Border Security Force Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 3,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSF_820877_1Tender No
1597-99Tender Authority
Border Security Force ViewPurchaser Address
-Website
http://http://bsf.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Machinery spaces and bilges are to be thoroughly cleaned and internal structure to be examined.
1
-
-
MAIN ENGINE, Make and Types – 2 x Cummins, QSB 6.7 4801D1 Ref No QSB 6.7 4801NT, Power : 473 HP. Both main engine to be dismantled, routine overhauling to be carried out by using spares by OEM authorized suppliers.Engine Srl No. 74238015 (Port) Run Hrs 466.30 Engine Srl No. 74238022 (STBD)
1
-
-
Fuel filters, lube oil filters to be replaced with new one.
1
-
-
Engine oil required to be changed as per OEM.
1
-
-
Air filter to be replaced with new one.
1
-
-
Coolant to be changed as per OEM.
1
-
-
Sea water pump to be serviced.
1
-
-
All belts to be replaced with new one.
1
-
-
Fresh water pumps to be serviced.
1
-
-
Low Lube oil pressure gauge to be renewed.
1
-
-
All sensors to be calibrated.
1
-
-
Fuel pump to be calibrated.
1
-
-
Injector to be calibrated.
1
-
-
Engine operation instruments to be serviced.
1
-
-
Self-starter to be serviced.
1
-
-
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
PROPULSION UNIT
Shaft (P&S) Propeller (P&S) Rudders to be withdrawn, visual examination and NDT as required to be carried out.
1
-
-
Shaft (P&S), Rudder stock (P&S) bush clearness to be verified and to be renewed.
1
-
-
Complete radar room cleaning & to be painted with FRP flow coat.
1
-
-
DIESEL GENERATOR SET
Routines/overhaul to be carried out by using spares from OEM authorized suppliers.
1
-
-
Diesel engines and Alternator to be shown in dismantled condition
1
-
-
DG fuel pump to be overhauled/replaced.
1
-
-
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
AIR CONDITIONING SYSTEM
Servicing of AC and ventilation system to be carried out.
1
-
-
AC discharge water leakage into Wheel house to be repaired.
1
-
-
SPECIAL EQUIPMENT
Echo sounder require servicing.
1
-
-
GPS not working require repairing.
1
-
-
Magnetic compass required to be calibrated.
1
-
-
STBD side search light not working.
1
-
-
All navigation lights to be checked and if required to be replaced.
1
-
-
ANCHOR
Anchor and anchor chain cable accessories to be cleaned, ranged and gauging to be carried. Defective if any to be renewed.
1
-
-
Anchor capstan motor not working, to be replaced/ repaired.
1
-
-
PAINTING
Before painting all portion to be cleaning.
Under water portion anti failing paint approx – 45 Sq mtr area a) Safe Guard Universal ES Grey – 1 Coat b) Pen Guard HB Primer – 1 Coat c) Sea Quantum Pro-U, Light Red –1coat d) Sea Quantum Pro-U Dark Red – 1Coat
1
-
-
Upper side all FRP body required to be buffing and polishing to be required. After the polishing required to be below mentioned paint in use to all FRP body upper side except under water portion a) Hardtop XP Ral 6003 b) Hard top XP Ral 7000 c) Hard top XP Ral 7040 d) Pen guard HB Gray
1
-
-
AFT deck and all rounds walk way anti-skid painting
1
-
-
Complete bilge cleaning and painting with FRP flow coat paint
1
-
-
The Mechanized boat name, ID No. BSF emblems and National flag shall on both sides of the hull at superstructure at on appropriate place – 02 Nos
1
-
-
Fibre green awning sheet installed in place of canopy cover
1
-
-
BATTERIES
04 Nos. 12 Volt 25 Plate Batteries required to be replaced.
1
-
-
01 No 12 Volt 13 Plate Battery required to be replaced.
1
-
-
All Batteries terminal to be replaced with new one.
1
-
-
GEAR BOX (PORT SIDE & STBD SIDE)
Both Gear boxes to be overhauled as per OEM recommendations and to be carried out by using spares from OEM authorized suppliers.
1
-
-
All Zink rods to be replaced with new one.
1
-
-
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
SYSTEMS VALVES, PIPE LINES AND MOTORS
Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any. Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any.
1
-
-
On completion, hydro test @ 1.5 times of the working pressure to be carried out.
1
-
-
Line valves to be overhauled and to be hydro tested @ 1.5 times of the working pressure.
1
-
-
Sea chest valves, strainer and overboard discharge valves to be repaired/renewed.
1
-
-
On completion of fitment on board, operational trial to be carried out.
1
-
-
PUMP AND MOTORS
Fire/Bilge pump required to be overhauled/ serviced
1
-
-
Steering pump required to be overhauled/ serviced
1
-
-
Sea water pumps required to be overhauled/ serviced
1
-
-
Fresh water pump required to be overhauled/ serviced
1
-
-
Engine room 02 Nos. Blower motor required to be overhauled/serviced
1
-
-
WHEEL HOUSE
Leakage at wheel house roof through bridge deck.
1
-
-
02 Nos Window wiper motors to be serviced.
1
-
-
01 No Pilot & 04 Nos passengers seat leather cover to be renewed with new one.
1
-
-
Window wiper blade and water sprinklers to be replaced with new one.
1
-
-
Wheel house door handle to be provided.
1
-
-
Wheel house door’s rubber gasket to be renewed.
1
-
-
TANKS
02 Nos Fuel tanks to be cleaned
1
-
-
01 No Fresh water tank to be cleaned.
1
-
-
Fuel tank top plastic cover/cap broken on main deck AFT STBD side, to be replaced.
1
-
-
ELECTRICAL ITEMS
Insulation resistance test (Mugger test) and original equipment manufacture’s (OEM) recommendation for preventive maintenance to be carried out for the following electrical items. a) All electrical machinery including Motors & Transformers. b) Power and lighting circuits. c) Main switch board. d) Fire control panel.
1
-
-
Emergency light not working
1
-
-
06 Nos Bunk fans required to be new fitted.
1
-
-
FIRE FIGHTING/SAFETY EQUIPMENT’S
Suction pipe line of DD fire pump to be provided newly.
1
-
-
New starting rope of DD fire pump to be provided.
1
-
-
Servicing of DD Fire pump to be carried out.
1
-
-
All fire extinguishers required refilling.
1
-
-
All smoke detector and fire detector system required to be replaced with new one.
1
-
-
Engine room fire sensors to be checked.
1
-
-
New Box required for keeping Hose pipe of DD fire pump.
1
-
-
The fire hose found leaking water which is fitted with main deck, required replaced.
1
-
-
LIVE SAVING APPLIANCES /FCP ITEMS
02 Nos Life rafts to be provided on board.
1
-
-
Liner rope of Life Buoy to be changed.
1
-
-
All LSA/FCP items to be overhauled to be replaced with one. (Expired items).
1
-
-
FENDER
D’ shape Rubber fender at AFT STBD side damaged, to be renewed.
1
-
-
04 Nos Portable Pneumatic fender to be replaced with new one.
1
-
-
OTHER
Leakage into engine room through soft patch area from main deck
1
-
-
Vacuum toilet system to be overhauled.
1
-
-
Toilet door handle to be provided
1
-
-
New First aid Box to be provided with Medical kit and Medicine.
1
-
-
04 Nos new Mattress, Pillows and Pillow covers to be replaced.
1
-
-
All side window glasses curtain required new fittings.
1
-
-
DRY DOCK REPAIR & MAINTENANCE OF MECHANIZED BOAT RUKHMANI
-
-
-
DECK SIDE/HULL SIDE
Sacrificial Zinc anodes fitted to be under water hull to be renewed
1
-
-
Under Water hull to be cleaned to remove all marine growths, under water hull and appendages sea tube/chest & their gratings also to be cleaned.
1
-
-
Outer hull to be visually examined for repair if any. Repair to carried out as required
1
-
-
Surface cleaning is required to be carried out for entire hull.
1
-
-
Machinery spaces and bilges are to be thoroughly cleaned and internal structure to be examined.
1
-
-
MAIN ENGINE, Make and Types – 2 x Cummins, QSB 6.7 4801D1 Ref No QSB 6.7 4801NT, Power : 473 HP. Both main engine to be dismantled, routine overhauling to be carried out by using spares by OEM authorized suppliers.Engine Srl No. 74238034 (Port) Engine Srl No. 74238043 (STBD)
1
-
-
Fuel filters, lube oil filters to be replaced with new one.
1
-
-
Engine oil required to be changed as per OEM.
1
-
-
Air filter to be replaced with new one.
1
-
-
Coolant to be changed as per OEM.
1
-
-
Sea water pump to be serviced.
1
-
-
All belts to be replaced with new one.
1
-
-
Fresh water pumps to be serviced.
1
-
-
Low Lube oil pressure gauge to be renewed.
1
-
-
All sensors to be calibrated.
1
-
-
Fuel pump to be calibrated.
1
-
-
Injector to be calibrated.
1
-
-
Engine operation instruments to be serviced.
1
-
-
Self-starter to be serviced.
1
-
-
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
PROPULSION UNIT
Shaft (P&S) Propeller (P&S) Rudders to be withdrawn, visual examination and NDT as required to be carried out.
1
-
-
Shaft (P&S), Rudder stock (P&S) bush clearness to be verified and to be renewed.
1
-
-
Complete radar room cleaning & to be painted with FRP flow coat.
1
-
-
DIESEL GENERATOR SET Diesel engines and Alternator to be shown in dismantled condition.
1
-
-
Routine overhaul to be carried out by using spares from OEM authorized suppliers.
1
-
-
On completion of routines/overhaul, safety & operational performance to be carried out.
1
-
-
AIR CONDITIONING SYSTEM
Servicing of AC and ventilation system to be carried out.
1
-
-
SPECIAL EQUIPMENT
Echo sounder require servicing.
1
-
-
GPS require servicing.
1
-
-
Magnetic compass required to be calibrated.
1
-
-
All navigation lights to be checked and if required to be replaced.
