Indradhanush Gas Grid Limited Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Indradhanush Gas Grid Limited - IGGL Tender
Consultancy Services
Civil And Architectural Services
Eprocure
Opening Date20 Aug 2024
Closing DateCancelled
Tender AmountRefer Documents
Costs
EMD
₹ 21,476Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Hiring Of Agency For Conducting Detailed Route Survey
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_IGGL_205389_1Bid Award Id
ViewTender No
IGGL-100062Tender Authority
Indradhanush Gas Grid Limited ViewPurchaser Address
-Website
http://etenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Part - D: Pakyong to Ranipool (Sikkim) - Detailed Route Survey (including submission of report) Carrying out Detailed Route Survey of the entire pipeline route, as per the detailed Scope of Work in Special Conditions of Contract (SCC) including but limited to the following: Deploying Differential Global Positioning to provide DGPS control points at every 4 to 5 km interval based on WGS-84 UTM coordinate system; Deploying total stations for traverse control between DGPS stations; Establishing UTM Coordinates of all TPs, IPs and Flag control points and other important points as desired by the owner; Taking all survey measurements, readings required for Planimetry, Information & Feature capturing and levels with respect to MSL; Obtaining base maps from authorised source (having clearance from Survey of India) of all districts (20 km on both sides of ROW) and submission to owner; Preparation and submission of Route map, Profile map, Crossing drawing, Right of way planimetry (within 50m on either side of ROW), Plotting of alignment of Plan & Profile of NHIDCL as per NH specification or preparation of P&P and subsequent plotting of pipeline alignment, if required, Alignment sheets etc.; Preparation and submission of alignment sheets compiling Seismic fault line data & plotting of fault lines on route maps, population density index and other required data from the previous DES report of In-RIMT as well as marking of alignment on ground; DGPS survey details of forest crossing in the pipeline route to be incorporated in final report. Collection of other details including all labour, material, equipment etc. complete in all respects as per specifications and direction of Engineer-in-Charge/ Site Engineer; Integrating all survey details and deliverables, including base maps, into owner's Arc GIS (ESRI) server to obtain seamless geo-referenced data.
9.5
-
-
... More
Part - E: Modification/Re-route as per site conditions (Sikkim) - Detailed Route Survey (including submission of report) Carrying out Detailed Route Survey of the entire pipeline route, as per the detailed Scope of Work in Special Conditions of Contract (SCC) including but limited to the following: Deploying Differential Global Positioning to provide DGPS control points at every 4 to 5 km interval based on WGS-84 UTM coordinate system; Deploying total stations for traverse control between DGPS stations; Establishing UTM Coordinates of all TPs, IPs and Flag control points and other important points as desired by the owner; Taking all survey measurements, readings required for Planimetry, Information & Feature capturing and levels with respect to MSL; Obtaining base maps from authorised source (having clearance from Survey of India) of all districts (20 km on both sides of ROW) and submission to owner; Preparation and submission of Route map, Profile map, Crossing drawing, Right of way planimetry (within 50m on either side of ROW), Plotting of alignment of Plan & Profile of NHIDCL as per NH specification or preparation of P&P and subsequent plotting of pipeline alignment, if required, Alignment sheets etc.; Preparation and submission of alignment sheets compiling Seismic fault line data & plotting of fault lines on route maps, population density index and other required data from the previous DES report of In-RIMT as well as marking of alignment on ground; DGPS survey details of forest crossing in the pipeline route to be incorporated in final report. Collection of other details including all labour, material, equipment etc. complete in all respects as per specifications and direction of Engineer-in-Charge/ Site Engineer; Integrating all survey details and deliverables, including base maps, into owner's Arc GIS (ESRI) server to obtain seamless geo-referenced data.
8.9
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements