Airports Authority Of India Tender
BidAssist is a very user-friendly website which helps in finding the specific Assam e-tender that one is looking for. For getting any information or detail about any e-tender the Assam government must have posted, BidAssist is designed in such a manner so as to provide information on all government tenders in one place without any inconvenience.
Costs
EMD
₹ 3,32,280Document Cost
₹ 1,180Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_AAI_201211_2Bid Award Id
ViewTender No
AAI/DIB/ENGG(E)/NIT-02/2024-25Tender Authority
Airports Authority Of India ViewPurchaser Address
-Website
http://https://www.aai.aero/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Meters (Incoming) : a) Digital type Ammeter of Required range with selector switch & Current Transformers. (b) Digital type Voltmeter with selector switch and protection MCB.
MOV & switch : Necessary Surge protection System (block 70KA minimum with Neutral protection) shall be provided at control panel of conveyor with incomer switch.
Outgoing for Motors (s) : 1) MPCB of suitable current rating & breaking capacity of 10 KA for each motor. 2) Soft Starter for conveyor motor.
Outgoing for rolling shutter : i) 2 Pole MPCB of 10 KA & suitable current rating for each shutter motor. Ii) Interlocking with conveyor & limit switches / sensors. iii) Auto-manual switches, separate push button for UP /DOWN motion
Emergency stop : Provision shall be made in panel & at three other locations for each
2
-
-
Draught Curtain
SITC of draught curtain cover for the opening of conveyer belt, of sutiable size fabricated with 3mm thick Nylon Rubber flaps, to be fixed by SS flat strip as per size of shutter opening etc. the opening size shall be as per dimensions /drawings approved by engg.-incharge, complete as required (For Arrival )
4
-
-
Rolling Shutter
SITC of electrically operated rolling shutter with arrangement for auto and manual operation to suit to the opening in wall fabricated MS provided with suitable rated tubular geared single phase motor directly coupled to the shaft of the shutter, limit switch or sensor interlock with coveyor starter, complete with guide channels , wiring, earthing, painting etc. as required for the successful operation of the shutter for minimum opening size 1.5mtr (L) x 1.35mtr (W) .
(For Arrival - 02 Nos)
4
-
-
Dismantling and Shifting of existing Arrival Conveyor System (02 Nos.) including its Control Panel, Rolling Shutters etc. to nearest AAI's store.
1
-
-
AICMC FOR THIRTEEN YEARS (AFTER 2 YEARS DLP)
-
-
-
All inclusive comprehensive maintenance of the entire Baggage Handling Systems as covered under the capital works including all spares, consumables, manpower etc. including providing preventive quarterly Inspection, Repair, Maintenance,Tracking, Alignment, Replacement of unserviceable components, Greasing, Oiling, Toppling up of gear oil in gear reducer, Rolling Shutter, Cleaning and all other associated comprehensive maintenance job as per maintenance schedule and recomendation of OEM on complete Baggage Handling System as provided under SH-I to keep the system under serviceable condition all the time including attending any numbers of breakdown faults as and when required.
-
-
-
For 3rd Year (First Year After DLP)
1
-
-
For 4th Year (Second Year After DLP)
1
-
-
For 5th Year (Third Year After DLP)
1
-
-
For 6th Year (Fourth Year After DLP)
1
-
-
For 7th Year (Fifth Year After DLP)
1
-
-
For 8th Year (Sixth Year After DLP)
1
-
-
For 9th Year (Seventh Year After DLP)
1
-
-
For 10th Year (Eighth Year After DLP)
1
-
-
For 11th Year (Nineth Year After DLP)
1
-
-
For 12th Year (Tenth Year After DLP)
1
-
-
For 13th Year (Eleventh Year After DLP)
1
-
-
For 14th Year (Twelfth Year After DLP)
1
-
-
For 15th Year (Thirteenth Year After DLP)
1
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements