BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Industries And Commerce Department Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date9 Oct 2024
Closing Date29 Oct 2024
Tender Amount₹ 7,93,16,880.1 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Hiring Of Contractors For Laying Of 4, 6 And 8 Inch 3-lpe Coated Steel Line Pipe

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
a)Receiving and taking-over as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3 - Layer PE coated carbon steel line pipes and Valves of size 2 inch and above from Owner designated stock-yard to Contractor's own stockyards/workshops/work-sites including preliminary activities, preparation of drawings, wherever required for crossings etc. including handling, stacking, stringing on the pipeline, Right-of-use / pipeline route alignment, carrying out inspection of company supplied materials including line pipes at the time of taking over, laying / installation of coated line pipe, associated fittings and accessories, including executing all works, "taking over", handling, including loading and unloading, transportation of Owner supplied materials other than line pipe from Owner's designated place(s) of issue to work site, arrangement of all additional lands required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline as per drawings, Specifications, other provisions of Contract document and instruction of NEGDCL/VCS, including but not limited to carrying out the following works: b)Surveying of Routes & detours required at the time of construction including marking the same in topographical sheet, preparation of AFC drawings showing survey details and submit the same to NEGDCL/VCS for review. c)Staking and installation of construction markers, clearing, fencing, grubbing, cutting of trees, fulfilling all the requirements of various statutory / environment authorities to the entire satisfaction of concerned authorities, grading of work area, Shifting of all obstruction within the ROU/ pipeline route alignment viz electrical lines/poles, telephone lines/poles, co-ordination with concerned authorities and obtain permissions from these authorities. d) Trenching to all depths by excavation in all types of soils including soft/hard rock, chiseling or otherwise cutting different types of pavement, footpath, roads etc. As required and storing excavated soil, reusable materials at designated area as directed by NEGDCL/VCS and to a width to accommodate the pipeline as per relevant standard/ specifications etc. (The minimum depth of the top of pipeline shall be 1.2 m or more from the finish of the stabilized grade level). Dewater of trenches if required as per site condition. Making trial pits as per instructions of EIC

-

-

-

... More
e) Carrying out repairs of pipe defects/replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects / damages occurring during transportation/handling. f)Checking, cleaning, aligning, bending, cutting and beveling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography and providing all requisite equipment, labor, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of welds joints found defective by NEGDCL/VCS, carrying out re-radiography and other tests as required on repaired joints. Providing PE warning mat over the pipeline etc. g) Carrying out installation of carrier pipe at all crossings like roads/nallas/marshy area (Laying of Concrete Coated Pipes) etc. at designated depths by open cut (except at cased crossings or crossings carried out by HDD method). h) Coating of field weld joints, long radius bends, buried fittings & valves etc. including supply of coating materials duly approved by Owner etc as per specification. i) Counting the number and type of trees cut in presence of DFO/concerned authorities and keeping record thereof; stacking and handing over of all cut trees. j) Installation/ lowering the pipeline in trench to required depth, supply & installation of 1.0 mm thickness HDPE yellow color warning mat over the pipeline along the complete route, padding around pipeline with suitable approved soil including supply of padding material, backfilling with available/ borrowed earth, approved excavated material and/ or other suitable soil by crowning. Compaction with jumping jack compactor and water at subsequent layers of 150mm or as directed by NEGDCL/VCS. All tiles / slabs/ curb stones etc. removed during excavation shall be placed properly. Roads, pavements, footpaths, etc. to be made motorable wherever pipeline is laid. k) Supply and Installation of slope breakers, bank protection wherever required and as directed by Owner / Owner's Representative. l)Taking of DGPS coordinate of all field joints , Reference Points with Landmarks & inform to Owner in the approved format. Coordinate shall be taken as per instrument approved by Owner m)Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline with quantity of corrosion inhibitor including pre-testing of designated sections complete as per specification and approved by NEGDCL/VCS to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples etc., and services, supervision, labor, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defects, re-testing after rectification, dewatering after successful completion of hydrotesting of entire section and as approved by NEGDCL/VCS.

-

-

-

... More
n) All tie-in, including the tie-ins with adjacent section of the pipeline. o) Protective coating of 450 micron thick two component epoxy / polyurethane (applied with the help of minimum three coats) including supply of materials duly approved by owner for all piping, Valves, fittings, structural steels etc. for buried installation and inside the valve pit. p)Final clean - up and restoration of right -of -use and disposal of debris and surplus material to designated disposal areas and re-instating the area to its earlier state and as directed by NEGDCL/VCS.. q)Precommissioning activities like swabbing, drying of the complete pipeline network and the associated facilities being installed to the specified acceptance criteria as per Owner/Owner's Representative. r) Maintaining the completed pipelines/ installation for any defect, failures during defect liability period (i.e. 12 months from date of commissioning of Pipeline). s)Ensuring proper safety as per codes & standard practices during construction, cordoning off the work area, providing warning signs, barricading and proper tools & tackles, Equipping the workers with safety boots, helmets and florescent aprons & barricading as per enclosed drawings. The barricading is to be done throughout along the trench/ welding string. t)Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified time schedule at no extra cost to Owner. The pipeline laying shall be done as per specification, code & standard & guideline by NEGDCL/VCS. u)Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 3 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be executed in accordance with the provision of contract including carrying out all temporary/ancillary/ auxiliary works required of the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for pipe commissioning activities.

-

-

-

... More
Specified NB (inch) x Wall thickness (mm) - Material of Construction

-

-

-

... More
4" x 6.4 mm thick, API 5L Gr. X52, ERW / HFW / SMLS, with 3LPE Coated Line Pipe

4000

-

5900000

... More
6" x 6.4 mm thick, API 5L Gr. X52, ERW / HFW / SMLS, with 3LPE Coated Line Pipe

3200

-

6419200

... More
8" x 6.4 mm thick, API 5L Gr. X52, ERW / HFW / SMLS, with 3LPE Coated Line Pipe

400

-

920400

... More
Notes: 1. Supply of Long Radius bends ( R = 3D) is in the Contractor scope. It shall be paid separately as per relevant SOW/SOR. Installation of the bend shall be paid as per SOW item no 9, 10 & 11 . 2. This item shall be applicable for the pipeline, fittings, accessories, valves etc. between existing / proposed underground tap off points from existing steel main grid to I.J. for U/G portion. 3. For restoration of asphalt / concrete roads, the item for construction of asphalted top/concrete top/red stone etc. shall be paid separately as per relevant SOW 4. In case, hard rock of single piece exceeding 1.5m in any direction and removable only by pneumatic chisel / drill / rock-breaker, payment shall be made separately over and above SOR item No. 9, 10 & 11 as per relevant SOR item. 5. Concrete sheathing of carrier pipe shall be paid seprately. 6. Liasioning shall be carried out by the contractor. It shall be paid separately as per relevant SOR item. 7. All fittings, flanges etc. & Bare pipe below 2" shall be in Contractor's Scope.

-

-

-

... More
EXCAVATION - HARD ROCK

-

-

-

... More
Excavation of hard rock, wherever hard rock of single piece exceeding 1.5m in any direction and removable only by pneumatic chisel / drill / rock-breaker. The rates are payable over and above the laying rates considered under SOR item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL)

150

-

212400

... More
SOFT SOIL / SAND FILLING (Preferably) - ROCK AREA/RCC DUCT

-

-

-

... More
150 mm Pre Padding & 200 mm Post Padding in pipeline trench using Soft Soil/ Sand (preferably) filling as directed by the EIC.

150

-

123900

... More
INSTALLATION OF CARRIER PIPE BY SHALLOW HDD METHOD IN ALL STRATA AT DEPTH UPTO 5 METER WITHOUT CASING PIPE

-

-

-

... More
Execution of road/other crossing by Shallow Horizontal Directional Drilling (HDD) technique including mobilization & de-mobilization at site(s), supply of all materials as per the `Scope of Supply' and all consumables, equipment, manpower & other resources and arranging the required land for site preparations and execution of, but not limited to, the following works in accordance with the specifications, drawings and as per all provisions of the contract document complete in all respect as per the instructions of the Owner / Owner's Representativer. 'Taking delivery and transportation of Owner-supplied 3LPE coated pipes to the work site from designated stockpile location, inspection of the coated pipes visually and/or with holiday detector for defects, including arranging all necessary intermediate storage area required thereof till the pipes are installed in permanent position. Complete site preparation including arranging of required land, setting up of fabrication yard, preparation of temporary arrangement for pipeline stringing, launching etc. Carrying out repair of pipe defects, replacement in the case of non-repairable defects and repairing damages to pipe coating including defects/ damages occurring during transportation and handling.

-

-

-

... More
String preparation including repair of pipe and pipe coating defects, welding, non-destructive testing of welds including 100% radiography (by X-ray), supply of films & all equipment and providing all facilities to Owner's representative(s) for examining radiographs, repair of defects in the welds and re-testing etc. Carrying out pre-installation hydrostatic testing of the complete pipeline string, as per the specifications, including repair of defects and retesting etc. Coating of the field joints of the pipe string to be installed by shallow HDD method with DIRAX heat shrink sleeves of approved make used for HDD crossings. 'Repair of all coating damages in the pipe section to be laid by shallow HDD method by full encirclement sleeves using suitable cut sections of approved quality of heat shrink sleeves of approved make. Supply & fixing of easy to install heat shrinkable duct end caps for HDPE duct for OFC-1 nos for each location (wherever OFC has to be laid along with the carrier pipeline).Maintaining useability of duct should be the responsibility of contractror. 'Installation of the pipeline and 1 runs of OFC conduits (Optional) as a bundle crossing below the Road/ other utility horizontally by shallow HDD operation to the correct profile as per the approved drawings in a pre-reamed hole of appropriate size. Carrying out post-installation coating survey as per approved procedure. Restoration, clean-up and disposal of drilling fluid, waste and all other surplus materials etc. All other works not specifically listed herein, but required as per specifications, drawings, provisions of the contract document, calculations and construction method statement, leading to successful completion of the works.

-

-

-

... More
Installation of 8" NB PE Coated Steel pipe by Shallow HDD method (Upon specific written approval of Owner / Owner's Representative)

300

-

1309800

... More
Installation of 6" NB PE Coated Steel pipe by Shallow HDD method (Upon specific written approval of Owner / Owner's Representative)

1640

-

5999120

... More
Installation of 4" NB PE Coated Steel pipe by Shallow HDD method (Upon specific written approval of Owner / Owner's Representative)

2320

-

6844000

... More
Note: 1. Payment shall be based on the actual length (Length between tie-in joints) of pipeline laid by Shallow HDD. Exact location of tie-in shall be approved by Owner/ Owner's Representative. 3. The length of Shallow HDD mentioned is tentative and may vary to the considerable extent, depending upon requirements as per site conditions and shall be decided by Owner / Owner's Representative. 4. Payment for the length of final tie-in carrier pipeline string with mainline laid by Shallow HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. 5. This item shall be executed as per specific instruction of Owner / Owner's Representative.

-

-

-

... More
REPAIR OF PIPE COATING DEFECTS ATTRIBUTABLE TO OWNER

-

-

-

... More
Carrying out repair of Holidays in Coating.

10

-

1888

... More
Carrying out repair of Cosmetic Defects in Coating. ( Repair Patch max to 30x30 Sq.cm or else coating needed to be replace)

30

-

5664

... More
SUPPLY & INSTALLATION OF CASING PIPE (BY HDD METHOD) FOR MAIN CARRIER PIPE

-

-

-

... More
a)Supply & Installation of Casing pipe (Carbon steel) by augur boring & Jacking method / Moling / HDD for crossings in all types of soils and terrain, and restoration as original of the facilities crossed and performing all works as per drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Submission of as built drawings. b)Carrying out installation of carrier pipe in the casing pipe at cased crossings. c)Checking, cleaning, aligning, bending, cutting and beveling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography and providing all requisite equipment, labor, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of welds joints found defective by NEGDCL/VCS, carrying out re-radiography and other tests as required on repaired joints. d)Precommissioning activities like swabbing, drying of the complete pipeline network and the associated facilities being installed to the specified acceptance criteria as per Owner/Owner's Representative. e)Ensuring proper safety as per codes & standard practices during construction, cordoning off the work area, providing warning signs, barricading and proper tools & tackles, Equipping the workers with safety boots, helmets and florescent aprons & barricading as per enclosed drawings. The barricading is to be done throughout along the welding string. f)Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified time schedule at no extra cost to Owner. The pipeline laying shall be done as per specification, code & standard & guideline by NEGDCL/VCS. g)Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 3 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be executed in accordance with the provision of contract including carrying out all temporary/ancillary/ auxiliary works required of the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for pipe commissioning activities.

-

-

-

... More
10" NB Carbon Steel Casing Pipe ( HDD) for 4'' NB Carrier pipe

200

-

1722800

... More
12" NB Carbon Steel Casing Pipe ( HDD) for 6'' NB Carrier Pipe

250

-

2478000

... More
14" NB Carbon Steel Casing Pipe ( HDD) for 8" NB Carrier pipe

200

-

2218400

... More
Note: Payment shall be based on the actual length of cased crossings. Casing end seals, casing insulators, vent & drain connections shall be provided by contractor. Above rates for this SOW Item for steel pipeline laying is inclusive of carrier pipe string preparation (welding, NDT, pretesting, field joints coating with special type heat shrinkable sleeves (Direx), Hydrotesting (Pre & Post), precommissioning etc) and repair of pipeline coating of carrier pipe string till the string ready for pulling. If required, HDPE duct for OFC shall be laid along with Carrier pipeline, Payment for Supply of HDPE duct and OFC shall be made separately.

-

-

-

... More
SUPPLY & INSTALLATION OF CASING PIPE (BY OPEN CUT METHOD) FOR MAIN CARRIER PIPE

-

-

-

... More
a)Supply & Installation of Casing pipe (Carbon steel) by Open Cut Method for crossings in all types of soils and terrain, backfilling and restoration as original of the facilities crossed and performing all works as per drawings, specifications and instructions of Owner/ Owner's Representative and provisions of contract document. Submission of as built drawings. b)Carrying out installation of carrier pipe in the casing pipe at cased crossings. c)Checking, cleaning, aligning, bending, cutting and beveling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography and providing all requisite equipment, labor, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of welds joints found defective by NEGDCL/VCS, carrying out re-radiography and other tests as required on repaired joints. d)Precommissioning activities like swabbing, drying of the complete pipeline network and the associated facilities being installed to the specified acceptance criteria as per Owner/Owner's Representative. e)Ensuring proper safety as per codes & standard practices during construction, cordoning off the work area, providing warning signs, barricading and proper tools & tackles, Equipping the workers with safety boots, helmets and florescent aprons & barricading as per enclosed drawings. The barricading is to be done throughout along the welding string. f)Any other activities not mentioned/ covered explicitly above, but otherwise required for satisfactory completion/ operation/ safety/ statutory/ maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified time schedule at no extra cost to Owner. The pipeline laying shall be done as per specification, code & standard & guideline by NEGDCL/VCS. g)Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 3 sets of as - built drawings and 1 soft copy and 6 copies of pipe book.) All the works shall be executed in accordance with the provision of contract including carrying out all temporary/ancillary/ auxiliary works required of the performance of the works and all other acts, deeds, matters and things necessary to make the pipeline ready for pipe commissioning activities.

-

-

-

... More
10" NB Carbon Steel Casing Pipe (By Open Cut Method) for 4'' NB Carrier pipe

100

-

696200

... More
12" NB Carbon Steel Casing Pipe (By Open Cut Method) for 6" NB Carrier Pipe

100

-

790600

... More
14" NB Carbon Steel Casing Pipe (By Open Cut Method) for 8'' NB Carrier Pipe

100

-

896800

... More
Note: Payment shall be based on the actual length of cased crossings. Casing end seals, casing insulators, vent & drain connections shall be provided by contractor. Above rates for this SOW item for steel pipeline is inclusive of carrier pipe string preparation (welding, NDT, pretesting, field joints coating with special type heat shrinkable sleeves (Direx), Hydrotesting (Pre & Post), precommissioning etc) and repair of pipeline coating of carrier pipe string till the string ready for pulling. If required, HDPE duct for OFC shall be laid along with Carrier pipeline, Payment for Supply of HDPE duct and OFC shall be made separately.

-

-

-

... More
INSTALLATION OF CARRIER PIPE (CARBON STEEL) BY TRENCHLESS METHOD WITHOUT CASING PIPE

-

-

-

... More
a)Receiving and taking-over as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3 - Layer PE coated carbon steel line pipes from Owner designated stock-yard to Contractor's own stock yards/workshops/work-sites including preliminary activities, carrying out inspection of owner supplied materials (3LPE coated carbon steel line pipe) at the time of taking over and supply of all materials (except 3LPE coated carbon steel line pipe) consumables, equipment, labor and other inputs, carrying out all temporary, ancillary, auxiliary works, as per drawings, Specifications, other provisions of Contract document and instruction of NEGDCL/VCS, including but not limited to carrying out the following works: Site Preparation, welding, radiography, coating field joints with special type heat shrinkable sleeves (Direx) pretesting of completed carrier pipe and making the string and welding of entry & exit point of HDD/boring with mainpipeline. Pre installation hydrotesting including leaks detection and repair of defects and retesting etc. for defects attributed to contractor's faulty work. Hydrotesting with mainpipeline and precommissioning activities like swabbing, drying to the specified criteria as per owner/owners representative. Purging with nitrogen and Commissioning of complete pipeline network including supply of all equipment, machinery, consumables, tools and tackles, manpower, etc., as per specification, provisions of bid document and instructions of NEGDCL/VCS. Final dossier all notes & calculations as required in the specification. Preparation of as-built drawings, pipe-books (1 set of tracing on polyester film and 6 sets of as - built drawings and 1 soft copy and 3 copies of pipe book) b)Installation of Crossings of carrier pipes by HDD / moling for Rail, Road, Nala, Canal crossings, River Crossings etc wherever required in all types of soils and terrain except Hard Rock, backfilling and restoration as original of the facility crossed and performing all works as per drawings, specifications and instructions of Owner / Owner's Representative and provisions of contract document. c)Any other activities not mentioned / covered explicitly above, but otherwise required for satisfactory completion / operation / safety / statutory / maintenance of the works shall also be covered under the scope of work and has to be completed by the Contractor within specified time schedule at no extra cost to owner. It shall be done as per specification, code & standard and guideline by Owner / Owner’s Representative.

-

-

-

... More
Installation of 4" NB 3LPE Coated Steel pipe without any casing by HDD Method

1680

-

10506720

... More
Installation of 4" NB 3LPE Coated Steel pipe without any casing by Moling Method

120

-

311520

... More
Installation of 6" NB 3LPE Coated Steel pipe without any casing by HDD Method

1000

-

6962000

... More
Installation of 6" NB 3LPE Coated Steel pipe without any casing by Moling Method

200

-

660800

... More
Note: a) Payment shall be based on the actual length (i.e. Length between tie-in joints) of pipeline laid by HDD / Manual Moling. Exact location of tie-in shall be approved by Owner/ Owner's Representative. b) Above Rate for SOW Item for steel pipeline laying is inclusive of carrier pipe string preparation (welding, NDT, pretesting, Coating field joints with special heat shrinkable sleeves (direx), Post Hydrotesting,precommissioning etc.) c) Payment for the length of final tie-in carrier pipeline string with mainline laid by HDD/moling are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere.

-

-

-

... More
INSTALLATION OF CARRIER PIPE BY HDD METHOD WITHOUT CASING PIPE. (HARD ROCK DRILLING USING DIAMOND CUTTER )

-

-

-

... More
Installation of carrier pipes by rock drilling for river or wherever required in all types of hard rock. It includes survey of the underground utilities, submission of profile for approval, execution of the work as per the standard procedure, including , excavation of the pits, insertion/pulling of the carrier pipe, removal of malba, subsequent backfilling and restoration of the facility crossed as per original condition, including supply of all other materials, equipment, consumables, manpower etc including string preparation of pipes, welding, welding repair, radiography, coating of field joints with special type of Heat Shrink Sleeve (Direx) and repair of pipeline coating with special repair patch materials as per Specification, pre-testing etc. of complete string made for crossing/ laying access for Contractor etc. and execution of, but not limited to, following works in accordance with specifications and instruction of Engineer-in-Charge and as per all provision of Contract Document. Balance activities as defined in SOR Item 1 to 10 above

-

-

-

... More
Installation of 4" NB 3LPE Coated Steel pipe without any casing by HDD Method

120

-

1189440

... More
Installation of 6" NB 3LPE Coated Steel pipe without any casing by HDD Method

200

-

2478000

... More
Note: The length of HDD mentioned is tentative and may vary to the considerable extent depending upon requirements as per site conditions. The length mentioned in SOW is indicative for all the crossing to be done by HDD, numbers and locations shall be decided by Engineer-in-Charge depending upon site condition. Payment for the length of final tie-in carrier pipeline string with mainline laid by HDD are inclusive in this above item rate. No separate payment shall be made under other clauses mentioned elsewhere. Payment shall be based on the actual length (i.e. length between tie-in joints) of pipeline laid by HDD. Exact location of tie-in shall be approved by Owner/ Owner's representative. Above Rate for SOW Item for steel pipeline laying is inclusive of carrier pipe string preparation (Welding, NDT, Pretesting, Coating, Hydrotesting, Precommissioning etc.). This item shall be executed as per specific instruction of Engineer-In-Charge after confirmation of soil/bore log data.

-

-

-

... More
Striping/removal of 3LPE coating from 3LPE coated line pipes by suitable method.

10

-

30680

... More
SUPPLY AND INSTALLATION OF ROCK SHEILD

-

-

-

... More
a) Supplying & providing approved type of extruded polyethylene mesh (rock shield) on mainline pipe to protect the coating against rocky soil including supply of all inputs such as labour, materials, consumables etc. necessary to perform and complete the work in all respects in accordance with the specifications, manufacturer's recommendation and instruction of Site Engineer / Eingineer-In- Charge. b) Rock shield shall provide external pipe protection from backfill rock damage and/or abrasion damage during pipe operation of the exterior coating; minimum thickness of 11mm, flexible PVC (polyvinyl chloride), strand extruded rock shield pads. The rock shield shall be extruded from an elastomeric plastic material of which the basic resin is prime virgin polyvinyl chloride. The PVC compound shall not contain any scrapped, reclaimed or recycled material whatsoever. Minimum weight of rock shield should be 0 .825 lbs/square foot. Rock shield is to be constructed of randomly extruded strands of elastomeric PVC plastic and must be bi-directional. This means that it should sufficiently protect the pipe regardless which side of the rockshield faces the pipe. The color of the rockshield shall be yellow to provide higher visibility to third party excavators.

-

-

-

50

-

7080

50

-

9440

20

-

4720

... More
Note: 1.Rock shield pads shall be affixed to pipe utilizing non-metallic bands of filament tape. 2. Spacing of non-metallic banding shall not exceed 80 cm on center. 3.Rock shield shall completely encircle the pipe with a minimum overlap of 10 cm. Overlap shall be located at the bottom radius (6 o’clock position). 4.Back-fill should be “shaded” into the trench during back-fill procedure. Do not dump back-fill directly on protected pipe. 5. Follow manufacturers recommendations.

-

-

-

... More
INSTALLATION OF SV STATIONS

-

-

-

... More
a) All works for installation of all underground & above ground piping at all elevations and below ground at all depth for Sectionalizing Valve Station as per P&ID and GAD in all type of terrains and soils including "Receiving and taking over" as defined in the specifications, handling, loading, transportation and unloading of all Owner supplied materials i.e. extended stem, butt welded, sectionalizing ball valve, other types of valves, line pipes for mainline of size 2" and above from Owner's designated place(s) of issue to work site, Supply of pipes, fittings & valves for piping of size below 2" , supply of all consumables, materials, manpower and carrying out all mechanical works of underground and above ground piping including fabrication, welding, non-destructive testing of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion, coating and external painting as required. b) Installation of instruments like pressure/ temperature instruments/ gauges, provision for tubing to the actuator in future, obtaining all statutory clearances, approvals and permissions for the works (wherever required). Excavation in all types of soil including soft / hard / rocky surfaces, providing 200 mm thk PCC for valve base support, backfilling and compaction with approved soil for installation of pipes and fittings, etc including sand padding all around the valves in SV station, pipe supports and fencing would be paid against separate SOR s ), painting, finishing, clean-up and restoration of site; preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

3

-

357540

2

-

309160

1

-

189980

... More
Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the contractor within the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOW Item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit rate provided elsewhere in the SOW. 4. Fittings, Flanges, Valves of below 2 inch in contractor scope and inclusive in rate quoted. 5. 2" and above (fittings & flanges etc.), material supply is also in the contractor scope. It shall be paid separately on actual basis.

-

-

-

... More
COMPLETE WORKS FOR TAP-OFF POINTS (NOT PART OF SV STATION COMMON VALVE CHABMBER)

-

-

-

... More
Works at Future Connections: Complete works of design, engineering, installation of all piping, valves, fittings at all depths inside the pit in all types of terrains and soils including transportation, handling of Owner supplied material from Owner's designated issue point(s) to work site, supply of Contractor's supplied materials to work site(s), all mechanical works including fabrication, welding, non destructive testing of welds, weld repairs/ retesting, cleaning/ flushing, pre-hydrotesting & hydrostatic testing, dewatering, functional testing, cutting of mainline and beveling (if required), tie-in of valve assembly, including radiography of tie-in joints, corrosion, coating and external painting as required. All civil works including excavation of pit, piping supports including all PCC and RCC works for pedestals with insert plates as required, construction of valve chamber including with supply of all material and finishing, clean up and restoration of site, filling and grading of area around valve station for avoiding any local flooding of area and as per specification and instructions of Owner/Owner's representative. Preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in- charge.

-

-

-

... More
8" x 4"

1

-

107380

... More
6" x 4"

5

-

460200

... More
4" x 4"

5

-

306800

... More
Note: 1. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the contractor with in the rate quoted. 2. This work is exclusive of all works associated with main pipeline covered under SOR item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. All civil / structural works including area fencing and gate, pipe supports, valve chamber shall be paid separately as per unit rate provided elsewhere in the SOR. 4. 2" and above (fittings & flanges etc. ), material supply is also in the contractor scope. It shall be be paid separately under Supply item provided elsewhere in the SOR.

-

-

-

... More
PURGING & INERTISATION OF PIPELINE INCLUDING SUPPLY OF NITROGEN

-

-

-

... More
Purging and inertisation of pipeline section between the two isolation valves with nitrogen to make the pipeline section free from oxygen including supply of required quantity of nitrogen and all equipments, tools and tackles, manpower etc. required for the works and as per instruction of engineer in charge. Complete with necessary regulator, hoses, pressure guage, connections with tools and tackles. Submission of purging plan for approval before actual work and complete assistance for purging. By filling and pressurizing with nitrogen upto a pressure of 2 bar(g). Supply of nitrogen for maintaining 2 bar (g) of pressure in steel pipeline after purging. Contractor shall be responsible for maintaing the pressure up to 2 bar(g) till commissioning.

-

-

-

8240

-

97232

6240

-

88358.4

700

-

16520

... More
PIPELINE LAYING / INSTALLATION OF ABOVE GROUND PIPELINE

-

-

-

... More
Welding of pipes with Pipes/fittings/Valves:

-

-

-

... More
a) Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. b) Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, etc. to match with grinding the edges of pipes, fittings etc. to match with the matching edges of uneven / different thickness wherever required fit - up bending, preheating wherever required, welding etc. pipe fittings like elbows, tees, reducers, weldolets, sockolets, etc. vent and drain point connection etc. including providing stub - in connection, fabricated fittings and reinforcement pads etc. as required. Carrying out Non-destructive testing as per specification & instruction of EIC.

-

-

-

1

-

5546

5

-

20650

6

-

21240

5

-

17110

5

-

13865

... More
1.5" NB

5

-

11505

5

-

10384

... More
0.75" NB

5

-

9912

... More
Notes: 1. Welding Joints under above SOW item are for Above Ground Piping only. 2. The above SOW item shall be carried out only when instructed by Engineer In charge; 3. These rates shall be applied only when permitted by Engineer In charge. 4. Supply & Installation of Assorted pipes of all rating/thickness types, pipe fittings,flanges,valve blinds etc. as required are inclusive under this SOW item, Contractor to quote accordingly. 5. All materials of size below 2" shall be in Contractor's Scope. No seperate payment shall be made for supply. 6. 2" and above (fittings & flanges etc ), material supply is also in the contractor scope. It shall be be paid seperately under relevant SOR on actual basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the contractor within the rate quoted. These items shall not be separately measured and paid.

-

-

-

... More
Welding of pipes with Flanges

-

-

-

... More
a) Receiving and taking over of all free issue materials from company’s designated place of issue, handling including lifting, transportation from Owners and / or contractors storage point to work site / workshop as applicable for fabrication or / and to work site for field fabrication and erection for all piping items supplied by COMPANY / CONTRACTOR. b) Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, flanges etc to match with the matching edges of uneven / different thickness, preheating wherever required, welding etc. including supply and fixing of all types of gaskets (including gaskets for RTJ flanges), bolts and nuts for all sizes. Carrying out Non-destructive testing as per specification & instruction of EIC.

-

-

-

1

-

5310

5

-

19470

6

-

20532

5

-

16520

5

-

13570

... More
1.5" NB

5

-

11210

5

-

9794

... More
0.75" NB

5

-

9204

... More
Notes: 1. Welding Joints under above SOW item are for Above Ground Piping only. 2. The above SOW item shall be carried out only when instructed by Engineer In charge; 3. These rates shall be applied only when permitted by Engineer In charge. 4. Supply & Installation of Assorted pipes of all rating/thickness types, pipe fittings,flanges,valve blinds etc. as required are inclusive under this SOW item, Contractor to quote accordingly. 6. 2" and above (fittings & flanges etc ), material supply is also in the contractor scope. It shall be be paid seperately under relevant SOR on actual basis. 7. Bolts, nuts, washer, U-clamps, gaskets etc. of all sizes required for piping facilities shall be procured and supplied by the contractor within the rate quoted. These items shall not be separately measured and paid.

-

-

-

... More
Erection & Testing:

-

-

-

... More
a) Complete work of erection, painting, testing and making ready for further commissioning / start - up carbon steel piping and fittings of all sizes and ratings. Supply of pipes, fittings, valves etc. below 2" & installation of, all fittings like elbow, tees, reducers, swages, weldolet, sockolets, nipples, flanges, blind flanges, spectacle blind flanges, valves etc. Contractor's scope of supply of all consumables, equipment, manpower and other resources and execution of but not limited to the following works in accordance with relevant specifications, drawings, scope of work and instruction of Owner/ Owner's Representative and as per all provisions of the contract document. b) Erection of pipes of all types and thickness over sleepers, overhead on rack and at all elevations, connecting with equipment nozzle, aligning and installation for all types of valves, all online instruments and fittings of all sizes of elbow, reducers, tees, flanges blind flange, spectacle blind flanges, branch connection / tapping, vents and drains, required for process and hydrotesting, tapping for pressure gauges thermowells sample connections, etc. c)Painting of entire system (including all pipes and accessories) as per specification, including supply of approved paints and primers, preparation of surface and application of primer and paint, identification lettering/numbering, color coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scaffolding for all heights etc. Cleaning and flushing by water /compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air / other methods approved by COMPANY. d) Cleaning and flushing by water/ compressed air, testing of the system including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/ other methods as approved by Owner. e)Completion of all such work in all respect as per scope of work and as per drawings specifications and instructions of the COMPANY and keeping in the system ready in all respects for further commissioning and start up. f) Hooking up with other system piping at battery limit. g) Preparation of isometric, fabrication drgs. Bill of materials as per specifications, drawings and instruction of Owner/Owner’s Representative

-

-

-

... More
Diameter

-

-

-

30

-

148680

60

-

226560

30

-

102660

30

-

95580

... More
2" NB (Including supply of pipe, fittings, flanges, valves and other items required).

60

-

169920

... More
1.5" NB (Including supply of pipe, fittings, flanges, valves and other items required).

60

-

162840

... More
1" NB (Including supply of pipe, fittings, flanges, valves and other items required).

60

-

155760

... More
0.75" NB (Including supply of pipe, fittings, flanges, valves and other items required).

30

-

74340

... More
Notes: 1. Bolts, nuts, washer, U-clamps, gaskets etc. required for piping facilities shall be procured and supplied by the contractor within the rate quoted. These items shall not be separately measured and paid. 2. All materials of size below 2" shall be in contractor's scope. No seperate payment shall be made for supply of material below 2'' 3. The above SOW item shall be carried out only when instructed by Engineer In charge; 4. These rates shall be applied only when permitted by Engineer In charge. 5. Supply & Installation of Assorted pipes of all rating/thickness types, pipe fittings,flanges,valve, blinds etc. as required are inclusive under this SOW item, Contractor to quote accordingly.

-

-

-

... More
Supply & Installation of SS pressure gauge (make as per recommended vendor list) as per data sheet attached in the tender

-

-

-

... More
Supply of SS pressure gauges as per data sheet and enclosed drawing and installation of pressure guages and their accessories inclusive of supply of necessary piping materials and tubings alongwith all necessary valves and fittings, fabrication and installation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard.

-

-

-

... More
Providing & Installation of SS pressure gauge (make as per recommended vendor list) as per data sheet attached in the tender

5

-

48970

... More
Supply & Installation of Temperature gauge with all accessories including Erection, Installation, testing, site calibration and commissioning along with associated accessories, fittings, tubing etc.

5

-

54870

... More
PERMANENT MARKERS

-

-

-

... More
Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved color and quality of primer and paint ( powder coated ), stencil letter cutting for numbers, direction, chainage etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of Owner/Owner’s Representative.

-

-

-

... More
Warning sign with Post & foundations as per drawing. It shall be powder coated only & before installing take approval from the EIC.

40

-

273760

... More
Kilometer Markers with Post & Foundation

16

-

118944

... More
Direction Marker with Post & Foundation

16

-

109504

... More
RCC Route Marker as per Approved drawing

320

-

358720

... More
Leak / Burst (Attributable to Company)

-

-

-

... More
All works for locating leak / burst in Company’s supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting out and removing the defective pipe, pre-testing and welding of replacement pipe NDT of welds, repair and retesting of defective welds, coating/painting of coating / painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, testing including cost of all labor materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner/Owner's Representative

-

-

-

1

-

13806

1

-

13098

1

-

12508

... More
Note: This rate is applicable for rectification of manufacturing defects in Company supplied material only.

-

-

-

... More
CONTINUOUS CONCRETE COATING (FOR CS PIPES)

-

-

-

... More
Supply of all consumables, materials and application of minimum 50 mm thk. continuous concrete weight coating of minimum density 2245 kg/m3 of minimum grade M-20 for below specified Line Pipe size and field joints thereof in all areas of work wherever required as per site condition and performing all works as per specification on the line pipe for following sizes :-

-

-

-

... More
Specified NB 8" x 6.4 mm W.T. x 50 mm Concrete Coating

50

-

123900

... More
Specified NB 6" x 6.4 mm W.T. x 50 mm Concrete Coating

100

-

200600

... More
Specified NB 4" x 6.4 mm W.T. x 50 mm Concrete Coating

200

-

306800

... More
BORE LOG

-

-

-

... More
The soil investigation includes boring, collection of disturbed samples from bore holes and visual engineering classification of soil along the pipeline route and submission of detailed report to Company. Visual classification of soil shall be in accordance with IS-1498; :IS Classification and Identification of Soils for General Engineering Purposes” Geotechnical investigation of soil shall be carried out as per relevant clauses of IS 1892 and other applicable IS standards Except for crossing location as defined below, the boring shall be carried out upto 10 m depth below NGL or 01 m. below the rock bed, if rock is encountered at a depth of less than 10 m. In case of boring at Highways (National/State), River and Railways crossings, the boring shall either terminated at a depth of 15 m below NGL or 01 m. below the rock bed on top of bed rock, if rock is encountered at a depth less than 15 m. Results of soil investigation survey shall be submitted in the form of report covering minimum the followings: Visual engineering classification of soils encountered along the pipeline route in bore log form. Depth of Ground Water Table (GWT) below NGL shall also be mentioned if encountered. Soil profiles along the pipeline route shall also be prepared and attached with the report. Regions along the pipeline route where hard rock is present and special excavation techniques like blasting, etc. needs to be adopted for excavation of pipeline trench shall be clearly indicated in the report. Test shall be carried out at approved laboratory. Summary of results obtained from tests and their interpretation to evaluate soil parameters. Visual engineering classification of soils obtained from bore holes shall be shown in Alignment sheets also whenever preparation of Alignment sheets are in SURVEYOR’S scope of work.”

10

-

224200

... More
SUPPLY & INSTALLATION OF MAJOR ITEMS

-

-

-

... More
Supply & Installation of Long Radius Bends (R = 3D), Rating 300#

-

-

-

... More
8" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

-

-

-

... More
Less than 20 degree

3

-

21948

... More
22.5 Degree

1

-

9440

... More
30 Degree

1

-

11328

... More
45 Degree

1

-

14514

... More
90 Degree

2

-

47908

... More
6" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

-

-

-

... More
Less than 20 degree

10

-

37760

... More
22.5 Degree

15

-

76110

... More
30 Degree

15

-

92040

... More
45 Degree

10

-

77880

... More
90 Degree

10

-

132160

... More
4" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

-

-

-

... More
Less than 20 degree

10

-

18880

... More
22.5 Degree

15

-

37170

... More
30 Degree

15

-

44250

... More
45 Degree

10

-

38940

... More
90 Degree

10

-

63720

... More
Supply & Installation of Elbow (R=1.5D), rating 300#

-

-

-

... More
Supply & Installation of 90 Degree Elbow (R = 1.5D), Rating 300#

-

-

-

... More
8" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

2

-

19352

... More
6" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

4

-

19352

... More
4" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

6

-

15576

... More
2" NB Material : ASTM A 234 GR.WPB (CHARPY), min. thk. XS

20

-

18880

... More
Supply & Installation of 45 Degree Elbow (R = 1.5D), Rating 300#

-

-

-

... More
8" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

2

-

13452

... More
6" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

4

-

13688

... More
4" NB, Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm

6

-

13452

... More
2" NB Material : ASTM A 234 GR.WPB (CHARPY), min. thk. XS

20

-

11800

... More
Supply & Installation of Equal Tee, Rating 300#

-

-

-

... More
8" x 8" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

10974

... More
6" x 6" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

5664

... More
4" x 4" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

5

-

15340

... More
2" x 2" ,ASTM A 234 GR.WPB (CHARPY), min. thk. XS x XS

15

-

21240

... More
Supply & Installation of Reducing Tee, Rating 300#

-

-

-

... More
8" x 6" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

11564

... More
8" x 4" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

11210

... More
6" x 4" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

2

-

13688

... More
6" x 2" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

6254

... More
4" x 2" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

8

-

22656

... More
Supply & Installation of Barred Tee/ Flow Tee, Rating 300#

-

-

-

... More
8" x 8" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

57820

... More
6" x 6" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

5

-

143960

... More
8" x 6"

1

-

48852

... More
8" x 4"

2

-

97704

... More
6" x 4"

5

-

141600

... More
6" x 2"

6

-

169920

... More
4" x 2"

6

-

52392

... More
4" x 4" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

5

-

53100

... More
Supply & Installation of Reducer, Rating 300#

-

-

-

... More
8" x 6" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

6136

... More
8" x 4" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

1

-

6136

... More
6" x 4" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

2

-

10620

... More
6" x 2" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

2

-

6372

... More
4" x 2" , Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

11

-

22066

... More
2''x3'', Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

2

-

2596

... More
3'' x 4'', Material : API 5L X 52 / ASTM A 860 WPHY 52, min. thk. 6.4 mm x 6.4 mm

2

-

4012

... More
Flanges (WNRF), Rating 300#

-

-

-

... More
8" (Material : ASTM A 694 F 52)

1

-

10738

... More
6" (Material : ASTM A 694 F 52)

2

-

15104

... More
4" (Material : ASTM A 694 F 52)

10

-

46020

... More
3" (Material : ASTM A 105 (CHARPY))

10

-

29500

... More
2" (Material : ASTM A 105 (CHARPY))

24

-

33984

... More
1" (Material : ASTM A 105 (CHARPY))

10

-

7080

... More
3/4" (Material : ASTM A 105 (CHARPY))

10

-

4720

... More
Blind Flanges (RF), Rating 300#

-

-

-

... More
8" (Material : ASTM A 694 F 52)

2

-

18880

... More
6" (Material : ASTM A 694 F 52)

5

-

33040

... More
4" (Material : ASTM A 694 F 52)

10

-

40120

... More
3" (Material : ASTM A 105 (CHARPY))

10

-

27140

... More
2" (Material : ASTM A 105 (CHARPY))

14

-

18172

... More
1" (Material : ASTM A 105 (CHARPY))

10

-

5074

... More
3/4" (Material : ASTM A 105 (CHARPY))

10

-

5074

... More
Insulating Joints as per specs, Rating 300#/Sch. Std.

-

-

-

... More
8",300#

1

-

97940

... More
6", 300#

1

-

77526

... More
4", 300#

4

-

285560

... More
Weldolet and Sockolet

-

-

-

... More
Weldolet (A 234 Gr. WPB, BW)

-

-

-

... More
Size Rating/ Schedule

-

-

-

... More
8" NB x 2" NB Sch. Std.

6

-

16992

... More
6" NB x 2" NB Sch. Std.

10

-

28320

... More
4" NB x 2" NB Sch. Std.

3

-

8496

... More
Sockolet

-

-

-

... More
4" NB x 1" NB Sch. Std. 6000#

3

-

7080

... More
4" NB x 3/4" NB Sch. Std. 6000#

3

-

5310

... More
8" NB x 3/4" NB Sch. Std. 6000#

3

-

5310

... More
6" NB x 3/4" NB Sch. Std. 6000#

3

-

5310

... More
2" NB x 3/4" NB Sch. Std. 6000#

3

-

5310

... More
Butt Weld Disc End Cap (A234 Gr. WPB, B16.9)

-

-

-

... More
Size Rating/ Schedule

-

-

-

... More
8" 300#

1

-

6136

... More
6" 300#

2

-

9676

... More
4" 300#

4

-

11800

... More
INSTALLATION OF VALVES

-

-

-

... More
Receiving and taking over of all Owner supplied materials, equipment's from Owner's designated place(s) of issue, loading , unloading, handling from Owner's designated place(s) of issue to Contractor's own stock yard(s)/ work site(s)/ work shop(s) including arranging all necessary intermediate storage area(s) thereof, as required; supply of all materials, equipment, consumables as defined in Contractor's scope of supply and its transportation to the work site(s);installation of valves, flow meters, strainers, equipment's including fixing of gaskets, bolts, studs, nuts wherever required, levelling, aligning, installation and assembly of accessories including accessories for actuators including making electrical connections for such actuators, if any, by bolting/ threading or welding of pipes at all elevations, testing, completing all works in all respects as per drawings, specification, other provisions of Contract and directions of the Engineer-in-Charge. Note: a.) All items fittings, flanges, valves, pipes below 2" shall be supplied & installed by the contractor under this item, Contractor to quote accordingly. b.) All bolts, nuts, gaskets of all size shall be supplied & installed by the contractor under this item, Contractor to quote accordingly. c.) Contractor works includes all work including tie in with exisitng terminal inside Station and with pipeline

-

-

-

... More
Installation of above ground Flanged Valves (Ball / Plug / Check / Gate / Globe) as per details given below:

-

-

-

... More
Size-8 Inch, Rating-300#

2

-

29736

... More
Size-6 Inch, Rating-300#

2

-

22420

... More
Size-4 Inch, Rating-300#

2

-

14868

... More
Size-2 Inch, Rating-300#

2

-

7552

... More
Installation of above ground Butt Welded Valves (Ball / Plug / Check / Gate / Globe) as per details given below:

-

-

-

... More
Size-8 Inch, Rating-300#

2

-

33748

... More
Size-6 Inch, Rating-300#

6

-

75756

... More
Size-4 Inch, Rating-300#

8

-

67024

... More
Size-2 Inch, Rating-300#

16

-

67968

... More
PE Pipeline Laying and associated Works

-

-

-

... More
PE pipeline laying by open cut method of dia as mentioned below in same trench along with the Steel Pipeline laid as per Item No. 1. This rate is over & Above the rates of SOR item No. 1. Width of Trench shall be as per the Drawing issued by EIC.

-

-

-

... More
63 mm dia MDPE

1000

-

389400

... More
90 mm dia MDPE

1000

-

448400

... More
125 mm dia MDPE

1500

-

778800

... More
Notes: - 1. Supply of MDPE Fittings, Valves Shall be in the contractor scope. No extra charges shall be paid for any other supply item, if not specified elsewhere. 2. The above specified rates are for laying of MDPE pipe only, Over and above the carbon steel pipeline laying rates of SOR item specified as INSTALLATION OF CARRIER PIPE BY OPEN TRENCH METHOD (ALL KINDS OF SOIL). 3. Construction of Valve chamber at every 1 km is inclusive in SOR rate.

-

-

-

... More
PE Pipeline Laying using Horizontal Directional Drilling Technique (without casing)for PE pipe size of :

-

-

-

... More
(a) Laying of all PE pipe (PE 100 SDR11), Including supply of Couplers, End caps as required to complete the job. (b) Survey of U/G utilities, submission of profile for approval, execution of the work as per standard procedure attached, including excavation of pits and subsequent backfilling, compaction, jointing and insertion of PE pipe, testing & commissioning, restoration of the pits to to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge.

-

-

-

... More
125 mm PE 100 SDR11 pipe

300

-

247800

... More
90 mm PE 100 SDR11 pipe

300

-

226560

... More
63 mm PE 100 SDR11 pipe

300

-

198240

... More
1. Supply of MDPE Fittings, Valves Shall be in the contractor scope. No extra charges shall be paid for any other supply item, if not specified elsewhere. 2. Construction of Valve chamber at every 1 km is inclusive in SOR rate.

-

-

-

... More
Supply and Installation of Non Sparking type Rain Cap (material - brass) including all necessary fabrication works, including providing all necessary equipment's, labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings, data sheet, specifications enclosed with the Contract and directions of Engineer-in-Charge.

-

-

-

... More
2" Rain Cap for Vent.

2

-

25016

... More
Construction of RCC Valve Chamber

-

-

-

... More
Trenching, construction with pit cover of Valve chamber including supply of all material , consumables, manpower and equipments of RCC valve pit of different sizes (internal dimention) as per techanical specification & direction of Owner / Owner's Representative complete in all respect. Scope of work shall be as per apporoved drawing inline with typical drawing refered in tender document. Drawing of valve chamber is attached. Size(s) of valve chamber & its cover may change as per site condition. The job is to be carried out as per the modified drawing with no extra cost All civil works including supply of all material, excavation of pit,sand filling , piping & valve supports including all PCC and RCC works for valves pit, pedestals with insert plates as required sealing of pipe at valve pits, providing cover etc and finishing, clean up and restoration of site, filling and grading of area around the valve station to avoid any local flooding of area, as per specification enclosed and instruction of Owner / Owner's Representative. Installation of Crash Guard for protection of valve chamber situated adjacent to road from any incident/accident. Preparation of as-built drawings, documents and project records and performing all works as per drawings, specifications, other provisions of Contract document and instructions of Owner / Owner's Representative.

-

-

-

... More
RCC Valve Chamber - as per attached drawing (Size upto 1.6 m x 2.0 m)

3

-

327450

... More
RCC Valve Chamber - as per attached drawing (Size upto 2.4 m x 2.0 m)

2

-

289100

... More
RCC Valve Chamber - as per attached drawing (Size upto 2.6 m x 2.0 m)

1

-

165200

... More
Restoration of Asphalt Road & Concrete Road/ Pavement (Pipeline Trenching Length ) to the satisfaction of Concerned Authorities having Jurisdiction over the same including obtaining NOC.

-

-

-

... More
Restoration of Asphalt Road Restoration of Bitumin road as per existing profile by using MORTH guidelines to the satisfaction of concerned PWD/NH & Local authority and or Owner / Owner's Representative. Note : 1. This item covers only the Asphalt Road Coming in the Pipeline Trench length. Any other area damaged outside the trench by Laying contractor due to movement of Machinery or any other reason will be done by Contractor at their own cost. 2.All other restoration is included in SOR Item No. 1

100

-

236000

... More
Restoration of Concrete Road Providing and laying PCC of 1:2:4 ,crushed stone aggregates in, pavements etc. including leaving pockets, if necessary, making recess/drains, laying in alternate panels, etc. for all depths including shuttering, tamping, curing, etc. as specified in any shape, thickness, position and finishing the top surface smooth etc. all complete as per drawings, specifications and directions of Owner / Owner's Representative, including cost of supply of all materials including Cement,aggregate ,sand water etc. Note: 1.These rates shall be applied only when explicitly permitted by Company. 2.This item covers only the Concrete Pavement coming in the the Pipeline Trench length. Any other area damaged other than pipeline trench by Laying contractor due to movement of Machinery or any other reason will be done by Contractor at their own cost. Depth of the concrete road may be considered as 6" . However this may change as per the site condition.

166.67

-

295005.9

... More
Providing and laying REINFORCED CEMENT CONCRETE OF M-25 Grade(1:1:2) (Concrete shall be nominal mix at Site as per volumatric Mix) with 20mm & down size graded aggregates in foundations, pavement including pedestals, ramps etc. filling pockets with grouting, laying in alternate panels to required slopes, all necessary form work and finishing the top surface rough or smooth as required and directed, providing pockets/openings, recesses, chamfering etc. wherever required, vibrating, tamping, curing, and rendering smooth if required in any position, shape, level and thickness etc. all complete as specified, shown and directed. Rates to include all materials , labour, shuttering and necessary works required to make work complete. The payments of reinforcement shall be paid separately as per SOR item in tender.

26.66

-

267399.8

... More
Supply and placing in position high strength deformed steel bars reinforcement (conforming to IS: 1786, Grade Fe 500) for RCC work including transporting, straightening, cleaning, de-coiling, cutting & binding to required shapes and length as per details, binding with contractor's own 16 SWG black soft annealed binding wire at every intersection, supplying and placing with proper cover blocks, supports, chairs, overlaps, welding, spacers, fan hooks etc. for all heights and depths etc. complete the work as directed. Note: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as steel Reinforcement, binding wire and other minor construction materials, testing etc. all bye works and sundry works.

500

-

53100

... More
Pipe Supports & Structures

-

-

-

... More
Supply, fabrication and erection of all types of pipe supports of MS material like clamps, saddle, guide stops, cradles, turn buckles, anchors, T-posts; stockade / trestle and pipe bridge for overhead piping; frames for canopy, approach ladders and platforms, crossover, cable tray supports etc. including painting suitable for highly corrosive area as per specification labor and supervision & complete work as per specifications and instruction of Owner / Owner's Representative (Bolts, nuts, washers, U - clamps etc. for supporting shall be supplied by the contractor within the rates quoted. These items will not be measured and paid separately) this work is to be complete in all respect as per scope of work.

2

-

240720

... More
TRANSPORTATION OF COATED LINEPIPES, VALVES, MDPE PIPE, MDPE VALVES, FITTINGS etc. FROM NEGDCL STORAGE YARD TO CONTRACTOR STORAGE YARD:

-

-

-

... More
"Receiving and taking over" of "free issue" Line pipes, Valves, MDPE Pipe, MDPE Valves, Fittings etc. from NEGDCL Store Yard location to Contractor Store yard/working site/material required location; Carrying out inspection of Line pipes at the time of receiving and taking-over, recording of pipe & coating defects at the time of taking over in the presence of Company's representative, carrying out repair of coating defects & pipe defects attributable to Company; including supply of materials, consumables & equipments; handling, hauling and transportation from designated place of issue to Contractor Storage Yard; unloading and stacking of the line pipes at Contractor Storage Yard; including arranging all equipments, trailers, trucks & manpower; all works as per Scope of Work, drawings, PTS, GTS and other provisions of the Contract and instructions of Owner/ Owner's Representative; all associated works not indicated herein but required to complete the work as per Scope of Work, Provision of Contract & instructions of NEGDCL/VCS.

5000

-

354000

... More
Note: 1. This line item will be applicable only for transporation of free issue Line pipes, valves, mdpe pipe, mdpe valves, fittings etc. outside GA boundary (as per PNGRB) as per the direction of Owner/ Owner's Representative. Transporation within GA bounary (as per PNGRB) is under Contarctor scope as mentioned in above line item. 2. Rate for repairing of coating defects in line pipes identified and recorded at the time of receiving & taking over i.e. coating-defects attributable to Company shall be included in this item.

-

-

-

... More
TEMPORARY CATHODIC PROTECTION

-

-

-

... More
Design, Detailed Engineering, Survey, Supply, Installation, Testing and commissioning & Monitoring of the temporary cathodic protection [TCP] system using galvanic anodes to protect the external surface of the entire steel pipeline network approximately 20kM in length, from, against soil- side corrosion for minimum 2 years or till commissioning of permanent CP system whichever is later. All work shall be carried out conforming to the Scope of work, Design Basis, Data Sheets, specification, standard and vendor list attached and provisions of GCC, SCC including Technical specifications, OWNER/CONSULTANT approved survey report/design package, including all materials, equipment's, consumables, start up/commissioning spares etc. including transportation, storage of materials at site, manpower, in line with direction of Engineeer in-charge.

-

-

-

... More
Conducting soil resistivity survey at 1000M intervals, corrosion survey at 10kM intervals(for Soil Ionic & Microbial Loading) along pipeline ROW, collection of all relevant data like foreign pipeline, details of existing CP systems and anode beds, DC/AC power sources and systems using earth return path such as HVDC substations/ earthing stations, Crossing and parallel running of electrified railways, underground power cables and other elements that may interfere with the CP system as per standard specifications and scope of work.

16

-

77408

... More
Design and detail engineering of TCP system based on the field data collected in item 1 above. The design must include selection of of the types and number of different TLP types, inclusion of preliminary design measures for HT power line/cable crossings, cased crossings, foreign pipeline crossings etc., inclusion of other items like corrosion of probes, sacrificial anodes, polarization cell etc. as per pipeline route conditions. Submission of complete design document including results of all resistivity & corrosion survey, calculations, bill of material, QAP, vendor datasheets, drawings is also in the scope of the contractor.

1

-

66316

... More
Supply and installation of Test lead Points (TLP/Test stations) Big Size (475mm X 420mm X 350mm), with lockable door in weather proof IP-55 construction as per specifications and standard drawings complete with backlite connection plate, connection studs terminals, 4” dia heavy duty pipe, base plate welded at the bottom including MS bend for concrete base, M-20 grade concrete foundation as per standard drawings & miscellaneous works such as excavation and backfilling for foundation/trenches for cable laying. The work shall include PCC over foundation after installation of TLP, supply & fixing of a name plate containing the details like KM location, identification, TLP No., Marking of connection scheme, type etc., on the inside of the cover including the cost of all labour, materials, tools & tackles etc.

4

-

104784

... More
Supply and installation of Test lead Points (TLP/Test stations) Small Size (300mm X 275mm X 230mm), with lockable door in weather proof IP-55 construction as per specifications and standard drawings complete with backlite connection plate, connection studs terminals, 4” dia heavy duty pipe, base plate welded at the bottom including MS bend for concrete base, M-20 grade concrete foundation as per standard drawings & miscellaneous works such as excavation and backfilling for foundation/trenches for cable laying. The work shall include PCC over foundation after installation of TLP, supply & fixing of a name plate containing the details like KM location, identification, TLP No., Marking of connection scheme, type etc., on the inside of the cover including the cost of all labour, materials, tools & tackles etc.

16

-

334176

... More
Supply & Installation of pre-packed Mg Anode (7.5 Kg) with one tail cable 1Cx10 Sq.mm Unarmoured cable (with sufficient length) & encapsulation kit for cable connection termination of Anode tail cable in the TLP etc. Howevever min one anode is to be installed at every one kM with test staion.

16

-

251104

... More
Supply & Installation of pre-packed Zinc Anode (40 years design life / Min. 22 Kg) for HT Line crossing with one cable including 1Cx25 Sq.mm armoured cable (with sufficient length), encapsulation kit termination of Anode tail cable in the TLP etc.

5

-

93220

... More
Supply & Installation of 3.7 kA @30 cycles solid state Polarization cell, to be installed in the vicinity of AC transmission lines.

4

-

460200

... More
Supply & Installation of Surge Diverter for Insulating Joint (10/350 µS = 100kA)

3

-

67968

... More
Supply and installation of Zn Ribbon anode (Dia min. 12x14 mm with back fill in trench) can also be used for the grounding purpose to get lower grounding resistance.

40

-

94400

... More
Supply and installation of pre-packed Cu-wire AC mitigator wire of MATCOR make or equivalent can also be used for the grounding purpose to get lower grounding resistance.

20

-

25960

... More
Supply and installation of GI Pipe earth electrode of 65 mm dia, 4.5 mm thickness & 3000mm long and earth pit back fill as per standard drawing Earthing of above ground cathodically unprotected pipeline at IJ Locations. Maximum allowed earth resistance shall be 2 ohms.

4

-

62776

... More
Supply, installation, testing & commissioning of external electrical resistance Probe utilizing the electrical resistance technique to monitor corrosion at marshy / vulnerable locations on the pipeline. (01 no. ER Probe Reader to be supplied with every 5 no ER Probes. Minimum 1 no ER Probe Reader to be supplied in case the no of ER Probed is less than 5). The location of external ER probe shall be decided during detail engineering.

4

-

1210208

... More
Supply, installation, testing & commissioning of Polarisation coupons each of total area of 100mm x 100mm having one side exposed area of 10 mm x 10 mm shall be provided along the pipeline at marshy areas and at vulnerable locations to monitor the external corrosion activity on the pipeline as per enclosed standard specification. Location of external Polarisation coupons & Number of magnetic devices for operation of magnetic switch shall be decided during detail engineering. The works related to collection of approximately 2-5 m of pipeline material (In pieces of 300 to 1000mm length) for fabrication of Polarisation coupons is in the scope of the Contractor.

4

-

24544

... More
Bonding in between pipelines running parallel or crossing as required including taking of permission from the owner of the foreign pipeline (Permission shall taken by the Pipeline Owner and any fee required for the same shall be paid by the Owner, however contractor shall assist in all respect to get such permissions from foreign pipeline owner). i) Bonding of pipelines shall be carried out through bonding stations (variable resistance of suitable value + shunt + diode, if required). Polarization coupons shall be installed at every test station in the parallel section and at crossings. ii) The Contractor shall supply and install bonding stations as provision to bond the pipelines. For the new pipeline as a provision for interference mitigation Bonding Junction box (BJB) shall be installed as a minimum at the following locationsiii) Where the new pipeline runs parallel to the existing pipelines, at start and end of parallelism and at every five (5) km intervals. As a minimum, all existing parallel pipelines laid with a separation distance of 10 m shall be provided with bonding provision. iv) Where the pipeline crosses or intersects the existing buried pipelines or buried section of pipelines / Piping. v) BJB shall have provision to terminate 25/35 mm2 bonding cables and a 6 mm2 potential monitoring cables connected to each foreign pipelines as well as new pipelines. BJB shall be provided with appropriately rated shunts and resistors for each circuit. Rating of the resistors shall be calculated based on the mitigation requirement.

1

-

66316

... More
Supplying, laying, termination, ferruling & testing of all the cables of TCP system, Cu-Conductor, XLPE insulated, PVC sheathed, Armoured/Unarmoured as required.

-

-

-

... More
1Cx6 mm2 Armoured

1000

-

236000

... More
1Cx10 mm2 Armoured

600

-

155760

... More
1Cx25 mm2

150

-

58410

... More
Cable to pipe connection by thermit welding for 35, 25,10 ,6 sq.mm copper cable including excavation and exposing piping , recoating with epoxy, testing etc.

200

-

495600

... More
Cable to pipe connection by Pin brazing (for charged pipeline) for 35, 25,10 ,6 sq.mm copper cable including excavation and exposing piping , recoating with epoxy, testing etc.

16

-

56640

... More
Ground Penetration Radar (GPR) Survey.

-

-

-

... More
Carrying out subsurface utility survey along the proposed pipeline route and/or as specified by Eingineer -In-Charge for 5 m corridor using Ground Penetrating Radar (GPR) for depth upto 5 m below the existing ground level to locate and identify all existing underground utilities /buried objects including but not limited to pipelines , sewers, conduits, cables, drain, manholes ,appurtenances etc in the proposed corridor along with location ,DGPS coordinates,depth,shape and dimensional detals of utilities . Four (4) copies of report and drawing incorporating all collected datas shall be submitted as per scope of work and direction of Engineer-in-charge .Scale of drawing shall be Planimetry (X axis 1:1000,Y axis 1:100),Longitudnal Section (Z axis 1:100) and Transverse section at critical location.

15

-

483210

... More
NOTE: 1) Survey Agency for execution of GPR survey work to be engaged by the contractor shall be submitted for approval of NEGDCL/VCS prior to start of work. 2) GPR work shall carried in presence of Contractor's Representative

-

-

-

... More
SUPPLY & INSTALLATIONS OF ASSORTED PIPE

-

-

-

... More
Supply including procurement and transportation to worksite(s)/workshop(s) including loading, unloading and handling to be supplied by Contractor as per the requirement of PMS, specifications, data-sheets, standards, instructions of Owner/ Engineer-in-Charge and other provisions of Contract. Note: 1. Before procurement NEGDCL/VCS approval shall be obtained.

-

-

-

... More
Carbon Steel Pipe (A 106, Gr. B, Seamless, B-36.10)

-

-

-

... More
3/4" Sch/Thk - S160 Material ASTM A 106 GR.B (CHARPY), BE, SMLS

50

-

23600

... More
1" Sch/Thk - XS Material ASTM A 106 GR.B (CHARPY), BE, SMLS

40

-

23600

... More
2" Sch/Thk - XS Material ASTM A 106 GR.B (CHARPY), BE, SMLS

50

-

59000

... More
3" Sch/Thk - STD Material ASTM A 106 GR.B (CHARPY), BE, SMLS

50

-

94400

... More
4" Sch/Thk - STD Material ASTM A 106 GR.B (CHARPY), BE, SMLS

4

-

10384

... More
6" Sch/Thk - STD Material ASTM A 106 GR.B (CHARPY), BE, SMLS

40

-

184080

... More
8" Sch/Thk - STD Material ASTM A 106 GR.B (CHARPY), BE, SMLS

40

-

278480

... More
Notes: 1) The SOR items would be operable as per job requirement, and quantities may vary on +/- sides. 2) The general activities related to laying of Coated CS Pipelines Laying shall be as defined in tender document. 3) The scope as mentioned in the above SOR is of indicative nature only and shall include all activities as detailed in the relevant clauses of the specifications. 4) Any other material & activities not mentioned / covered above but otherwise required for satisfactory completion / safety of work as defined in tender has to be supplied / done by contractor within specified schedule at no extra cost to Owner. 5) Prices quoted in column shall be all inclusive of all taxes / duties (excluding GST) and nothing extra shall be payable by the Owner except for statutory variation in GST. 6) The above quantities are tentative and may vary considerably depending upon site condition, methodology adopted as per site requirement with due approval of Owner / Consultant. 7) The SOR shall be read along with the relevant clauses of Laying of CS Pipelines provided in the tender document.

-

-

-

... More
EARTH WORK IN EXCAVATION AND BACKFILLING                                      

-

-

-

... More
Earthwork in excavation for foundations in ordinary soils including soft rock / disintegrated rock in both dry and  wet conditions including pumping and bailing out surface and subsoil water, shoring, strutting,  slush removal including backfilling in all positions in layers of 300mm at all heights and depths as per drawings and specifications wherever required, in Foundation pits and other places with excavated suitable surplus earth including reclaiming from spoil heaps kept within the plot including dressing and levelling, watering and mechanical compaction etc.,transporting surplus unserviceable  soil  upto a lead of 1 km and spreading in layers and as per specifications and direction of Engineer in charge.  The Measurement  for payment shall be for the theoretical volume only and it shall be  the volume of the block of  the excavation having maximum bottom dimension of the  levelling course/PCC as  per drawing and to actual depth.

-

-

-

... More
For depth upto 1.5 m.

5000

-

2655000

... More
For depth beyond 1.5 m

150

-

97350

... More
NOTE: 1. The Contractor shall take into account in his rate, the provision for excess excavation required for necessary working space, cutting in  slopes etc., which may be required for excavation and other allied works and refilling the side slopes and working space in layers as per requirement.

-

-

-

... More
PLAIN CEMENT CONCRETE

-

-

-

... More
Supplying and laying plain cement concrete of grade 1:3:6 (M 10) with stone aggregate 40mm down grade (including shuttering if required) in all levelling courses under foundations, mass concrete works, chambers, trenches,floors and any other locations at all depths complete in all respects as per drawings, specifications and directions of the NEGDCL/VCS. 

50

-

389400

... More
NOTE: Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.

-

-

-

... More
REINFORCED CEMENT CONCRETE

-

-

-

... More
Providing and Laying in position Machine batched and machine mixed Design mix/ Ready mixed for Reinforced Cement Concrete work  of grade M-25 using 20mm down size graded aggregate at all depths and heights using cement content as per approved design mix manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work including pumping of RMC as applicable, including cost of centering, shuttering and admixtures in recommended proportions as per IS: 9103 to accelerate/retard setting of concrete  (improve workability without impairing strength and durability) but excluding cost of reinforcement as per direction of NEGDCL/VCS. Mechanical mixers with Hopper along with Weigh Batcher shall also be permitted for use at site with the approval of NEGDCL/VCS to produce Design Mix Concrete of specified grade.

200

-

2029600

... More
NOTE: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as,  minimum 43 grade OPC/PPC cement including sulphate resistant cement if required, coarse and fine aggregates, admixtures, other minor construction materials, testing of concrete, curing etc. with all bye works  complete. 2. The reinforcement shall be paid separately vide respective item.

-

-

-

... More
REINFORCEMENT STEEL

-

-

-

... More
Supplying, Fabricating and Fixing in position TMT Grade Fe 500D reinforcement conforming to  IS1786 at all levels and positions including the cost of transport, straightening, cutting, bending, cranking, welding, provision of necessary chairs and spacers, preparation of bar bending schedule and getting the same approved by NEGDCL/VCS etc., complete as per drawings and specifications and including cost of binding wire, labour, testing etc., all complete  in all respects as per detailed construction drawings, technical specifications and direction of NEGDCL/VCS. The chairs and spacer bars provided will not be measured for payment.

16

-

1763392

... More
NOTE: 1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as reinforcement steel, binding wire etc. with all bye works and sundry works complete. 2. Chairs, Unauthorised Laps, Spacers, Binding wire, Wastage etc. shall be to contractor's account.

-

-

-

... More
BRICK WORK

-

-

-

... More
Providing and laying BRICK WORK straight or curved on plan to any radius using best quality bricks with frog/indent, conforming to sub-class A as per IS:1077 having crushing strength of not less than 50 kg/cm2 in cement mortar 1 :6 (1 Cement : 6 Coarse Sand)  in all types of foundation and superstructure at all depths/heights including projections, pillars, parapets, ornamentals of any shape, cornices, all complete including cut work, curing, scaffolding,including filling of joints with Cement Mortar 1:6 and racking of joints, etc. as per specifications, drawings and directions of the Engineer.

100

-

932200

... More
NOTE: Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC/PPC), bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work,  etc. as per requirement  with all bye-works and sundry works complete as per drawings.

-

-

-

... More
Instrumentation

-

-

-

... More
Supply of SS pressure gauges as per data sheet and enclosed drawing and installation of pressure guages and their accessories inclusive of supply of necessary piping materials and tubings alongwith all necessary valves and fittings, fabrication and installation of impulse lines / mainfolds and hydrulic testing and calibration as per installation standard attached in the tender

-

-

-

... More
Pressure Gauge With all accessories etc.

7

-

68558



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.