Central Water Commission Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Central Water Commission - CWC Tender
Civil And Construction
Eprocure
Opening Date30 Sep 2024
Closing DateCancelled
Tender Amount₹ 19,09,549
Costs
EMD
₹ 38,191Document Cost
₹ 500Tender Fee
Refer Documents
Summary
Morphology Survey On River Brahmaputra For 30 Nos. River Cross Section
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CWC_828465_1Tender No
Morph.Brah/DB/2015-MBD/877-80Tender Authority
Central Water Commission ViewPurchaser Address
-Website
http://http://cwc.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Morphology Survey on River Brahmaputra for 30 nos. River Cross Section under MBD with an average width of (10-15) Km at 10 Km intervals with reference to GTS Benchmark value for the year 2024-25.
Morphology Survey on River Brahmaputra for 30 nos. River Cross Section under MBD with an average width of (10-15) Km at 10 Km intervals with reference to GTS Benchmark value for the year 2024-25.
BOQ Items
... More
Excavating holes more than 0.10 cum & upto 0.5 cum including getting out the excavated soil, then returning the soil as required in layers not exceeding 20cm in depth, including consolidating each deposited layer by ramming, watering etc, disposing of surplus excavated soil, as directed within a lead of 50 m and lift upto 1.5 m. All kinds of soil
15.36
-
-
... More
Footing: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.2 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
4.8
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns
24
-
-
... More
Pillar upto Plinth: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 4.1.2 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)
5.94
-
-
... More
Pillar above Plinth: Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources).
6.48
-
-
... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Columns, piers, abutments, pillars, posts and struts
82.8
-
-
... More
Final Preparation of report and charts/graphs both in soft and hard formats including printing, hard binding, and Lamination as per the proformas/guidelines provided by CWC.
4
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements