe, subsequent backfilling, compaction, submission of as built graphs as per attached specification and the instruction of EIC / Site Engineer of Owner. The all other activities as described in the SOR Item No. 1 which will be required to complete the work in all respect shall be scope of the Contractor within the quoted rates.

-

-

-

... More
MDPE Pipeline laying in hard rock by open cut method without casing

-

-

-

... More
Laying of pipeline in hard rock by open trench method after raking up of surface of any type. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 2 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 32 mm dia pipe

1180

-

1404200

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

1200

-

1488000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

760

-

972800

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

976800

... More
MDPE Pipeline laying in hard rock by open cut method with casing ( Including supply & installation of HDPE casing pipe)

-

-

-

... More
Laying of pipeline in hard rock by open trench method after raking up of surface of any type including supply & laying of HDPE casing pipe. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 2 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 32 mm dia pipe

590

-

796500

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

1200

-

1800000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

380

-

608000

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

1339400

... More
MDPE Pipeline laying in hard rock by HDD method without casing- Hard rock drilling using diamond cutter

-

-

-

... More
Laying of MDPE pipes without casing by rock drilling in all types of hard rock. It includes survey of the underground utilities, submission of profile for approval, execution of the work as per the standard procedure, including , excavation of the pits, insertion/pulling of the MDPE pipe, removal of malba, subsequent backfilling and restoration of the facility crossed as per original condition, including supply of all other materials, equipment, consumables, manpower etc. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 2 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

1200

-

13512000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

380

-

5700000

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

11840000

... More
MDPE Pipeline laying in hard rock by HDD method with casing- Hard rock drilling using diamond cutter (Including supply & installation of HDPE casing pipe)

-

-

-

... More
Laying of MDPE pipes with casing by rock drilling in all types of hard rock. It includes survey of the underground utilities, submission of profile for approval, execution of the work as per the standard procedure, including , excavation of the pits, Supply & laying of HDPE casing pipeinsertion/pulling of the MDPE pipe, removal of malba, subsequent backfilling and restoration of the facility crossed as per original condition, including supply of all other materials, equipment, consumables, manpower etc. Roads, Pavement, Footpaths, Kutcha etc. shall be made motorable once the pipeline is laid. The other activities are as per SOR Item No. 2 and as detailed in specification and as per the instructions of the EIC / Site engineer of Owner.

-

-

-

... More
Laying, testing, purging with nitrogen & commissioning of 63 mm dia pipe

600

-

7620000

... More
Laying, testing, purging with nitrogen & commissioning of 90 mm dia pipe

380

-

6384000

... More
Laying, testing, purging with nitrogen & commissioning of 125 mm dia pipe

740

-

13394000

... More
Restoration of Trenches / Pits

-

-

-

... More
Restoration of asphalt / concrete /Tiles/Kerb Stone/ red stone roads / pavement/ pavor block etc. including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness. Note: 1. Restoration Job to be completed within 6 Weeks from the date of Excavation for pipeline laying / As Per Instruction of EIC. 2. During rains, restoration of asphalt shall be allowed with addition of emulsion or as per instruction by local authorities. 3. Wherever the top surface width is more than the approved trench width, restoration payment will be made as per approved trench width only. Any excavation/ restoration above the approved trench width shall not be liable for payment. 4. In case of any penalty imposed by NH/State/ local/ Statutory authority, the same shall be recovered/ debited from the vendor. 5. In case restoration job has been carried out by NH/State/ local/ Statutory authority due to poor job/before the restoration by vendor, risk and cost towards the same shall be payable by vendor. 6. For all restoration job carried out by vendor, Municipal Corporation may carry out inspection of the restoration jobs. Vendor to coordinate for their visits as and when required. 7.obtaining no objection certificates from the concern local authorities / land owners / third party inspection agencies designated by land owing agencies and Owner.

-

-

-

... More
Pavers- 80 mm thk. Of M35 Grade

5600

-

9520000

... More
Brick Soling / Channels etc.

600

-

660000

... More
CC Road

600

-

600000

... More
Ashphalt Road

1000

-

860000

1000

-

400000

... More
Red Sand Stone/Kerb Stone

500

-

200000

... More
Installation of Valve Chambers including supply of MDPE valve

-

-

-

... More
All civil works including procurement of materials, excavation of pit, piping supports including all PCC, RCC and Brick works for valve pits, pedestals with insert plates as required, sealing of pipes in pits, providing cover etc., finishing, clean up and restoration. The work shall be executed as per specification.

-

-

-

... More
Supply & Installation of PE Valve 32 mm dia and Construction of RCC Valve Chambers - Size (L x W) - 1.0 m x 1.0 m

40

-

812000

... More
Supply & Installation of PE Valve 63 mm dia and Construction of RCC Valve Chambers - Size (L x W) - 1.0 m x 1.0 m

120

-

2904000

... More
Supply & Installation of PE Valve 90 mm dia and Construction of RCC Valve Chambers - Size (L x W) - 1.5 m x 1.0 m

40

-

1380000

... More
Supply & Installation of PE Valve 125 mm dia and Construction of RCC Valve Chambers - Size (L x W) - 1.5 m x 1.5 m

80

-

3536000

... More
Fabrication & Installation of Pipeline Markers

-

-

-

... More
Procurement and Installation of Route Markers / Pole Markers / Plate Markers as per the attached drawings, along the route / along boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, procurement and application of approved color and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawings, specification and instruction of Engineer-in-Charge.

-

-

-

... More
RCC Route Markers

9000

-

6300000

... More
Pole markers with foundation

1200

-

7080000

... More
Laying of Brick layer/ Concrete

-

-

-

... More
Providing single layer of Brick / Concrete / or impact resistant tape to entire width of trench above Warning Mat placed in trench over the laid pipeline as per OISD 226, standard drawing, specification and instruction of Owner. (Rate to include cost of all labour, tools, tackles, equipment, hire charges & supply of all materials etc.)

-

-

-

... More
Brick Layer for width of PE pipeline trench as per drawing (75 mm thk.)

1000

-

400000

... More
Concrete for width of PE pipeline trench as per drawing (80 mm thk.)

1000

-

300000

... More
MDPE Repair Activity (After Commissioning and Pipeline handed over to O & M team)

-

-

-

... More
MDPE pipe Line Repairing including excavation, leakage arrest, jointing and restoration of any dia upto 63 mm including supply and installation of all fittings required. MDPE Pipe required shall be issued by Owner as free issue material. (Joint Nos.)

20

-

104000

... More
MDPE pipe Line Repairing including excavation, leakage arrest, jointing and restoration of any dia above 63 mm including supply and installation of all fittings required. MDPE Pipe required shall be issued by Owner as free issue material. (Joint Nos.)

20

-

118000

... More
DRS / MRS / Metering Station works

-

-

-

... More
Installation of DRS / MRS / Metering Skid

-

-

-

... More
Receiving and taking over, handling, loading, transportation and unloading of DRS / MRS / Metering Skid from Owner's designated stockyards to site, installation at foundation (including supply of all structural items) and hooking up with PE pipe including all works as required to complete the job as per the drawings and specification, scope of work mentioned in tender doucment. The scope includes supply of transition fittings and other MDPE and CS fittings as per requirements and various associated works (including steel welding) to commission DRS / MRS / Skid Note: 1) Amount towards civil work shall be payable as per related SOR items. 2) Rate to include cost of all labour, tools, tackles, equipment, hire charges (this rate not in duplicacy with clause no. 3.4). 3) Bolts, nuts, washer, U-clamps, gaskets etc. if required during installation shall be procured and supplied by the Contractor within the rate quoted. These items shall not be separately measured and paid.

-

-

-

... More
DRS /DCU

10

-

292000

... More
MRS / Metering Skid

10

-

456000

... More
Providing PNG support services as Jointer (Skilled Category) for carrying out the following jobs i.e., Gas leak problems, Testing, Fusion etc.

30

-

51000

... More
Installations of Service Regulator : Installation & Fixing of regulator with associated inlet and outlet connections / fittings

-

-

-

... More
Receiving, handling, loading, transportation and unloading of owner supplied Service Regulator from Owner's designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Installations of Domestic Regulator / Domestic Meter / Service Regulator with all associated work at foundation and hooking up with PE pipe line including all civil & structural work as per requirement of EIC. The scope includes supply of transition fittings and other MDPE, GI and CS fittings as per requirements and various associated works (including steel welding, if required) to commission Service Regulator.

-

-

-

... More
Service Regulator (25 SCMH)

1000

-

5100000

... More
Service Regulator (50 SCMH)

500

-

2550000

... More
Service Regulator Boxes

-

-

-

... More
Supply and installation of Service Regulators Boxes as per drawing attached and as per directions of EIC.

1600

-

6080000

... More
CIVIL WORKS (Excavation of Hard Rock , PCC & RCC )

-

-

-

... More
If any hard rock strata / large boulders/ PCC / RCC is encountered during excavation exceeding 1.0 m in any direction of the trench and removable only by chisel / pneumatic chisel / drill as per the specifications. And approved coarse sand / soft soil free from any impurities like clay, mica and soft flaky pieces will be used as Pre & Post Padding of 100 mm in trench of hard rock and morrum/boulder. The rates are payable over and above the Laying rates as per relevant SOR item.

-

-

-

... More
Excavation of Hard Rock, PCC & RCC ( More Than 1 Meter in Length & Width And 150 MM Thick):

730

-

1168000

... More
Excavation of Morrum / Boulder/PCC/RCC ( Less Than 1 Meter in Length & Width And 150 MM Thick)::

1000

-

830000

... More
PLAIN CEMENT CONCRETE

-

-

-

... More
Supplying and laying plain cement concrete of grade 1:3:6 (M 10) with stone aggregate 40mm down grade (including shuttering if required) in all levelling courses under foundations, mass concrete works, chambers, trenches,floors and any other locations at all depths complete in all respects as per drawings, specifications and directions of the NEGDCL/VCS. 

150

-

1020000

... More
NOTES: Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.

-

-

-

... More
REINFORCED CEMENT CONCRETE

-

-

-

... More
Providing and Laying in position Machine batched and machine mixed Design mix/ Ready mixed for Reinforced Cement Concrete work  of grade M-25 using 20mm down size graded aggregate at all depths and heights using cement content as per approved design mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of RMC as applicable, including cost of centering, shuttering and admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete  (improve workability without impairing strength and durability) but excluding cost of reinforcement as per direction of NEGDCL/VCS. Mechanical mixers with Hopper along with Weigh Batcher shall also be permitted for use at site with the approval of NEGDCL/VCS to produce Design Mix Concrete of specified grade.

200

-

1780000

... More
NOTES: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as,  minimum 43 grade OPC/PPC cement including sulphate resistant cement if required, coarse and fine aggregates, admixtures, other minor construction materials, testing of concrete, curing etc. with all bye works  complete. 2. The reinforcement shall be paid separately vide respective item.

-

-

-

... More
REINFORCEMENT STEEL

-

-

-

... More
Supplying, Fabricating and Fixing in position TMT Grade Fe 500D reinforcement conforming to  IS1786 at all levels and positions including the cost of transport, straightening, cutting, bending, cranking, welding, provision of necessary chairs and spacers, preparation of bar bending schedule and getting the same approved by NEGDCL/VCS etc., complete as per drawings and specifications and including cost of binding wire, labour, testing etc., all complete  in all respects as per detailed construction drawings, technical specifications and direction of NEGDCL/VCS. The chairs and spacer bars provided will not be measured for payment.

20

-

1942000

... More
NOTES: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as reinforcement steel, binding wire etc. with all bye works and sundry works complete. 2. Chairs, Unauthorised Laps, Spacers, Binding wire, Wastage etc. shall be to contractor's account.

-

-

-

... More
BRICK WORK

-

-

-

... More
Providing and laying BRICK WORK straight or curved on plan to any radius using best quality bricks with frog/indent, conforming to sub-class A as per IS:1077 having crushing strength of not less than 50 kg/cm2 in cement mortar 1 :6 (1 Cement : 6 Coarse Sand)  in all types of foundation and superstructure at all depths/heights including projections, pillars, parapets, ornamentals of any shape, cornices, all complete including cut work, curing, scaffolding,including filling of joints with Cement Mortar 1:6 and racking of joints, etc. as per specifications, drawings and directions of the Engineer.

100

-

820000

... More
NOTE: Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC/PPC), bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work,  etc. as per requirement  with all bye-works and sundry works complete as per drawings.

-

-

-

... More
GI Chain Link Fencing & Gate

-

-

-

... More
CHAIN LINK FENCING 1.35m Ht. Supplying anderecting chainlink fencing 1.35m high on the angle iron posts atapproximately 2.5m centre to centre embedded in CC 1:3:6as per ourstandard drawing no E.1S.01.001 incl. supplying 3 strands GI barbed wire12 SWG with 4 points on 0.4m high bent arm on top of angle iron postsincl. painting vertical post with 2coats each of Red oxide and aluminiumpaint.

250

-

325000

... More
Providing and injecting approved grout in proportion recommended by the manufacturer of minimum compressive strength of 45 N/mm2 into cracks/honey-comb area of concrete/ masonry by suitable gun/pump at required pressure including cutting of nipples after curing etc. complete as per directions of Engineer-in-Charge. (The payment shall be made on the basis of actual weight of approved grout injected.) 26.35.1 Stirrer mixed Acrylic Polymer of approved make @ 2% of weight of cement used) modified Cement slurry made with non shrink compound in concrete/RCC work (Note: This item shall be operated under specific instruction of the Engineer-in-Charge.)

0.9

-

93.6

... More
Supplying, Fabricating & Erecting in position steel structures fabricated out of MS Girders, channels, Tees, angle, flats, plate, square hollow sections pipes etc. conforming to IS:2062 and/or from pipes conforming to IS:1161 for structural purpose for cascade supporting structure, loading/unloading platform, Gratings for platform, catladder,handrails, hoardings for sinages,Lcv stand, SS Tube supports, SS tube trench covers etc. of any size/dia for required design including cutting, welding, bolting, hoisting, fixing in position, including application of one coat of primer at shop and second coat of primer at site after erection and two coats of finishing paint at site .The work is to be completed in all respect as per specification, scope of work, detailed construction drawings and directions of the Engineer-in-charge.

240

-

28800

... More
Demolition of RCC/PCC

-

-

-

... More
Site clearance by demolition of RCC/PCC in foundations, buildings, Pavements etc, removing the debris or any type of material and disposal of serviceable or unserviceable material to any lead as per technical specifications and directions of the Engineer-in-charge.

10

-

23300

... More
Carrying out the work of Domestic PNG registration as per directions/instructions of the Marketing In-Charge of NEGDCL / Authorized representative including but not limited to following : 1. Enrolment & Registration of Domestic PNG Customers as per the given target. 2. Collection of filled up form along with Cheque / Demand Draft of Security Deposit amount and documents. All other activities as may be required to complete the work in all respect is defined in the Scope of work to be read along with the Special Conditions of Contract and as per instructions of MIC. Carrying out the marketing activities for Domestic PNG connection as detailed in Scope of work, complete in all respects , as per directions/instructions of the Marketing In Charge including but not limited to the following: Distribution of leaflets & FAQ, Installation of banners at prime location, Awareness cum Registration Camp , Audio/Visual Presentations, Organizing Road Shows, etc.

7000

-

1470000

... More
Ground Penetration Radar (GPR) Survey.

-

-

-

... More
Carrying out subsurface utility survey along the proposed pipeline route and/or as specified by Eingineer -In-Charge for 5 m corridor using Ground Penetrating Radar (GPR) for depth upto 5 m below the existing ground level to locate and identify all existing underground utilities /buried objects including but not limited to pipelines , sewers, conduits, cables, drain, manholes ,appurtenances etc in the proposed corridor along with location ,DGPS coordinates,depth,shape and dimensional detals of utilities . Four (4) copies of report and drawing incorporating all collected datas shall be submitted as per scope of work and direction of Engineer-in-charge .Scale of drawing shall be Planimetry (X axis 1:1000,Y axis 1:100),Longitudnal Section (Z axis 1:100) and Transverse section at critical location.

100

-

2750000

... More
NOTE: 1) Survey Agency for execution of GPR survey work to be engaged by the contractor shall be submitted for approval of NEGDCL/VCS prior to start of work. 2) GPR work shall carried in presence of Contractor's Representative

-

-

-

... More
Liaisoning with authorities during construction and testing of pipeline as required

-

-

-

... More
Approval/ NOC and Liasoning work with various authorities for starting construction, laying of pipeline as per the direction of Project in-charge () as & when required: 1. Applying permission, follow up and obtaining permission for laying gas pipeline along with OFC cable if required from the Statutory authorities, District Administration, authorities like SH, NH, Irrigation, PWD, Traffic police, Forest department, Railway etc. at desired locations within 3-6 months of intimation given by NEGDCL to vendor for applying NOC. 2. Complying with all stipulations/ conditions/ recommendations of the said authorities in line with permission/ NOC. 3. For measurement purpose payment against this line item will paid on per Kilometre length of pipeline for which approval has been obtained. 4. The above permission will be applied for any Stretch/crossing (major or minor) as per the direction of Project in-charge (NEGDCL/VCS) as & when required or as per the requirement of Site Progress. 5. Any Permission fees (Only the official payment) to be made to the statutory authorities against demand note / permission letter shall be paid by owner (NEGDCL). Note- This item will be applicable where route survey & liasoning agency had not taken approval or any additional approval is required during pipeline laying execution work then the same will be taken care by existing pipeline laying vendor as per the direction of Project in-charge (NEGDCL/VCS).

100

-

10000000

... More
Liasoning with various authorities during construction, laying, testing & Commissioning of pipelines: 1. Liasoning with statutory authorities, District Administration, local authorities/agencies, Landowners, local villagers etc. : Liaisoning / coordinating & required communications with statutory authorities, Road Authorities (NHAI/SH/PWD etc), District administration, Irrigation & Forest Dept, local agencies, land owners, local villagers, any local body etc. for facilitating encumbrance free Pipeline corridor/utility corridor/road ROW, private ROW, any encroachment on Pipeline corridor /route for pipeline laying works in order to complying with all stipulation / terms & conditions /suggestions / recommendations of the said authorities to ensure smooth execution without hindrances/delay. 2. Ensuring proper day to day basis liasoning during pipeline laying with above all concern, before & during execution of job. Proper co-ordination/liason with various authorities, local administration, utility owner (Telephone dept, Water dept, Drainage dept, Electrical dept etc.), land owner, villagers for obtaining work permit/working permission in line with NOC obtained/approval/consent in order to execute job in all respects to ensure smooth execution without hindrances/delay. 3. Any other/ additional permission/ other than original permission required will be the scope of contractor. This also includes jobs as specified in Special conditions of Contract & Scope of works relevant to liasoning works. Note- Payment shall be based on actual length of pipeline already laid under authority area. Parallel laid length in same trench of MDPE pipeline shall be not paid separately.

100

-

7000000

... More
PNG Connection to Domestic Consumers

-

-

-

... More
(a) Supply, loading, storing, unloading and installation of GI pipes, including supply of GI fittings/accessories, Fittings of all sizes & thickness like Elbows, Hex Nipple,Tees, unions, sockets, reducers, GI plugs,Sleeves etc., installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication with supply of all materials, consumables, labour and other incidental works. The scope of work also includes installation of GI Pipes upto isolation valve only. (b) Scope of work indicated in Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works: Preparation and approval of schedules, Finalisation of optimum route from TF to IV with consent of customer/EIC/EPMC, Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to origin condition.

-

-

-

... More
(c) All above activities to be carried out as per specification to the complete satisfaction of consumer & as desired by Engineer-in-charge. (d) Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule time.

-

-

-

... More
1/2'' GI Pipe with supply of GI Pipes by Contractor

21000

-

11970000

... More
3/4'' GI Pipe with supply of GI Pipes by Contractor

500

-

315000

... More
Supply & Installation of Isolation Ball Valve

-

-

-

... More
Supply and installation of Isolation & Appliance Ball Valves as per Technical Specification and as directed by EIC

-

-

-

... More
Isolation Ball Valve 1/2 " max. 6 bar (g)

14000

-

4200000

... More
Isolation Ball Valve 3/4 " max. 6 bar (g)

200

-

100000



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.