BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 43,000Document Cost
₹ 1,000Tender Fee
Refer Documents
Summary
Erection Of Tower By Dismantling The Existing Tower Location No 37 Of 132kv Lilo Balipara-sonabil D/c Line With Construction Of New Foundation Along With Stringing Of Conductor From Loc. No. 34 To 38.
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AEGCL_38910_1Bid Award Id
ViewTender No
DGM/TTC/TEZ/T-20/2024-25/250Tender Authority
Assam Electricity Grid Corporation Limited ViewPurchaser Address
-Website
http://https://www.aegcl.co.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying M25grade concrete of specified 28 days strength for pile head, tie beam, chimney including reinforcement steel, form work, scafolding for all level as per site necessarry matrilas and equipment, transportations, batching, mixing, vibration, dewatering etc as per approved drawing and direction.
18.94
-
-
... More
Conducting pile integrity test on piles using electronic controlunit hand held hammer, accelerometer , computer withrequired software to asses as installed pile characteristics including mobilasation of necessarry manpower, equipment materials etc required for successful completio of the job.
4
-
-
... More
Annexure-II (Supply)
-
-
-
... More
Supply of compression type tension clamp including hardware fitting suitable for ACSR panther conductor.
6
-
-
... More
ANNEXURE-III (Erection work)
-
-
-
... More
Erection of Superstructure
6
-
-
... More
Stringing power Conductor from loc 34-38 including transportation, distribution, laying, stringing, tensioning, clamping, jumpering etc complete with all fittings per route KM of line. ( 6 Conductor per route KM of line)
6.3
-
-
... More
Stringing of OPGW incuding laying, stringing, tensioning, clamping, jumpering ete complete with all fittings per route KM of line (Stringing of ground wire required in Two span)
0.6
-
-
... More
Shifting of Conductor from Sonabil GSS to Work Site & vice versa.
25
-
-
... More
Earthing of the tower including supply of all earthing materials (per tower)
1
-
-
... More
Welding of nuts & bolts (Per tower)
1
-
-
... More
ANNEXURE-IV ( Dismantling work)
-
-
-
... More
Dismantlling of OPGW ground wire from the portion of the line to be dismantled (Required in Two span 36-37-38)
0.6
-
-
... More
Dismantling of the complete tower loc 37 without damaging the member and stake at site as per superstructure size and marking
6
-
-