Industries And Commerce Department Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Industries And Commerce Department Tender

Works
Civil And Construction
Pipe Line Project
Eprocure
Opening Date14 Sep 2024
Closing Date5 Oct 2024
Tender Amount₹ 54,53,63,410 
This is an estimated amount, exact amount may vary.
Notes
Download

Costs

Summary

Pipeline Laying

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
ANTI-BUOYANCY

-

-

-

... More
CONTINUOUS CONCRETE COATING FOR ANTI-BUOYANCY: Unit rate for additional work over and above item no. 1 for supply of all consumables & materials and application of continuous concrete weight coating on pipes of all wall thicknesses and concrete coating of the field joints thereof, in all areas of work except major river crossings covered separately, and performing all works as per specifications and instructions of Engineer-in-Charge and other provisions of Contract document.

-

-

-

... More
Pipe as per following details: ( Pipe OD - 406.4 mm (16"), Wall Thickness - 11.13 mm, Minimum Conc.Coating Thickness - 50 mm)

400

-

-

... More
GEO TEXTILE BAGS FOR ANTI-BUOYANCY: Unit rate for additional works over and above item no. 1 for design, manufacture and supply of Non - biodegradable geo-textile bags (made of polypropylene fabric) materials and installation of geo-textile bags duly filled with gravel/ stone ballast on pipelines of all wall thicknesses for anti buoyancy as per specification /Report /drawings, and instructions of Engineer-in-Charge and other provisions of the Contract document. Note: 1. This item shall be applicable for small crossings, i.e. drains, nalla etc and as per instructions of Engineer In-Charge. 2. Bags shall be procured from approved vendor only. 3. Spacing of bags shall be decided by the Contractor & approval of the same shall be taken by the Contractor from the Client/ Client's representative for 16"pipeline, and density of ballast gravel (2402 Kg/cubic meter) & weight (400 Kg). For one location total Nos of bags installed shall be considered as 1 Nos.

-

-

-

... More
Pipe as per following details: ( Pipe OD - 406.4 mm (16"), Wall Thickness - 11.13mm)

20

-

-

... More
SADDLE WEIGHT: Unit rate for additional work over and above BOQ item no. 1 for supply of all consumables & materials and application of saddle weight on pipes of all wall thicknesses thereof, in all areas of work and performing all works as per standard Drawings and instructions of Engineer-in-Charge and other provisions of Contract document. Note: 1. This item shall be applicable for small crossings, i.e. drains, nalla etc and as per instructions of Engineer In-Charge. 2. Bag shall be procured from approved vendor only. 3. Spacing of saddle weight shall be decided by the Contractor & approval of the same shall be taken by the Contractor from the Client/ Client's representative for 16", and weight (282 Kg) as defined in Scope of work.

-

-

-

... More
Pipe as per following details: ( Pipe OD - 406.4 mm (16"), Wall Thickness - 11.13mm)

10

-

-

... More
REPAIR OF DEFECTS (ATTRIBUTABLE TO OWNER): Repair of defects in pipes/ line pipes of all thicknesses and external coating noted at the time of taking delivery by Contractor, including performing all works as per specifications and directions of Engineer-In-Charge, supply of all repair material and inspection. REPAIR OF DEFECT IN PIPE: Repair of Defects in Pipe by Cutting and re-beveling including NDT of re-bevelled area & by Jack out (dents in bevels exceeding 3 mm in depth)

-

-

-

... More
Cutting and rebevelling (dents / damage in bevels exceeding 3mm in depth). Pipes as per following details : ( Pipe size - 406.4 mm (16"), Thickness - 11.13mm )

4

-

-

... More
Jack out (dents in bevels ranging between 1 mm and 3mm in depth) Pipes as per following details : ( Pipe size - 406.4 mm (16"), Thickness - 11.13mm )

2

-

-

... More
REPAIR OF HOLIDAY IN COATING: Supply of all coating repair materials as per the requirements of the relevant specifications, supply of all consumables, utilities, equipment, and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday in coating) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works strictly in accordance with the relevant specifications and instructions of Engineer-in-Charge. Note: This rate shall be applicable per sq. cm of the exposed steel.

-

-

-

... More
Repair of Holiday in Coating (Type of Coating - 3 Layer Polyetlene)

10

-

-

... More
REPAIR OF COSMETIC DEFECTS IN COATING: Supply of all coating repair materials as per the requirements of the relevant specifications, supply of all consumables, utilities, equipment, and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday in coating) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works strictly in accordance with the relevant specifications and instructions of Engineer-in-Charge. This rate shall be applicable per sq. cm of repair patch.

-

-

-

... More
Repair of Cosmetic defect in Coating (Type of coating: - 3 Layer Polyethylene )

20

-

-

... More
LEAKS/ BURSTS-PIPELINE (ATTRIBUTABLE TO OWNER)

-

-

-

... More
MAJOR LEAK (DETECTED BY VISUAL METHOD): All works for locating major leak/ burst (occurred during hydrostatic testing) including necessary repairing/ replacing defective pipe length, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of welds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline including providing all necessary equipments, labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in-Charge. Note : This rate is applicable for manufacturing defects in Company supplied material only.

-

-

-

... More
Major Leak (detected by visual method) (Pipeline size - 16 inch)

1

-

-

... More
MINOR LEAK (DETECTED BY SECTIONALISING): All works for locating leak by sectionalising or any other methods which cannot be located by visual means, including necessary repairing/ replacing defective pipe length, including cutting and removing out defective pipes, pretesting of replacement pipe and welding into mainline, NDT of welds and re-bevelled area, repair and re-testing of defective welds, coating of welded joints, clean-up, retesting the pipeline including providing all necessary equipments, labour, materials, consumables and inputs other than Owner supplied materials and performing all works as per drawings, specifications enclosed with the Contract and directions of Engineer-in- Charge. Note: This rate is applicable for manufacturing defects in Company supplied material only.

-

-

-

... More
Minor Leak (detected by visual method) (Pipeline size - 16 inch)

1

-

-

... More
BARRICADING (FOR USE IN HIGH MOVEMENT AREA)

-

-

-

... More
Providing & erecting in position a barricading Structure of 1.5 M height & temporary foundation. Using 0.8mm thick corrugated galvanized steel sheets supported on frame of Structural Steel conforming to IS:2062, coated with Red oxide zinc chromate shop primer, including submission of design & drawing to be reviewed by owner, before execution of work at Pipeline route, particularly in residential area and high movement area and as advised by Enginner inchagre, removal of barricading structure after completion of work, including demolition & dismantling its foundation, dressing & trimming of the area. All complete as per Specification & direction of Engineer in charge (All materials to be in contractors scope) Note: 1.These rates shall be applied only when explicitly permitted by Company. 2. Rates includes moving and reinstallation of the baricades from one work site to another, multiple times.

50

-

-

... More
PIPELINE INSTALLATION AT MAJOR CANALS/ RIVER/ SH/ NH/ RLY'S BY HDD TECHNIQUE Receiving, taking over & Installing of owner supplied free issue 3 layer Externally PE coated & internally expoxy coated line pipes of size 16", W.T. 11.13 mm, API 5L Gr. X-65, PSL-2 grade from owner's designated point of issue. For complete works of the major canal/ SH/ NH/ RLY by horizontal drilling method (HDD) including all additional drilled lengths necessitated by Contractor's design of water crossings, carrying out all topographical, hydrological and geo-technical surveys required for design and construction of crossing, preparation of all necessary design & construction drawings and procedures for Owner's approval, mobilisation and de-mobilisation at site(s), supply & Installation of all materials as per "Contractor's scope of supply" including supply & installation of 6" size, 6.4mm API 5L Gr. B/IS:1239 CS conduit pipe for OFC in required lengths, all consumables, equipment, manpower and other resources and acquiring the required land for site preparations, and execution of, but not limited to, the following works in accordance with specifications, drawings, and as per provisions of the Contract document and instructions of the Owner/ Engineer-in-Charge. Strings preparation including welding, NDT of welds and re-bevelled areas, radiography, pre-testing of completed string, corrosion coating of field joints, inspection of corrosion coating and repair of defects, Pre-construction surveys, Installation of pipeline and CS conduit/ optical fibre cable conduit by horizontal directional drilling to the correct profile as per approved drawings and specification, Strapping of CS conduit with main pipeline, Pulling of optical fibre cable in inter-duct of flexible HDPE tubing in the conduit mentioned above, Post-installation hydrotest including leaks and repair of defects and retesting, etc. for defects attributed to Contractor's faulty work, Supply, fabrication and construction of protective fencing as required, Supply, fabrication and erection of pipeline markers, Restoration and clean-up etc., Preparation of as-built drawings and other records etc., All other works not specifically listed herein, but required as per specifications, drawings, provision of contract document, calculations, and construction method statements, leading to successful completion of works. Note : 1. Rates quoted shall be applicable for multiple crossings at different locations. 2. Contractor shall be paid based on distance between tie-in points at two ends of crossing and not between points of entry & exit. 3. The work involved Supply and Installation of 1 nos of 6" CS pipe for OFC (IS 1239/ API 5L GR. B) along with carrier pipe in each HDD crossing. 4. If required, contractor shall arrange additional land for machine & String preparation.Cost is deemed to include in this item only. 5. Pipe used for the HDD shall be externally coated with Abrasion Resistant Overlay (ARO) Sacrificial Coating (before installation) for protecting 3LPE Coating during HDD Pull Through. 6. Minimum depth shall be 2.5 M below Scour levelor or minimum 15M below bed level for all River Crossings & Minimum depth shall be 4 M below bed level for Nala & other micro water body crossings.

-

-

-

... More
Tipling River Crossing at chainage (04+231.15KM) by HDD Techniques as per the drawing.

100

-

-

... More
Burhi Dihang River Crossing at chainage (08+343.58KM) by HDD Techniques as per the drawing.

1500

-

-

... More
Other Minor Crossings by HDD Techniques (length less than 800m)

700

-

-

... More
CASED CROSSING (BY JACKING/ BORING/ OPEN CUT): Cased Crossing including installaiton of cased pipe and including Supply , installation & transportation of casing pipe for mainline and CS conduit for OFC from Contractor's storage point to worksite. Installation of casing pipe by jacking/ boring or open cut for road or canal crossings wherever required in all types of soils and terrain and all other materials viz. casing insulators and casing end seals as per enclosed drawing, materials for casing vents and drains, etc. including supply of all other materials, equipments, consumables, manpower, welding including visual inspection of all weld joints, installation of casing insulators, end seals, vents and drain-off pipes, backfilling and restoration as original of the facility crossed and performing all works as per drawings, specifications and instructions of Engineer-in-Charge and provisions of Contract document.

-

-

-

... More
CASED CROSSING - RAILWAYS /HIGHWAY /CANAL/NALA /DRAIN (BY JACKING /BORING)

-

-

-

... More
Cased Crossing by Jacking / boring including supply of casing pipe and its coating ( Size : - 559 mm (22"), Material : - API 5L Gr B/ IS:3589 ,Wall thickness :- 8.74 mm

50

-

-

... More
Installation of 1 no. of 6" CS Conduit by boring & jacking including supply of casing pipe and its coating for HDPE duct OFC 6" API 5LGrB/ IS : 3589 wall thickness 6.4 mm

50

-

-

... More
CASED CROSSING - BY OPEN CUT

-

-

-

... More
Cased Crossing by open cut method including supply of casing pipe and its coating ( Size : - 559 mm (22"), Material : - API 5L Gr B/ IS:3589 ,Wall thickness :- 8.74 mm

30

-

-

... More
Installation of 1 no. of 6" CS Conduit by open cut including supply of casing pipe and its coating for HDPE duct OFC 6" API 5LGrB/ IS : 3589 wall thickness 6.4 mm

30

-

-

... More
Hook Up

-

-

-

... More
Hook Up of the Pipeline at the batterry limit.

1

-

-

... More
SLOPE STABILIZATION Additional works over and above item no. 1 for supply and installation for protection and stablisation of soil in steep slope areas including supply of all materials, equipment, consumables, manpower and performing works as per drawings, specification, instruction of Engineer in Charge and provisions of contract. (1:4 Cement & sand in Gunny bags as per drawing) Note: Contractor shall stablise the slopes location as marked in alignment sheet or as per Instruction of Engineer-in Charge at site

50

-

-

... More
BANK STABILIZATION Unit rate for additional works over and above BOQ item no.1 for supply, fabrication and installation for protection and stabilization of banks of water crossings including supply of all materials, consumables, manpower and performing works as per drawings, specifications, instructions of Engineer-in-Charge and provisions of Contract. Note: Contractor shall stablise the slopes location as marked in alignment sheet or as per Instruction of Engineer-in Charge at site.

80

-

-

... More
BACKFILLING WITH SELECT SOIL (FOR STATION APPROACH)

-

-

-

... More
Unit rate over and above item no. 1 for supply of specified and approved quality of sand atleast of 500 mm over the pipe including supply of sand in place of available excavated material and/ or other suitable soil as per applicable standards/ specifications, including backfilling of excavated trench for specified length after laying of pipeline, including transportation of backfill material over all distances and disposal of surplus excavated soil, complete.

100

-

-

... More
PERMANENT MARKERS: Supply, fabrication and installation of following types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, chainage, etc., restoration of area to original condition and performing all works as per drawings, specifications and instructions of Engineer-in- Charge. Note: The painting of all markers shall conform to coastal and marine environment of spec. P-SPC-410 irrespective of whatever shown on respective standards.

-

-

-

... More
Navigable Water Sign

4

-

-

... More
Kilometer Posts

8

-

-

... More
Pipeline Warning Signs

30

-

-

... More
Right of use Boundary Markers

4

-

-

... More
Aerial Markers

1

-

-

... More
Direction Markers

12

-

-

... More
PRE-COMMISSIONING OF UNDERGROUND PIPELINE: Pre-commissioning activities and pre-commissioning checks to be specified acceptance criteria, making the entire pipeline system ready for commissioning, providing assistance during the complete duration of commissioning operations,supply of all equipment,manpower,consumables (including pigs and required quantity of nitrogen for valve operations) materials for all temporary works and performing all associated works,complete as per relevant specifications,other provisions of contract document and instructions of Engineer-in Charge.

-

-

-

... More
DEWATERING AND SWABBING

-

-

-

... More
Dewatering and swabbing of the pipeline. Note- For Swabbing combination of low density and high density pigs shall be carried out.

9400

-

-

... More
PIPELINE LAYING LIAISONING AND GETTING PERMISSIONS FROM THE STATUTORY AUTHORITIES/ RAILWAY/NH/ LAND OWNERS/ VILLAGERS: Complete Liaisoning works including but not limited to Liaisoning / co-ordination with Local Villagers / Land Owners / Statutory Authorities / CRZ/ Railway / SH/ NH etc / Any other Person/ Institution directly or indirectly linked with the pipeline activities for ensuring timely commencement of works and uninterrupted works without idling any equipment throughout pipeline laying activities during execution. a) Liaisoning and Co-ordinating with all the relevant authorities and land owners falling adjacent to the road side and ensuring hindrance free ROU for all pipeline laying works. b) All expenses related to Liasoning of what so ever nature will have to be borne by the contractor. c) Conctrator shall depute dedicated Experienced Controlling/ Liasoning In charge with dedicated Liasoning team, having thorough knowledge of local language. d) Liaisoning team member should be present at each location of pipeline execution work so that work is not getting hampered due to communication gap with farmers or other involved agencies / persons free ROU and should be able to lay the pipeline, complete the restoration, other testing , pre-commissioning and commissioning activities and arrange subsequent visits and post laying inspection or repairs if any for entire pipeline route till the handing over of the pipeline.

-

-

-

... More
Applying working permission, follow up and liaisoning with the various statutory authorities/landowners/Villagers (except railway SH/ NH ) during execution for sucessful completion.

1

-

-

... More
Railway liaiisoning work during installation of pipeline till completion.

1

-

-

... More
State/ National Highway liaisoning work during installation of pipeline till completion.

1

-

-

... More
SUPPLY AND INSTALLATION OF RCC PROTECTION SLAB IN TRENCH (FOR HIGH VOLTAGE CROSSING & UNDERGROUND UTILITY CROSSING AS PER STD. DRAWINGS)

-

-

-

... More
Manufacturing, transporting, supplying and erecting in position Reinforced Cement Concrete PRECAST ELEMENTS such as columns, beams, cover slabs, lintels, louvers, fins, shelves etc. of M-25 grade with 20mm and down size graded crushed stone aggregates/gravel, for all leads, levels, shapes and thickness including all moulds, shuttering and centering, vibrating, tamping, curing, chamfering wherever required, finishing the top surface with cement mortar 1:3 ( 1 Cement : 3 Sand) to give a smooth and even surface, or non skid finish as specified, providing lifting hooks, metal inserts, making holes pockets, (only M.S. inserts to be measured & paid separately) transporting to site, erecting, levelling, aligning and fixing in position with cement mortar 1:3 (1Cement : 3 Coarse Sand), breaking bricks and/or concrete surfaces and making good the same etc. all complete (excluding the Cost of Reinforcement ) and as directed.

25

-

-

... More
Supplying and placing in position HIGH STRENGTH DEFORMED STEEL BARS REINFORCEMENT (conforming to IS:1786, Grade Fe 500), for R.C.C. work including transporting the Steel, straightening, cleaning, decoiling, cutting, bending to required shapes and lengths as per details, binding with contractor's own 16 SWG black soft annealed binding wire at every intersection, supplying and placing with proper cover blocks, supports, chairs, overlaps, welding, spacers, fanhooks etc. for all heights and depths etc. all complete as directed.

1.32

-

-

... More
RESTORATION OF ASPHALT ROAD (PIPELINE TRENCHING AREA) TO THE SATISFACTION OF CONCERNED AUTHORITIES JURISDICTION OVER THE SAME INCLUDING OBTAINING NOC: Providing all materials and labour for making good roads for all depths & width up to including surface preparation, rectification of damaged portions of 1st layer of WBM, base course, sub-base course, filling in ruts and depressions, etc. breaking adjoining portion of roads, if required, cleaning the surfaces, providing the layers as per the specifications of roads (WBM layers to proper thickness, including compacting, watering, filling voids with screenings and binding material of plasticity index up to 6%, including cost of supply of screening and binding material etc. complete as per specification of road work. Providing and laying 50mm thick bitumen premix carpet including heating bitumen, mixing stone chips, grit, laying to proper grade and camber including preparation of surface, filling pot holes with premix chips, rolling premix carpet with 8 to 10 ton road roller, providing and rolling seal coat to proper grade and camber, spreading sand over finished surfaces including brushing and clearing WBM surfaces, spraying tack coat of bitumen, etc. complete including providing and running road roller etc. all as per drawings, specifications and directions of Engineer- in-Charge. Note : 1. This item covers only the Asphalt Road Coming in the Pipeline Trench area. Any other area damaged by Laying contractor due to movement of Machinery or any other reason will be done by Contractor at their own cost. 2. All other restoration is included in BOQ Item No. 1.

52

-

-

... More
RESTORATION OF CONCRETE ROAD/ PAVEMENT (PIPELINE TRENCHING AREA) TO THE SATISFACTION OF CONCERNED AUTHORITIES JURISDICTION OVER THE SAME INCLUDING OBTAINING NOC: Providing all materials and labour for making good roads for all depths & width up to including surface preparation, rectification of damaged portions of 1st layer of WBM, base course, sub-base course, filling in ruts and depressions, etc. breaking adjoining portion of roads, if required, cleaning the surfaces, providing the layers as per the specifications of roads (WBM layers to proper thickness, including compacting, watering, filling voids with screenings and binding material of plasticity index up to 6%, including cost of supply of all materials including screening and binding material etc. complete as per specification of road work. Providing and laying Reinforced cement concrete of Grade M25, with 20mm and down size graded crushed stone aggregates in, pavements etc. including leaving pockets, if necessary, making recess/drains, laying in alternate panels, etc. for all depths including shuttering, tamping, curing, etc. as specified in any shape, thickness, position and finishing the top surface smooth etc. all complete as per drawings, specifications and directions of Engineer-in-Charge, including cost of supply of all materials including Cement & reinforcement etc. Note: 1.These rates shall be applied only when explicitly permitted by Company. 2.This item covers only the Concrete Pavement coming in the the Pipeline Trench area. Any other area damaged by Laying contractor due to movement of Machinery or any other reason will be done by Contractor at their own cost 3. All other restoration is included in BOQ Item No. 1.

7

-

-

... More
CS STRUCTURAL STEEL

1

-

-

... More
Instrumentation Works

-

-

-

... More
Laying of 40 mm HDPE DUCT & Warning tape

9.4

-

-

... More
Blowing of 48 Core Fiber optical Cable into HDPE DUCT

9.4

-

-

... More
Supply, Installation, testing, of Joint Enclosure for OFC

3

-

-

... More
Splicing & jointing of Fiber optical cable

3

-

-

... More
Construction of Jointing Pit/ chamber as per specification

3

-

-

... More
Installation of Electronic Marker into the jointing pits

3

-

-

... More
Cable termination in all stations

1

-

-

... More
Commssioning of OFC cable

9.4

-

-

... More
OPTIONAL SCOPE (Will be part of the contract and will be evaluated separately)

-

-

-

... More
DRYING AND COMMISSIONING: Complete work of carrying out drying by vacuum drying method or supper air drying & commissioning of pipeline including supply of manpower, equipments & consumables nitrogen required for purging etc,)materials for all temporary works and performing associated works,complete as per the relevant specifictions,other provisions of contract document and instructions of Engineer-in Charge.

-

-

-

... More
Drying by vacuum drying/ super air drying method of pipeline section

53000

-

-

... More
Carrying out commissioning checks and making the pipeline section (ready for commissioning including supply of all adequate nitrogen for pipeline purging equipment, manpower, consumables (including all types of pigs and required materials), materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge. Note- Purging of pipeline with nitrogen shall be considered for atleast 4 km length of pipeline.(despatch terminal to receiving terminal ) Cost is included under this item only.

53000

-

-

... More
ELECTRONIC GEOMETRIC PIGGING (EGP)

-

-

-

... More
Mobilisation/ demobilisation of pigging tools, tackles, consumables, accessories and personnel by CONTRACTOR at work site including but not limited to Magnet pig, electronic geometry pigs and pig tracking device, as per specification and other provision of the bid document including supply of material, equipment, manpower, etc. as required for geometry inspection and magnet cleaning of 16" Pipeline.

53000

-

-

... More
IDLE TIME PRESERVATION OF PIPELINE: Preservation of Section-A Pipeline and associated facilities and its maintenance including supply of all consumables, all equipment, man-power, etc., complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in- Charge.

-

-

-

... More
By filling and pressurising with corrosion inhibited water including supply and maintenance of water with regular dosing of inhibitor to maintain the effectiveness of the inhibitor water for the following details: ( Pipeline size - 406.4 mm (16"), pressure shall be minimum bar(g) 5, Specified period 3 month ) Note : For section A only

9400

-

-

... More
Hook Up

-

-

-

... More
Hook Up with existing pipeline by Cold Cutting Methodology including supply of localized nitrogen & sealing existing pipeline with dishend (supply by the Contractor).

1

-

-

... More
Hook Up with existing pipeline by Hot Tapping including supply of Split Tee (16"x16"x16", 600#), Hot Tap Machine and all other items required for the succesfull completion of the work & prepartion of cover chamber. Note: Actuated Full Bore Ball Valve shall be free issued to the Bidder by the Client/ Owner. However, Bidder shall check its suitability before starting Hot Tap Work.

1

-

-

... More
Internal Joint Coating

-

-

-

... More
All Field Joint shall be Internally Coated by the Bidder. However, material for the internal joint coatings shall be supplied by the Client/ Owner.

825

-

-

... More
Excavation, Dismantling & Transportation of 16" Existing Pipeline

-

-

-

... More
Excavation, Dismantling & Transportation of the Existing Pipeline including;- Locating of existing pipeline, excavation, cutting of the pipeline in joints , in average 12 mtr. Length, bevelling, transporation of pipe to the designated storage yard, backfilling & restoraration of the ROU to the satisfaction of the authorities, all HSE compliance shall be carried out as directed by Engineer In Charge/ Owner.

53000

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.