Industries And Commerce Department Tender
... More
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 5,00,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Hiring Services For Direct Assessment
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_ICD_23985_1Bid Award Id
ViewTender No
AGCL/PL/TENDER/DA/27/2021/02Tender Authority
Industries And Commerce Department ViewPurchaser Address
-Website
http://https://industries.assam.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
6.31
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
6.31
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
6.31
-
-
... More
For 500 mm NB Natural Gas Pipeline.
-
-
-
... More
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
3.02
-
-
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
3.02
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
3.02
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
3.02
-
-
... More
For 400 mm NB Natural Gas Pipeline.
-
-
-
... More
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
106.98
-
-
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
106.98
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
106.98
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
106.98
-
-
... More
For 350 mm N.B. Natural Gas pipeline.
-
-
-
... More
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
48.4
-
-
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
48.4
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
48.4
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
48.4
-
-
... More
For 300 mm N.B. Natural Gas pipeline.
-
-
-
... More
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
156.51
-
-
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
156.51
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
156.51
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
156.51
-
-
... More
For 200 mm N.B. Natural Gas pipeline.
-
-
-
... More
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
103.96
-
-
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
103.96
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
103.96
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
103.96
-
-
... More
For 150 mm N.B. Natural Gas pipeline.
-
-
-
... More
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
68.67
-
-
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
68.67
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
68.67
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
68.67
-
-
... More
For 100 mm N.B. Natural Gas pipeline.
-
-
-
... More
Conduct ECDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
53.42
-
-
... More
Conduct ICDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
53.42
-
-
... More
Conduct SCCDA Inspection for AGCL's pipelines inclusive of all four steps i.e. Pre Assessment, Indirect Inspection, Direct Examination and Post Assessment.
53.42
-
-
... More
Conduct Pipeline Topography Survey/ Mapping/Pipeline profile/Depth of Cover, Soil Resistivity Survey and Soil Chemical Analysis for all the above mentioned gas pipelines.
53.42
-
-
... More
PART II: CONTINGENT ITEM OF DA SURVEY- SUPPLY AND INSTALLATION OF COLD REPAIR COMPOSITE SLEEVES
-
-
-
... More
Supply of Composite Repair Sleeve Kit
-
-
-
... More
For 550 mm (22”) O.D. Pipeline For Normal Operating Temperature only
5
-
-
... More
For 500 mm (20”) O.D. Pipeline
-
-
-
... More
For Normal Operating Temperature
5
-
-
... More
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
5
-
-
... More
For 400 mm (16”) O.D. Pipeline
-
-
-
... More
For Normal Operating Temperature
5
-
-
... More
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
5
-
-
... More
For 350 mm (14”) O.D. Pipeline
-
-
-
... More
For Normal Operating Temperature
5
-
-
... More
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
5
-
-
... More
For 300 mm (12”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
For 200 mm (8”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
For 150 mm (6”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
For 100 mm (4”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
Supply of adhesive and filler material
-
-
-
... More
For 550 mm (22”) O.D. Pipeline For Normal Operating Temperature only
5
-
-
... More
For 500 mm (20”) O.D. Pipeline
-
-
-
... More
For Normal Operating Temperature
5
-
-
... More
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
5
-
-
... More
For 400 mm (16”) O.D. Pipeline
-
-
-
... More
For Normal Operating Temperature
5
-
-
... More
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
5
-
-
... More
For 350 mm (14”) O.D. Pipeline
-
-
-
... More
For Normal Operating Temperature
5
-
-
... More
For High Operating Temperature (Pipeline surface temperature greater than 50°C)
5
-
-
... More
For 300 mm (12”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
For 200 mm (8”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
For 150 mm (6”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
For 100 mm (4”) O.D. Pipeline
For Normal Operating Temperature only
5
-
-
... More
Supply of Magnetic Marker Bands
(Applicable for piggable pipelines only, for which intelligent pigging is envisaged in the future)
-
-
-
... More
For 500 mm (20”) O.D. Pipeline
5
-
-
... More
For 400 mm (16”) O.D. Pipeline
5
-
-
... More
For 350 mm (14”) O.D. Pipeline
5
-
-
... More
For 300 mm (12”) O.D. Pipeline
5
-
-
... More
Mobilization / Demobilization of Crew
(This item is activated only if repair job is planned by the Owner, beyond the DA Project time-period)
5
-
-
... More
Repairing of defective location, Coating Removal and Surface preparation for repair installation, Inspection using UT Wall Thickness Meter and Magnetic Particle Inspection and submitting Repair Report to the Owner on per defect location wise. (Digging of the pipeline will be done by AGCL)
-
-
-
... More
For 550 mm N.B. Natural Gas pipeline
5
-
-
... More
For 500 mm N.B. Natural Gas pipeline
5
-
-
... More
For 400 mm N.B. Natural Gas pipeline
5
-
-
... More
For 350 mm N.B. Natural Gas pipeline
5
-
-
... More
For 300 mm N.B. Natural Gas pipeline
5
-
-
... More
For 200 mm N.B. Natural Gas pipeline
5
-
-
... More
For 150 mm N.B. Natural Gas pipeline
5
-
-
... More
For 100 mm N.B. Natural Gas pipeline
5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements