Border Security Force Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 3,00,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_BSF_820877_1Tender No
1597-99Tender Authority
Border Security Force ViewPurchaser Address
-Website
http://http://bsf.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Machinery spaces and bilges are to be thoroughly cleaned and internal structure to be examined.
1
-
-
... More
MAIN ENGINE, Make and Types – 2 x Cummins, QSB 6.7 4801D1 Ref No QSB 6.7 4801NT, Power : 473 HP. Both main engine to be dismantled, routine overhauling to be carried out by using spares by OEM authorized suppliers.Engine Srl No. 74238015 (Port) Run Hrs 466.30 Engine Srl No. 74238022 (STBD)
1
-
-
... More
Fuel filters, lube oil filters to be replaced with new one.
1
-
-
... More
Engine oil required to be changed as per OEM.
1
-
-
... More
Air filter to be replaced with new one.
1
-
-
... More
Coolant to be changed as per OEM.
1
-
-
... More
Sea water pump to be serviced.
1
-
-
... More
All belts to be replaced with new one.
1
-
-
... More
Fresh water pumps to be serviced.
1
-
-
... More
Low Lube oil pressure gauge to be renewed.
1
-
-
... More
All sensors to be calibrated.
1
-
-
... More
Fuel pump to be calibrated.
1
-
-
... More
Injector to be calibrated.
1
-
-
... More
Engine operation instruments to be serviced.
1
-
-
... More
Self-starter to be serviced.
1
-
-
... More
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
... More
PROPULSION UNIT
Shaft (P&S) Propeller (P&S) Rudders to be withdrawn, visual examination and NDT as required to be carried out.
1
-
-
... More
Shaft (P&S), Rudder stock (P&S) bush clearness to be verified and to be renewed.
1
-
-
... More
Complete radar room cleaning & to be painted with FRP flow coat.
1
-
-
... More
DIESEL GENERATOR SET
Routines/overhaul to be carried out by using spares from OEM authorized suppliers.
1
-
-
... More
Diesel engines and Alternator to be shown in dismantled condition
1
-
-
... More
DG fuel pump to be overhauled/replaced.
1
-
-
... More
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
... More
AIR CONDITIONING SYSTEM
Servicing of AC and ventilation system to be carried out.
1
-
-
... More
AC discharge water leakage into Wheel house to be repaired.
1
-
-
... More
SPECIAL EQUIPMENT
Echo sounder require servicing.
1
-
-
... More
GPS not working require repairing.
1
-
-
... More
Magnetic compass required to be calibrated.
1
-
-
... More
STBD side search light not working.
1
-
-
... More
All navigation lights to be checked and if required to be replaced.
1
-
-
... More
ANCHOR
Anchor and anchor chain cable accessories to be cleaned, ranged and gauging to be carried. Defective if any to be renewed.
1
-
-
... More
Anchor capstan motor not working, to be replaced/ repaired.
1
-
-
... More
PAINTING
Before painting all portion to be cleaning.
Under water portion anti failing paint approx – 45 Sq mtr area a) Safe Guard Universal ES Grey – 1 Coat b) Pen Guard HB Primer – 1 Coat c) Sea Quantum Pro-U, Light Red –1coat d) Sea Quantum Pro-U Dark Red – 1Coat
1
-
-
... More
Upper side all FRP body required to be buffing and polishing to be required. After the polishing required to be below mentioned paint in use to all FRP body upper side except under water portion a) Hardtop XP Ral 6003 b) Hard top XP Ral 7000 c) Hard top XP Ral 7040 d) Pen guard HB Gray
1
-
-
... More
AFT deck and all rounds walk way anti-skid painting
1
-
-
... More
Complete bilge cleaning and painting with FRP flow coat paint
1
-
-
... More
The Mechanized boat name, ID No. BSF emblems and National flag shall on both sides of the hull at superstructure at on appropriate place – 02 Nos
1
-
-
... More
Fibre green awning sheet installed in place of canopy cover
1
-
-
... More
BATTERIES
04 Nos. 12 Volt 25 Plate Batteries required to be replaced.
1
-
-
... More
01 No 12 Volt 13 Plate Battery required to be replaced.
1
-
-
... More
All Batteries terminal to be replaced with new one.
1
-
-
... More
GEAR BOX (PORT SIDE & STBD SIDE)
Both Gear boxes to be overhauled as per OEM recommendations and to be carried out by using spares from OEM authorized suppliers.
1
-
-
... More
All Zink rods to be replaced with new one.
1
-
-
... More
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
... More
SYSTEMS VALVES, PIPE LINES AND MOTORS
Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any. Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any.
1
-
-
... More
On completion, hydro test @ 1.5 times of the working pressure to be carried out.
1
-
-
... More
Line valves to be overhauled and to be hydro tested @ 1.5 times of the working pressure.
1
-
-
... More
Sea chest valves, strainer and overboard discharge valves to be repaired/renewed.
1
-
-
... More
On completion of fitment on board, operational trial to be carried out.
1
-
-
... More
PUMP AND MOTORS
Fire/Bilge pump required to be overhauled/ serviced
1
-
-
... More
Steering pump required to be overhauled/ serviced
1
-
-
... More
Sea water pumps required to be overhauled/ serviced
1
-
-
... More
Fresh water pump required to be overhauled/ serviced
1
-
-
... More
Engine room 02 Nos. Blower motor required to be overhauled/serviced
1
-
-
... More
WHEEL HOUSE
Leakage at wheel house roof through bridge deck.
1
-
-
... More
02 Nos Window wiper motors to be serviced.
1
-
-
... More
01 No Pilot & 04 Nos passengers seat leather cover to be renewed with new one.
1
-
-
... More
Window wiper blade and water sprinklers to be replaced with new one.
1
-
-
... More
Wheel house door handle to be provided.
1
-
-
... More
Wheel house door’s rubber gasket to be renewed.
1
-
-
... More
TANKS
02 Nos Fuel tanks to be cleaned
1
-
-
... More
01 No Fresh water tank to be cleaned.
1
-
-
... More
Fuel tank top plastic cover/cap broken on main deck AFT STBD side, to be replaced.
1
-
-
... More
ELECTRICAL ITEMS
Insulation resistance test (Mugger test) and original equipment manufacture’s (OEM) recommendation for preventive maintenance to be carried out for the following electrical items. a) All electrical machinery including Motors & Transformers. b) Power and lighting circuits. c) Main switch board. d) Fire control panel.
1
-
-
... More
Emergency light not working
1
-
-
... More
06 Nos Bunk fans required to be new fitted.
1
-
-
... More
FIRE FIGHTING/SAFETY EQUIPMENT’S
Suction pipe line of DD fire pump to be provided newly.
1
-
-
... More
New starting rope of DD fire pump to be provided.
1
-
-
... More
Servicing of DD Fire pump to be carried out.
1
-
-
... More
All fire extinguishers required refilling.
1
-
-
... More
All smoke detector and fire detector system required to be replaced with new one.
1
-
-
... More
Engine room fire sensors to be checked.
1
-
-
... More
New Box required for keeping Hose pipe of DD fire pump.
1
-
-
... More
The fire hose found leaking water which is fitted with main deck, required replaced.
1
-
-
... More
LIVE SAVING APPLIANCES /FCP ITEMS
02 Nos Life rafts to be provided on board.
1
-
-
... More
Liner rope of Life Buoy to be changed.
1
-
-
... More
All LSA/FCP items to be overhauled to be replaced with one. (Expired items).
1
-
-
... More
FENDER
D’ shape Rubber fender at AFT STBD side damaged, to be renewed.
1
-
-
... More
04 Nos Portable Pneumatic fender to be replaced with new one.
1
-
-
... More
OTHER
Leakage into engine room through soft patch area from main deck
1
-
-
... More
Vacuum toilet system to be overhauled.
1
-
-
... More
Toilet door handle to be provided
1
-
-
... More
New First aid Box to be provided with Medical kit and Medicine.
1
-
-
... More
04 Nos new Mattress, Pillows and Pillow covers to be replaced.
1
-
-
... More
All side window glasses curtain required new fittings.
1
-
-
... More
DRY DOCK REPAIR & MAINTENANCE OF MECHANIZED BOAT RUKHMANI
-
-
-
... More
DECK SIDE/HULL SIDE
Sacrificial Zinc anodes fitted to be under water hull to be renewed
1
-
-
... More
Under Water hull to be cleaned to remove all marine growths, under water hull and appendages sea tube/chest & their gratings also to be cleaned.
1
-
-
... More
Outer hull to be visually examined for repair if any. Repair to carried out as required
1
-
-
... More
Surface cleaning is required to be carried out for entire hull.
1
-
-
... More
Machinery spaces and bilges are to be thoroughly cleaned and internal structure to be examined.
1
-
-
... More
MAIN ENGINE, Make and Types – 2 x Cummins, QSB 6.7 4801D1 Ref No QSB 6.7 4801NT, Power : 473 HP. Both main engine to be dismantled, routine overhauling to be carried out by using spares by OEM authorized suppliers.Engine Srl No. 74238034 (Port) Engine Srl No. 74238043 (STBD)
1
-
-
... More
Fuel filters, lube oil filters to be replaced with new one.
1
-
-
... More
Engine oil required to be changed as per OEM.
1
-
-
... More
Air filter to be replaced with new one.
1
-
-
... More
Coolant to be changed as per OEM.
1
-
-
... More
Sea water pump to be serviced.
1
-
-
... More
All belts to be replaced with new one.
1
-
-
... More
Fresh water pumps to be serviced.
1
-
-
... More
Low Lube oil pressure gauge to be renewed.
1
-
-
... More
All sensors to be calibrated.
1
-
-
... More
Fuel pump to be calibrated.
1
-
-
... More
Injector to be calibrated.
1
-
-
... More
Engine operation instruments to be serviced.
1
-
-
... More
Self-starter to be serviced.
1
-
-
... More
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
... More
PROPULSION UNIT
Shaft (P&S) Propeller (P&S) Rudders to be withdrawn, visual examination and NDT as required to be carried out.
1
-
-
... More
Shaft (P&S), Rudder stock (P&S) bush clearness to be verified and to be renewed.
1
-
-
... More
Complete radar room cleaning & to be painted with FRP flow coat.
1
-
-
... More
DIESEL GENERATOR SET Diesel engines and Alternator to be shown in dismantled condition.
1
-
-
... More
Routine overhaul to be carried out by using spares from OEM authorized suppliers.
1
-
-
... More
On completion of routines/overhaul, safety & operational performance to be carried out.
1
-
-
... More
AIR CONDITIONING SYSTEM
Servicing of AC and ventilation system to be carried out.
1
-
-
... More
SPECIAL EQUIPMENT
Echo sounder require servicing.
1
-
-
... More
GPS require servicing.
1
-
-
... More
Magnetic compass required to be calibrated.
1
-
-
... More
All navigation lights to be checked and if required to be replaced.
1
-
-
... More
ANCHOR
Anchor and anchor chain cable accessories to be cleaned, ranged and gauging to be carried. Defective if any to be renewed.
1
-
-
... More
Anchor shackle found rusted to be renewed.
1
-
-
... More
Anchor capstan motor not working, to be replaced.
1
-
-
... More
PAINTING
Before painting all portion to be cleaning.
Under water portion anti failing paint approx – 45 Sq mtr area a) Safe Guard Universal ES Grey – 1 Coat b) Pen Guard HB Primer – 1 Coat c) Sea Quantum Pro-U, Light Red –1coat d) Sea Quantum Pro-U Dark Red – 1Coat
1
-
-
... More
Upper side all FRP body required to be buffing and polishing to be required. After the polishing required to be below mentioned paint in use to all FRP body upper side except under water portion a) Hardtop XP Ral 6003 b) Hard top XP Ral 7000 c) Hard top XP Ral 7040 d) Pen guard HB Gray
1
-
-
... More
AFT deck and all rounds walk way anti-skid painting
1
-
-
... More
Complete bilge cleaning and painting with FRP flow coat paint
1
-
-
... More
The Mechanized boat name, ID No. BSF emblems and National flag shall on both sides of the hull at superstructure at on appropriate place – 02 Nos
1
-
-
... More
Fibre green awning sheet installed in place of canopy cover
1
-
-
... More
BATTERIES
04 Nos. 12 Volt 25 Plate Batteries required to be replaced.
1
-
-
... More
01 No 12 Volt 13 Plate Battery required to be replaced.
1
-
-
... More
All Batteries terminal to be replaced with new one.
1
-
-
... More
GEAR BOX (PORT SIDE & STBD SIDE)
Both Gear boxes to be overhauled as per OEM recommendations and to be carried out by using spares from OEM authorized suppliers.
1
-
-
... More
All Zink rods to be replaced with new one.
1
-
-
... More
On completion of Routine/Overhaul, safety and operational/ performance trial to be shown.
1
-
-
... More
SYSTEMS VALVES, PIPE LINES AND MOTORS
Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any. Fire main line, Bilge system line, sea water line, Hydraulic line, Toilet line to be repaired/ renewed if any.
1
-
-
... More
On completion, hydro test @ 1.5 times of the working pressure to be carried out.
1
-
-
... More
Line valves to be overhauled and to be hydro tested @ 1.5 times of the working pressure.
1
-
-
... More
Sea chest valves, strainer and overboard discharge valves to be repaired/renewed.
1
-
-
... More
On completion of fitment on board, operational trial to be carried out.
1
-
-
... More
PUMP AND MOTORS
Fire/Bilge pump required to be overhauled/ serviced
1
-
-
... More
Steering pump required to be overhauled/ serviced
1
-
-
... More
Sea water pumps required to be overhauled/ serviced
1
-
-
... More
Fresh water pump required to be overhauled/ serviced
1
-
-
... More
Engine room 02 Nos. Blower motor required to be overhauled/serviced
1
-
-
... More
Discharge flexible hose pipe line turned off, to be replaced.
1
-
-
... More
WHEEL HOUSE
Leakage at wheel house roof through bridge deck.
1
-
-
... More
02 Nos Window wiper motors to be serviced.
1
-
-
... More
01 No Pilot & 04 Nos passengers seat leather cover to be renewed with new one.
1
-
-
... More
Window wiper blade and water sprinklers to be replaced with new one.
1
-
-
... More
Wheel house door handle to be provided.
1
-
-
... More
Wheel house door’s rubber gasket to be renewed.
1
-
-
... More
TANKS
02 Nos Fuel tanks to be cleaned
1
-
-
... More
01 No Fresh water tank to be cleaned.
1
-
-
... More
Fuel tank top plastic cover/cap broken on main deck AFT STBD side, to be replaced.
1
-
-
... More
ELECTRICAL ITEMS
Insulation resistance test (Mugger test) and original equipment manufacture’s (OEM) recommendation for preventive maintenance to be carried out for the following electrical items. a) All electrical machinery including Motors & Transformers. b) Power and lighting circuits. c) Main switch board. d) Fire control panel.
1
-
-
... More
Emergency light not working
1
-
-
... More
06 Nos Bunk fans required to be new fitted.
1
-
-
... More
Search light not working.
1
-
-
... More
FIRE FIGHTING/SAFETY EQUIPMENT’S
Guard frame to be replaced.
1
-
-
... More
Servicing of DD Fire pump to be carried out.
1
-
-
... More
All fire extinguishers required refilling.
1
-
-
... More
All smoke detector and fire detector system required to be replaced with new one.
1
-
-
... More
Engine room fire sensors to be checked.
1
-
-
... More
Starting rope assembly for DD fire pumps to be replaced.
1
-
-
... More
DD Fire pump flexible hose to be replaced.
1
-
-
... More
LIVE SAVING APPLIANCES /FCP ITEMS
02 Nos Life rafts to be provided on board.
1
-
-
... More
04 Nos Life Buoys found defective to be replaced.
1
-
-
... More
Liner rope of Life Buoy to be changed.
1
-
-
... More
All FCP items to be overhauled.
1
-
-
... More
FENDER
04 Nos Portable Pneumatic fender to be replaced with new one.
1
-
-
... More
OTHER
Vacuum toilet system to be overhauled
1
-
-
... More
New First aid Box to be provided with Medical kit and Medicine.
1
-
-
... More
04 Nos new Mattress, Pillows and Pillow covers to be replaced.
1
-
-
... More
All side window glasses curtain required new fittings.
1
-
-
... More
Cabin lights to be replaced.
1
-
-
... More
Aft deck canopy to be replaced
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements