Assam Power Generation Corporation Limited Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Assam Power Generation Corporation Limited - APGCL Tender

Works
Aerospace and Defence
Eprocure
Opening Date12 Jul 2023
Closing Date21 Sep 2023
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Supply, Installation, Testing And Commissioning Of Field Instruments And Equipment For Upgradation Of Existing Pneumatic Control Loop

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Armoured Control Cable with glands at termination: Technical Requirement: • 4 core, 2 pair: • Laying required from control room to field junction box.

2200

-

-

... More
Armoured Control Cable with glands at termination: Technical Requirement: • 3 core, 2 pair: • Laying required from field junction box to Pressure Transmitter & Positioner.

500

-

-

... More
Smart E/P Positioner with external I/P: (For operation in Natural Gas)

6

-

-

... More
New mounting Brackets for the new positioners offered:

6

-

-

... More
Flame proof junction box with terminal block for establishing connections between the Controllers, Pressure Transmitters and Positioners with Flame Proof Enclosure - Type “d” (Ex d) for Class I Division 1 Zone 0 operation with NEMA & NEC TYPE 3.

4

-

-

... More
Delay Timer: Technical Requirement: • Time Delay: 0-10 sec (adjustable). • Flame Proof Enclosure: Type “d”(Ex d) for Class I division 1 Zone 0 operation.

2

-

-

... More
Solenoid Valve having Flame Proof Enclosures - Type “d”(Ex d) for Class I Division 1 Zone 0 operation.

2

-

-

... More
SS tubes and fittings of suitable size for connecting Pressure transmitters, Positioners, Pressure Regulator with moisture drain, Pressure Control Valves, etc. (Required for 2 nos. of Gas Compressors Discharge PCVs and 4 nos. of Suction PCVs.)

1

-

-

... More
Pressure Regulator with drain facility:

6

-

-

... More
Communication Cable from Controllers to the Desktop PC based HMI, RS485/232 converters etc.:

1

-

-

... More
HMI: Technical Requirement: • Desktop PC based to control and monitoring the Pressure Control Valves. • Monitor: 24 inch, Full HD desktop monitor, 75 or above refresh rate,1920 x 1080 pixels. • Processor: Intel corei7,13 Gen intel core processor. System type: 64 bit based processor. • Installed RAM: 16 GB. • Operating system Window 10 Pro. • HMI software should display and supervisory control the following: i. 2nd stage gas discharge pressure of gas compressors and 1st stage gas suction pressures. ii. Pressure control valve opening/close position. iii. Historical trends of all HMI data should be stored for at least 30 days. Note: Pressure Control Valves should be controlled from PID Controller’s manual and auto set points as well as from the HMI desktop computer.

1

-

-

... More
Panel for mounting controllers, power supply modules, MCB breaker with cooling fan etc.

1

-

-

... More
MCB with suitable amps rating for power supply.

2

-

-

... More
Instrument Earthing Kit for earthing of Controllers, Pressure Transmitters and Positioners.

1

-

-

... More
2 core Power cable (Armoured) for power supply of Controller:

200

-

-

... More
Needle valves 1/2":

6

-

-

... More
Needle valves 1/4"

6

-

-

... More
Service Charge for Erection, Installation, Testing & Commissioning of Controllers, equipment, instruments etc. for successful and corrected operation of the 06 nos. pressure control valves of LTPS using the new supplied system. Integration of all the supplied controllers along with the existing controller of Gas Compressor no. 6 into a single system, to be controlled and monitored using Desktop PC based HMI.

1

-

-

... More
P&F Charges against Items under Sl. No. 1 to 20.

1

-

-

... More
Freight against Items under Sl. No. 1 to 20 Note: Freight bill to be submitted with final bill.

1

-

-

... More
Transit Insurance against items under Sl. No. 1 to 20 Note: Insurance bill to be submitted with final bill.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.