BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 40,731Document Cost
Refer DocumentsTender Fee
Refer Documents
Summary
Construction of Brick Drain including Hume Pipe Culvert at bye lane of Rakhal Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2018_BoTC_7632_1Bid Award Id
ViewTender No
UTC/BTC/E-Tender/07Tender Authority
Bodoland Territorial Council ViewPurchaser Address
-Website
http://https://www.bodoland.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Supplying, fitting and fixing in position reinforcement bars conforming to relevent I.S. code for RCC work/ R.B. walling incliding staitening, cleaning, cutting and bending to proper shape and length as per details, supplyingh and binding with 20 g enailed black wire and placing in position with proper blocks, supports, chairs, spacers etc, complete (No extra measurement for left, hook, chair, anchor etc will be entertained in the measurement as they are included in the rate) (Up to 1st floor level) Post
6.39
-
-
... More
Stiup
2.1
-
-
... More
Providing form work of ordinary tember planking so as to keep a rough finished including centering, shuttering, strutting and proping etc. height of proping and centering below supporting floor to ceilling not exceeding 400 m and removal of the same for in-situ reinforced conctrete and plain concrete work in .
204.66
-
-
... More
Providing and laying plain/ reinforced cement concrete works cement, coarse sand and 20mm down graded stone aggregate including dewatering in necessary,and curing complete but excluding cost of form work and reinforcement for reinforced cement concrete work (Form work and reinforcement will be measured and paid separately) (A) In sub-structure up to plinthlevel)
8.26
-
-
... More
Brick masonry work in !:3 in sub-structure complete excluding pointing and plastering as per drawing and technical specifications
192.63
-
-
... More
Plastering with cement morter (1:3) on brick work in sub-structure as per technical specification
1066
-
-
... More
Providing precast RCC slab over drain, septic tank etc in prop. 1:2:4 reinforced with 10mm M.S. bar 150 mm centre both ways tying with 20 gauge black annealedd wire with necessary shuttering, curing etc complete including fixing in positioncuring etc complete including fixing in position as directed
18
-
-
... More
Construction of Hume Pipe Culvert (90 cm dia)- Excavation for structures (Earth work in excavation for foundationof structures as per drawing and technical specification, including setting out, construction shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavated earth to the extent required and utilizing theremaining earth locally for road work) Ordinary soil
3.93
-
-
... More
PCC 1:3:6 in foundation (Plain cement concrete 1"3:6 mix crushed stone aggregate 40mm nominal size mechanically mixed, placed foundation and compacted by vibration including curing for 14 days)
1.77
-
-
... More
Labour for laying reinforced cement concrete pipe NP4/NP3/prestressed concrete pipe for culverts on 1st class bedding of granullar material/cc M-15 in single row including fixing coller with cement morter 1:2, and cost of grannular bedding but excluding excavation, protection works, backfilling, concrete and masonry work in headwall and parapet, cost of pipe and cost od CC bedding (i) With 1st xlass bedding of grannular material
7.5
-
-
... More
Cost of Hume pipe Culver (90 cm dia)
3
-
-
... More
Plain/reinforced cement concrete, in sub-structures complete as per drawing and technical specificationcomplete as per drawing and technical specification and steel shuttering formwork- B. PCC Grade M20
9.71
-
-