1
-
-
ANCHOR
Anchor and anchor chain cable accessories to be cleaned, ranged and gauging to be carried. Defective if any to be renewed.
1
-
-
Anchor shackle found rusted to be renewed.
1
-
-
Anchor capstan motor not working, to be replaced.
1
-
-
PAINTING
Before painting all portion to be cleaning.
Under water portion anti failing paint approx – 45 Sq mtr area a) Safe Guard Universal ES Grey – 1 Coat b) Pen Guard HB Primer – 1 Coat c) Sea Quantum Pro-U, Light Red –1coat d) Sea Quantum Pro-U Dark Red – 1Coat
1
-
-
Upper side all FRP body required to be buffing and polishing to be required. After the polishing required to be below mentioned paint in use to all FRP body upper side except under water portion a) Hardtop XP Ral 6003 b) Hard top XP Ral 7000 c) Hard top XP Ral 7040 d) Pen guard HB Gray
1
-
-
AFT deck and all rounds walk way anti-skid painting
1
-
-
Complete bilge cleaning and painting with FRP flow coat paint
1
-
-
The Mechanized boat name, ID No. BSF emblems and National flag shall on both sides of the hull at superstructure at on appropriate place – 02 Nos
1
-
-
Fibre green awning sheet installed in place of canopy cover
1
-
-
BATTERIES
04 Nos. 12 Volt 25 Plate Batteries required to be replaced.
1
-
-
01 No 12 Volt 13 Plate Battery required to be replaced.
1
-
-
All Batteries terminal to be replaced with new one.
1
-
-
GEAR BOX (PORT SIDE & STBD SIDE)
Both Gear boxes to be overhauled as per OEM recommendations and to be carried out by using spares from OEM authorized suppliers.
1
-
-
All Zink rods to be replaced with new one.
1
-
-
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
SYSTEMS VALVES, PIPE LINES AND MOTORS
Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any. Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any.
1
-
-
On completion, hydro test @ 1.5 times of the working pressure to be carried out.
1
-
-
Line valves to be overhauled and to be hydro tested @ 1.5 times of the working pressure.
1
-
-
Sea chest valves, strainer and overboard discharge valves to be repaired/renewed.
1
-
-
On completion of fitment on board, operational trial to be carried out.
1
-
-
PUMP AND MOTORS
Fire/Bilge pump required to be overhauled/ serviced
1
-
-
Steering pump required to be overhauled/ serviced
1
-
-
Sea water pumps required to be overhauled/ serviced
1
-
-
Fresh water pump required to be overhauled/ serviced
1
-
-
Engine room 02 Nos. Blower motor required to be overhauled/serviced
1
-
-
Discharge flexible hose pipe line turned off, to be replaced.
1
-
-
WHEEL HOUSE
Leakage at wheel house roof through bridge deck.
1
-
-
02 Nos Window wiper motors to be serviced.
1
-
-
01 No Pilot & 04 Nos passengers seat leather cover to be renewed with new one.
1
-
-
Window wiper blade and water sprinklers to be replaced with new one.
1
-
-
Wheel house door handle to be provided.
1
-
-
Wheel house door’s rubber gasket to be renewed.
1
-
-
TANKS
02 Nos Fuel tanks to be cleaned
1
-
-
01 No Fresh water tank to be cleaned.
1
-
-
Fuel tank top plastic cover/cap broken on main deck AFT STBD side, to be replaced.
1
-
-
ELECTRICAL ITEMS
Insulation resistance test (Mugger test) and original equipment manufacture’s (OEM) recommendation for preventive maintenance to be carried out for the following electrical items. a) All electrical machinery including Motors & Transformers. b) Power and lighting circuits. c) Main switch board. d) Fire control panel.
1
-
-
Emergency light not working
1
-
-
06 Nos Bunk fans required to be new fitted.
1
-
-
Search light not working.
1
-
-
FIRE FIGHTING/SAFETY EQUIPMENT’S
Guard frame to be replaced.
1
-
-
Servicing of DD Fire pump to be carried out.
1
-
-
All fire extinguishers required refilling.
1
-
-
All smoke detector and fire detector system required to be replaced with new one.
1
-
-
Engine room fire sensors to be checked.
1
-
-
Starting rope assembly for DD fire pumps to be replaced.
1
-
-
DD Fire pump flexible hose to be replaced.
1
-
-
LIVE SAVING APPLIANCES /FCP ITEMS
02 Nos Life rafts to be provided on board.
1
-
-
04 Nos Life Buoys found defective to be replaced.
1
-
-
Liner rope of Life Buoy to be changed.
1
-
-
All FCP items to be overhauled.
1
-
-
FENDER
04 Nos Portable Pneumatic fender to be replaced with new one.
1
-
-
OTHER
Vacuum toilet system to be overhauled
1
-
-
New First aid Box to be provided with Medical kit and Medicine.
1
-
-
04 Nos new Mattress, Pillows and Pillow covers to be replaced.
1
-
-
All side window glasses curtain required new fittings.
1
-
-
Cabin lights to be replaced.
1
-
-
Aft deck canopy to be replaced
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements