Indradhanush Gas Grid Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Indradhanush Gas Grid Limited - IGGL Tender

Services
Civil And Construction
Pipe Line Project
Eprocure
Opening Date16 Feb 2022
Closing Date9 Mar 2022
Tender Amount₹ 4,05,87,920 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
In Water

14

-

-

... More
Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

2955

-

-

... More
In Water

296

-

-

... More
Drilling through rock with Nx size double tube core, barrel up to a depth as Specified in SCC below GL/bed level using TC bit/diamond bit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE : i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

350

-

-

... More
In Water

35

-

-

... More
Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge

1429

-

-

... More
Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge

1367

-

-

... More
Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge.

661

-

-

... More
Sieve analysis

2090

-

-

... More
Hydrometer analysis

2090

-

-

... More
Atterberg limits

2090

-

-

... More
Natural moisture content

2090

-

-

... More
Bulk density of soil

2090

-

-

... More
Dry density of soil

2090

-

-

... More
Specific gravity

2090

-

-

... More
Direct Shear Test

2090

-

-

... More
Triaxial Shear Test (UD)

2090

-

-

... More
Permeability Test

2090

-

-

... More
Cosolidation Test

2090

-

-

... More
Unconfined compression test

2090

-

-

... More
Swelling pressure test

2090

-

-

... More
Free swell index test

2090

-

-

... More
Shrinkage limit test

2090

-

-

... More
Uniaxial compressive strength of rock sample

331

-

-

... More
Specific gravity test of rock sample

331

-

-

... More
PART: A SIKKIM

-

-

-

... More
Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope of work. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

34

-

-

... More
In Water

5

-

-

... More
Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

830

-

-

... More
In Water

83

-

-

... More
Drilling through rock with Nx size double tube core, barrel up to a depth as Specified in SCC below GL/bed level using TC bit/diamond bit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE : i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

125

-

-

... More
In Water

13

-

-

... More
Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge

394

-

-

... More
Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge

384

-

-

... More
Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge

191

-

-

... More
Sieve analysis

585

-

-

... More
Hydrometer analysis

585

-

-

... More
Atterberg limits

585

-

-

... More
Natural moisture content

585

-

-

... More
Bulk density of soil

585

-

-

... More
Dry density of soil

585

-

-

... More
Specific gravity

585

-

-

... More
Direct Shear Test

585

-

-

... More
Triaxial Shear Test (UD)

585

-

-

... More
Permeability Test

585

-

-

... More
Cosolidation Test

585

-

-

... More
Unconfined compression test

585

-

-

... More
Swelling pressure test

585

-

-

... More
Free swell index test

585

-

-

... More
Shrinkage limit test

585

-

-

... More
Uniaxial compressive strength of rock sample

96

-

-

... More
Specific gravity test of rock sample

96

-

-

... More
PART: A NAGALAND

-

-

-

... More
Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope of work. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

76

-

-

... More
In Water

2

-

-

... More
Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

890

-

-

... More
In Water

89

-

-

... More
Drilling through rock with Nx size double tube core, barrel up to a depth as Specified in SCC below GL/bed level using TC bit/diamond bit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE : i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

50

-

-

... More
In Water

5

-

-

... More
Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge

514

-

-

... More
Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge

444

-

-

... More
Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge.

188

-

-

... More
Sieve analysis

702

-

-

... More
Hydrometer analysis

702

-

-

... More
Atterberg limits

702

-

-

... More
Natural moisture content

702

-

-

... More
Bulk density of soil

702

-

-

... More
Dry density of soil

702

-

-

... More
Specific gravity

702

-

-

... More
Direct Shear Test

702

-

-

... More
Triaxial Shear Test (UD)

702

-

-

... More
Permeability Test

702

-

-

... More
Cosolidation Test

702

-

-

... More
Unconfined compression test

702

-

-

... More
Swelling pressure test

702

-

-

... More
Free swell index test

702

-

-

... More
Shrinkage limit test

702

-

-

... More
Uniaxial compressive strength of rock sample

94

-

-

... More
Specific gravity test of rock sample

94

-

-

... More
PART: A MANIPUR

-

-

-

... More
Deployment-& Erection of Boring craft & rig in each borehole location as per specifications,. SCC. Scope of work. and direction of Engineer-in-charge Note. Ï) Boring depth shall be measured from Ground Level/River Bed level. Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

162

-

-

... More
In Water

3

-

-

... More
Conducting Boring at site in soil, as per specification ,SCC ,Scope of work and direction of Engineer-in-charge ,NOTE: i) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

3760

-

-

... More
In Water

376

-

-

... More
Drilling through rock with Nx size double tube core, barrel up to a depth as Specified in SCC below GL/bed level using TC bit/diamond bit as per specifications , SC C, Scope of work and direction of Engineer-in-charge . NOTE : i) ) Boring depth shall be measured from ground level/River bed level . Depth of actual soil strata bored / rock strata drilled shall be considered for payment. ii) Mere deployment of rig/ boring/ drilling in river bed will not be considered as deployment/boring /drilling in water unless : it is actually carried out in water, iii) Rate shall be inclusive of grouting back the boreholes as Specified including cost for material, equipments and Labour iy) Core recovery 25% shall be designated as rock v)Records rig of rock core characteristics shalI be aș pęr specification

-

-

-

... More
In Land

75

-

-

... More
In Water

8

-

-

... More
Standard penetration test at different depth as per specification,SCC,Scope of work and direction of Engineer-in-charge

1192

-

-

... More
Collection of undisturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge

1140

-

-

... More
Collection of disturbed samples at different depth as per specifications, SCC. Scope of work and direction of Engineer in-charge

515

-

-

... More
Sieve analysis

1707

-

-

... More
Hydrometer analysis

1707

-

-

... More
Atterberg limits

1707

-

-

... More
Natural moisture content

1707

-

-

... More
Bulk density of soil

1707

-

-

... More
Dry density of soil

1707

-

-

... More
Specific gravity

1707

-

-

... More
Direct Shear Test

1707

-

-

... More
Triaxial Shear Test (UD)

1707

-

-

... More
Permeability Test

1707

-

-

... More
Cosolidation Test

1707

-

-

... More
Unconfined compression test

1707

-

-

... More
Swelling pressure test

1707

-

-

... More
Free swell index test

1707

-

-

... More
Shrinkage limit test

1707

-

-

... More
Uniaxial compressive strength of rock sample

384

-

-

... More
Specific gravity test of rock sample

384

-

-

... More
Submission of final technical report, in hard copy (six sets) as well assoft copy (in CD),asper tender specifications and instruction of EIC/ Site Engineer for all States

1

-

-

... More
PART-B: WEST BENGAL

-

-

-

... More
Cadestral survey (upto preparation of Schedule u/s 3(1) of P&MPAct ,1962

-

-

-

... More
Carrying out Cadastral Survey, for laying cross country petroleumpipeline, obtaining/ procuring latest village maps from Revenueauthorities (actual cost incurred on procurement to be reimbursed byowner on reciept of proof of payment), tracing/ scanning the same andstorage in both hard and soft reproducible forms, plotting the pipelineroute on village maps and marking on them the Intermediate Points (IPs)and Turning Points (TPs) of the surveyed route as staked on ground,identification of survey numbers of individual owners and plotting onvillage maps as per latest revenue records, preparation of field bookand computation of area in each plot coming within limits of ROUcorridor, collection of Jamabandi (the record of right holders) fromrevenue authorities in respect of each plot falling within ROU limits and identification of owner and occupier thereof, collection of interimmutations, if any, and incorporation in Jamabandi and other works asper detailed scope of work specified in Special Conditions of Contract(SCC) and specifications of tender documents and direction of Engineer-in-Charge, inclusive of all labour, material, equipment etc.including compensation to farmers on account of any damage to crops,fields etc. while conducting survey through fields, works complete inall respects, upto and including preparation & submission of schedule for 3(1) Notification for establishing right of users (ROU) in Right of Way (ROW) under P&MP Act 1962 for new/additonal pieline ROW, complete in all respects.Integrating cadastral & 3(1) details on Owner's Arc GISserver to obtain seamless Geo-referenced data.

55

-

-

... More
Providing services for establishing Right of Users (ROU) in Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including followup for 3(1) Gazette notification, preparation of Erratum & Corrigendum (it required), preparation & serving of 3 (1) notices. facilitating hearing & disposal of objections, preparation of schedule for 6(1) Notification, followup for Gazette notification, preparation of Erratum & Corrigendum, preparation & serving of 6(1) notices, entry of Gazette notification in village records. collection of land rates, calculation of land compensation payable & serving of compensation notices, assistance to Competent Authority in preparation of award to individual landowners etc. as per detailed scope of work specified in special conditions of contract and specifications of tender document and direction of Engineer-in-Charge/ Site Engineer inclusive of all labour, material, equipment etc. complete in all respects. Integration of ROU details on Owners Arc GIS server to obtain seamless geo-referenced data.

-

-

-

... More
For acquinng ROW of 20 m width for newly proposed pipeline

55

-

-

... More
OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS

-

-

-

... More
Obtaining approvals/ permissions from appropriate respective State! National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River. Canal Drain crossings or any other utility crossings etc as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner's Arc GIS (ESRI) server along the entire Pipeline Route "Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis"

-

-

-

... More
National Highway Crossings under each authority

1

-

-

... More
State Highway Crossings under each authority

1

-

-

... More
Other road crossings under each authority

3

-

-

... More
Railway Crossings (for each individual crossing)

2

-

-

... More
River Crossings under each authority

3

-

-

... More
Canal Crossings under each authority

1

-

-

... More
Other pipeline crossings and utilities

4

-

-

... More
Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority

4

-

-

... More
Forest under each authority

1

-

-

... More
PART-B: SIKKIM

-

-

-

... More
OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS

-

-

-

... More
Obtaining approvals/ permissions from appropriate respective State! National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River. Canatl Drain crossings or any other utility crossings etc as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner's Arc GIS (ESRI) server along the entire Pipeline Route "Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis"

-

-

-

... More
National Highway Crossings under each authority

1

-

-

... More
State Highway Crossings under each authority

1

-

-

... More
Other road crossings under each authority

1

-

-

... More
River Crossings under each authority

1

-

-

... More
Canal Crossings under each authority

1

-

-

... More
Other pipeline crossings and utilities

1

-

-

... More
Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority

1

-

-

... More
Forest for each state

1

-

-

... More
PART B:MANIPUR

-

-

-

... More
OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS

-

-

-

... More
"Obtaining approvals/ permissions from appropriate respective State/ National and other statutory authorities for various pipeline crossings enroute like National Highways. State Highways, other Roads, Railways, River, Canal./ Drain crossings or any other utility crossings etc. as per detailed scope of work specified in Special Conditiosn of Contract (SCC) and specifications of the tender documents and direction of Engineer-in-Charge/ Site Engineer. Integrating all details on Owner's Arc GIS (ESRI) server along the entire Pipeline Route" "Note: 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings. each crossing shall be treated as separate and payment shall be made on unit basis"

-

-

-

... More
National Highway Crossings under each authority

1

-

-

... More
State Highway Crossings under each authority

1

-

-

... More
Other road crossings under each authority

1

-

-

... More
River Crossings under each authority

3

-

-

... More
Other pipeline crossings and utilities

1

-

-

... More
Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority

1

-

-

... More
Forest for each state

1

-

-

... More
PART-B NAGALAND

-

-

-

... More
Cadestral survey (upto preparation of Schedule u/s 3(1) of P&MPAct ,1962

-

-

-

... More
Carrying out Cadastral Survey, for laying cross country petroleumpipeline, obtaining/ procuring latest village maps from Revenueauthorities (actual cost incurred on procurement to be reimbursed byowner on reciept of proof of payment), tracing/ scanning the same andstorage in both hard and soft reproducible forms, plotting the pipelineroute on village maps and marking on them the Intermediate Points (IPs)and Turning Points (TPs) of the surveyed route as staked on ground,identification of survey numbers of individual owners and plotting onvillage maps as per latest revenue records, preparation of field bookand computation of area in each plot coming within limits of ROUcorridor, collection of Jamabandi (the record of right holders) fromrevenue authorities in respect of each plot falling within ROU limitsand identification of owner and occupier thereof, collection of interimmutations, if any, and incorporation in Jamabandi and other works asper detailed scope of work specified in Special Conditions of Contract(SCC) and specifications of tender documents and direction ofEngineer-in-Charge, inclusive of all labour, material, equipment etc.including compensation to farmers on account of any damage to crops,fields etc. while conducting survey through fields, works complete inall respects, upto and including preparation & submission of schedulefor 3(1) Notification for establishing right of users (ROU) in Right ofWay (ROW) under P&MP Act 1962 for new/additonal pieline ROW, complete inall respects.Integrating cadastral & 3(1) details on Owner's Arc GISserver to obtain seamless Geo-referenced data

5

-

-

... More
"Providing services for establishing Right of Users (ROU) in Right of Way (ROW) under P&MP Act 1962, for laying cross country pipeline including followup for 3(1) Gazette notification, preparation of Erratum & Corrigendum (if required), preparation & serving of 3 (1) notices, facilitating hearing & disposal of objections. preparation of schedule for 6(1) Notificatin, followup for Gazette notification, preparation of Erratum & Corrigendum. preparation & serving of 6(1) notices. entry of Gazette notification in village records, collection oftarld rates. calculation of land compensation payable & serving of compensation notices, assistance to Competent Authority in preparation of award to individual landowners etc as per detailed scope of work specified in special conditions of contract and specifications of tender document and direction of Engineer•in-Charge/ Site Engineer inclusive of all labour, material. equipment etc complete in all respects. Integration of ROU details on Owners Arc GIS server to obtain scentless gee-referenced data"

-

-

-

... More
For acquiring ROW of 20 m width for newly proposed pipeline

5

-

-

... More
OBTAINING APPROVALS / PERMISSIONS FOR PIPELINE CROSSINGS

-

-

-

... More
"Obtaining approvals/ permissions from appropriate respective State/ National and other statutory authorities for various pipeline crossings enroute like National Highways, State Highways, other Roads, Railways, River, Canal! Drain crossings or any other utility crossings etc. as per detailed scope of work specified in Special Conthliosn of Contract (SCC) and specifications of the tender documents and direction of Engineer•in-Charge/ Site Engineer. Integrating all details on Owner's Arc GIS (ESRI) server along the entire Pipeline Route" "Note 1) Payment shall be made for obtaining each permission. Cluster of crossings needing permission from same Authority shall be considered as one permission, for the purpose of payment 2) For Railway crossings, each crossing shall be treated as separate and payment shall be made on unit basis"

-

-

-

... More
NH road crossing under each authority

1

-

-

... More
State Highway Crossings under each authority

1

-

-

... More
Other road crossings under each authority

4

-

-

... More
River Crossings under each authority

1

-

-

... More
Other pipeline crossings and utilities

3

-

-

... More
Water bodies like ponds. lakes, creek, drains, nalas etc. under each authority

4

-

-

... More
Forest for each state

1

-

-

... More
PART-C: WEST BENGAL

-

-

-

... More
RoU opening/for entire RoW while laying the pipe line

55

-

-

... More
Office/ establishment charges per month per camp in any state

18

-

-

... More
PART-C NAGALAND

-

-

-

... More
RoU opening/for entire RoW while laying the pipe line

5

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.