Assam Inland Water Transport Development Society Tender

BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.

Assam Inland Water Transport Development Society - AIWTDS Tender

Eprocure
Opening Date11 Aug 2021
Closing Date15 Dec 2021
Tender Amount₹ 2,89,45,00,000 
This is an estimated amount, exact amount may vary.
Notes
Download

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
Report Missing Document

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Bankseat Bankseat including mobilization and demobilization and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all aspects.

1

-

-

... More
Dolphins for Intermediate Pontoons Dolphins for Intermediate pontoons including mobilization and demobilization and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all aspects.

1

-

-

... More
Dolphins for Berthing Pontoons Dolphins for Berthing pontoons including mobilization and demobilization and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all aspects.

1

-

-

... More
Link Spans Procure, supply, fabricate, install & commissioning of Pontoon with structural steel work welded in built up sections, framed work including cutting, hoisting and fixing in positions and applying paint (as per paint specifications) including drilling holes, fitting and fixing with bolts and nuts or welding, as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.

1

-

-

... More
Berthing Pontoons Procure, supply, fabricate, install & commissioning of Pontoon with structural steel work welded in built up sections, framed work including cutting, hoisting and fixing in positions and applying paint (as per paint specifications) including drilling holes, fitting and fixing with bolts and nuts or welding, as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.

1

-

-

... More
Intermediate Pontoons Procure, supply, fabricate, install & commissioning of Pontoon with structural steel work welded in built up sections, framed work including cutting, hoisting and fixing in positions and applying paint (as per paint specifications) including drilling holes, fitting and fixing with bolts and nuts or welding, as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.

1

-

-

... More
Design Fee

1

-

-

... More
BILL NO. 3-Engineering, Procurement of Materials and Construction of Terminal Building

-

-

-

... More
Terminal Buildings and Ancillary services Building works including mobilization & demobilization of equipment, foundations (Cast-in-situ RCC bored piles) for superstructure of deck size 56.625m x 33.085m / 29.065m, control building, sheds, ready to use as per approved designs, drawings and specifications including testing, inspection and defect rectifications, complete in all respects.

1

-

-

... More
Design Fee

1

-

-

... More
BILL NO. 4-Engineering, Procurement of Materials and Construction of Landscaping

-

-

-

... More
Landscaping Landscaping including mobilization & de- mobilization, lawn making, planting, etc. and ready to use as per approved designs, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects..

1

-

-

... More
BILL NO. 5-Engineering, Procurement of Materials & Construction of Electrical Works

-

-

-

... More
Electrical Works All electrical works including mobilization & de-mobilization, installation of transformers, feeders, cables, earthing, lighting, etc. and ready to use as per approved designs, drawings and specifications including testing, inspection, commissioning and defect rectifications, complete in all respects. This also includes installation, commissioning and testing of solar power panels and back up as necessary, all complete.

1

-

-

... More
BILL NO. 6-Engineering, Procurement of Materials & Construction of Water Supply, Sewerage and Drainage Works

-

-

-

... More
Water Supply, Sewerage and Drainage All Water supply works including mobilization & de-mobilization, Water Treatment Plant, Storm water drainage, Irrigation network and ready to use as per approved designs, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects

1

-

-

... More
BILL NO. 7- Engineering, Procurement of Materials & Construction of Plumbing Works

-

-

-

... More
Plumbing Works Plumbing works in the terminal including mobilization and demobilization ready to use as per approved design, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects..

1

-

-

... More
BILL NO. 8-Engineering, Procurement of Materials & Construction of firefighting system

-

-

-

... More
Firefighting System Works Firefighting system works in the terminal including mobilization and demobilization ready to use as per approved design, drawings and specifications including inspection, commissioning and defect rectifications, complete in all respects..

1

-

-

... More
BILL NO. 9-Environmental Management Plan (EMP)

-

-

-

... More
All technical support needed to implement the EMP, and fulfil statutory environmental compliance requirements including monitoring and reporting

1

-

-

... More
Plantation and management of flora as per the EMP

1

-

-

... More
All precautionary measures to mitigate impacts on aquatic life as per the EMP

1

-

-

... More
Construction of soak pits at construction sites & labour camps, Per site estimated Provision of clean drinking & domestic water facility at labour camps and construction site Per month

1

-

-

... More
Health checkup camps for construction workers All other Environment, Health and Safety provisions and implementation of the Environmental health and Safety Systems during construction as per EMP As per standards and frequency described in the EMP Sufficient to comply with applicable regulations and the EMP

1

-

-

... More
Terrestrial and Aquatic Fauna Per season(Once in six month)

1

-

-

... More
Ambient Air Quality Per monitoringfor 24 months (Once in two month)

1

-

-

... More
Surface Water Quality For upstream & downstream (Once in month)

1

-

-

... More
Drinking Water Quality Once in month

1

-

-

... More
Noise & Vibration Per monitoring for 24 months (Once in month)

1

-

-

... More
Soil Quality, Erosion & Siltation and Riverbed Sediment Per Six months

1

-

-

... More
All other items of the EMP,the Contractors EMP oritems needed forcompliance oftheapplicable regulations as described in the EMP(Unless specifically quoted, these will be deemed to be included in the Bid Price).

1

-

-

... More
BILL NO. 10- Duties and Taxes

-

-

-

... More
*Duties andTaxes including Goods and Service

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.