Brahmaputra Board Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 1,68,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_BB_779994_2Bid Award Id
ViewTender No
BB/EE/NBD/TECH-78/431Tender Authority
Brahmaputra Board ViewPurchaser Address
-Website
http://eprocure.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Dong Water management practices in BTC area -Improvement of Kalanadi Dong Irrigation system
BOQ Items
... More
Cement concrete work in prop. 1:3:6 with aggregate of size 13 mm to 38 mm free from dust, dirt & other foreign materials, including rodding/vibrating bailing out of water where necessary & curing with supplying of materials complete as directed. (Temporary arrangement for obtaining clean water should be made at site) a) River shingles. i) With Shuttering with dewatering
71.9
-
-
... More
Cement concrete work in prop. 1:3:6 with aggregate of size 13 mm to 38 mm free from dust, dirt & other foreign materials, including rodding/vibrating bailing out of water where necessary & curing with supplying of materials complete as directed. (Temporary arrangement for obtaining clean water should be made at site) a) River shingles. i) ii) Wiithout Shuttering with dewatering
56.5
-
-
... More
Cement concrete work in prop. 1:3:6 with aggregate of size 13 mm to 38 mm free from dust, dirt & other foreign materials, including rodding/vibrating bailing out of water where necessary & curing with supplying of materials complete as directed. (Temporary arrangement for obtaining clean water should be made at site) a) River shingles. i) iii) With Shuttering without Dewatering
52.82
-
-
... More
Cement concrete work in prop. 1:2:4 with aggregate of size 6 mm to 20 mm free from dust, dirt & other foreign materials, including rodding/vibrating bailing out of water where necessary & curing with supplying of materials complete as directed. (Temporary arrangement for obtaining clean water should be made at site) a) River shingles. i)Without shuttering with dewatering
9
-
-
... More
Cement concrete work in prop. 1:4:8 with aggregate of size 13 mm to 38 mm free from dust, dirt & other foreign materials, including rodding/vibrating bailing out water where necessary & curing with supplying of all materials complete as directed (Temporary arrangement for obtaining clean water should be made at site) i)With Shuttering with dewatering
13.2
-
-
... More
Collection & supply of one man size hard Boulder of size 23 cm. to 30 cm. including loading, unloading and stacking at mesurable stacks at site not more than 1 m height including paying forest royalty, sales tax etc. including local carriage to work site. (Distance from Quarry to work site = 24 K.m.)
74.5
-
-
... More
Labour charge for pitching with one man size Boulder including dressing and ramming the seat to proper size and slope pitching etc. eith local carriageof Boulders from a distance of 50 M with lift upto 3 M complete as directed.
74.5
-
-
... More
Collection, supply and spreading of gravel including stacking at suitable places at work site free from dust, dirt and other foreign impurities paying royalty, sales Tax etc. including carrying to work site complete as directed (Hard river gravel of size 13 mm to 38 mm). (Distance from Quarry to work site = 25.00 K.M.)
38
-
-
... More
Earth work in back filling of structure obtained from out side borrow pits filling in 15cm layers, ramming, watering including paying compensation of land if any with lead upto 30 M and lift 1.50 M.
448
-
-
... More
Supplying and mixing of Repidite
289
-
-
... More
12 mm thick cement plastering including clearing the surface and curing etc. complete as directed.(1:3)
96.65
-
-
... More
Construction of Village Road Crossing Culvert for Improvement of Kalanadi Dong Irrigation
-
-
-
... More
Earth work in excavation in foundation of head work in all type soil as per design and drawing including dressing the foundation shoring etc. removing the surplus spoils by head lead to safe distance from the working place and depositing the required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation, complete as directed at site.(Including bailing out stagnant rain water where necessary). All types of soil (except soils mixed with gravel & boulder)
243.79
-
-
... More
C.C.Work in Prop. 1:3:6(M-100) with aggregate of size 13 mm to 38 mm free from dirt,dust and other foreign materials, including rodding/vibrating,bailing out water where necessary & curing with supplying of all materials complete as directed.(Temporary arrengement for obtaining clean water should be made at site. i) Without Shuttering without dewatering
71.2
-
-
... More
C.C.Work in Prop. 1:3:6(M-100) with aggregate of size 13 mm to 38 mm free from dirt,dust and other foreign materials, including rodding/vibrating,bailing out water where necessary & curing with supplying of all materials complete as directed.(Temporary arrengement for obtaining clean water should be made at site. i) With Shuttering without dewatering
109.52
-
-
... More
R.C.C.Work in Prop. 1:3:6(M-100) with aggregate of size 13 mm to 38 mm free from dirt,dust and other foreign materials, including rodding/vibrating,bailing out water where necessary & curing with supplying of all materials complete as directed.(Temporary arrengement for obtaining clean water should be made at site. i) With Shuttering without dewatering
25.92
-
-
... More
Supplying , fitting,fixing and laying of T.S. rod of all sizes in position as per design and drawing as required including cutting,cranking and making hooks with necessary lappages and tying with wire(black). Complete as directed including cost of all materials.
40.8
-
-
... More
12mm thick cement Plastering including clearing the surface &curing etc. Complete as directed.
207.36
-
-
... More
Collection and supply of one man size hard river Boulder of size 23 cm to 30 cm including loading ,unloading,stacking at site not more than 1.00 m height including paying forest royalty,sale tax etc. including local carriage to work site.(Distance=25 K.M.)
62.4
-
-
... More
Labour Charge for pitching with one man size boulder including dressing ,ramming the seat to proper size & slpoe pitching etc. with local carriage from a distance of of 50 m with lift up to 3 m.Complete as directed.
62.4
-
-
... More
Earth work in back filling og structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
400
-
-
... More
Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
648
-
-
... More
Collection and supply of gravel including spreading free from dust, dirt and other foreign materials, paying forest royalty, sales tax etc. at work site including stacking in measurable stacks complete as directed. (Considering average distance of 25 Km
216
-
-
... More
Construction of Cattle Crossing Culvert for Improvement of Kalanadi Dong Irrigation
-
-
-
... More
Earth work in excavation in foundation of canal structures in all type soil as per design and drawing including dressing the foundation shoring etc. removing the surplus spoils by head lead to safe distance from the working place and depositing the required spoils in uniform layers dressing, watering, breaking clods not more than 10mm cube with compensation, complete as directed at site.(Including bailing out stagnant rain water where necessary). All types of soil (except soils mixed with gravel & boulder)
117.65
-
-
... More
Cement concrete work in prop.1:3:6 with aggregate of size 13mm to 38mm free from dust, dirt & other foreign materials, including rodding/ vibrating bailing out of water where necessary & curing with supplying of materials complete as directed (Temporary arragement for obtaining clean water should be made at site) a) River shingles. i) Without Shuttering without dewatering
38.55
-
-
... More
Cement concrete work in prop.1:3:6 with aggregate of size 13mm to 38mm free from dust, dirt & other foreign materials, including rodding/ vibrating bailing out of water where necessary & curing with supplying of materials complete as directed (Temporary arragement for obtaining clean water should be made at site) a) River shingles. i) With Shuttering without dewatering
51.55
-
-
... More
R.C.C. work in prop. 1:2:4 with aggreagte of size 6 mm to 20 mm free from dust, dirt and other foreign materials with proper reinforcement as design and drawing including rodding/vibrating, curing etc. with bailing out water necessary complete as directed. (Payment of reinforcement will be made separately) i) With Shuttering without dewatering
7.9
-
-
... More
Supplying fitting fixing including laying reinforcment bar in position in R.C.C work including cutting bending cracking with two piles 90mm ennealed wire hooking tying complete as directed.
11.7
-
-
... More
12mm thick cement Plastering including clearing the surface &curing etc. Complete as directed.
140.7
-
-
... More
Collection & supply of one man size hard Boulder of size 23 cm. to 30 cm. including loading, unloading and stacking at mesurable stacks at site not more than 1 m height including paying forest royalty, sales tax etc. including local carriage to work site. (Distance from Quarry to work site = 25 K.m
73.5
-
-
... More
Labour charge for pitching with one man size Boulder including dressing and ramming the seat to proper size and slope pitching etc. eith local carriageof Boulders from a distance of 50 M with lift upto 3 M complete as directed.
73.5
-
-
... More
Earth work in back filling og structure with earth obtaining from outside borrow pits, filling with 15cm layer ramming, dressing and compaction and watering including paying compensation of land, if any with lead up to 30m and lift 1.50m complete as directed.
250
-
-
... More
Earthwork in all soils in canal embankment & bed filling as per designed section and grade by truck carriage for a minimum distance of 4 KM including paying compensation of earth obtained from private, if any loading, unloading and stacking at not more than 1.00 M height and spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungles, removing trees upto 15 cm dia & uprooting roots & stumps etc. from the seat of embankment, breaking clods to not more than 10 mm cube, ramming, dressing, roughening the seat of embankment, profiling etc. with all lead and lift complete as directed.
324
-
-
... More
Providing outlet with R.C.C. Hume Pipe of 15 cm dia including supplying, fitting, fixing and laying in position with collar joints as per drawing and design and making a chamber in D/S with P.C.C in prpp 1:3:6 including plastering in exposed portion as directed by the deptt. Complete.
25
-
-
... More
PROTECTION WORK AT BREACH PORTION OF RIGHT CANAL
-
-
-
... More
Collection & supply of one man size hard Boulder of size 23 cm. to 30 cm. including loading, unloading and stacking at mesurable stacks at site not more than 1 m height including paying forest royalty, sales tax etc. including local carriage to work site. (Distance from Quarry to work site = 25 K.m.)
326.04
-
-
... More
Construction of 2.00Mx1.00M rectangular boulder sausage including supplying of materials with 25cm to 30cm size boulders collecting from a lead of 25 KM encased in 15cm mesh of 8G hexagonal wire netting and filling the voids between the boulders with stone not exceeding 18 cm in size tied with 8G galvanized tying wire at 30 cm apart , laid in position as directed including necessary local carriage of materials, paying necessary forest royaty including providing 1 (one) no. of jati bamboo horizontal runner along the top of the sausage with vartical bhaluka bamboo post 1.20 M apart driven at least 0.60 M below ground and tying with sausage etc. all complete as directed.
160
-
-
... More
-Labour charge for pitching with one man size Boulder including dressing and ramming the seat to proper size and slope pitching etc. eith local carriageof Boulders from a distance of 50 M with lift upto 3 M complete as directed.
326.04
-
-
... More
IMPROVEMENT OF EXISTING APPROACH ROAD LEADING TO WORK SITE OF SPILLWAY
-
-
-
... More
Cutting jungles and trees upto 50 cm girth including uprooting roots and stumpsand removing them from site of work etc, complete as directed
5100
-
-
... More
Collection and supply including spreading of sand mixed gravel contains 40% of sand and 60% of river gravel of size 13 mm to 38 mm free from all foreign materials including carriage from quarry to the work site loading, unloading and stacking in measurable stacks as directed by the department (Including paying of forest royalty and sales tax etc.) distance=25 K.M
432
-
-