Urban Development And Housing Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Urban Development And Housing Department - UDHD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Mar 2024
Closing Date11 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Summary

Construction Of Approach Road For Swm Landfill Site At Jairampur Township Sh Slip Clearance Rrm Recarpeting Boundary Wall And R-wall

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Random Rubble Masonry

248

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. Granular material

40

-

-

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications

285

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

50

-

-

... More
Carriage of materials by mechanical transport including loading, unloading from the nearest source to site of work.

1

-

-

... More
RECARPETING

-

-

-

... More
Granular Sub-Base with Close Graded Material ( Table:- 400- 1) Plant Mix Method (Construction of granular sub-base by providing closed graded material, mixing in mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401). (A)for grading- I Material

99

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means (Depth upto 3 m)

82

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

41

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. PCC Grade M15

70

-

-

... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in- Charge. 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.

1307

-

-

... More
Carriage of materials by mechanical transport including loading, unloading from the nearest source to site of work.

1

-

-

... More
BOUNDARY WALL

-

-

-

... More
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.

141

-

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

19

-

-

... More
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 2 coarse sand : 4 stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in : a) Foundations and plinth

14

-

-

... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size)

11

-

-

... More
Reinforcement cement concrete work in columns, pillars,post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size)

16

-

-

... More
Reinforced cement concrete work in lintels, beams and bresumers up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but excluding cost of centering, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size)

19

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete.

88

-

-

... More
b) Column, pillars, posts and struts etc.

216

-

-

... More
c) Lintels, beams, girders, bressumers and cantilevers etc

115

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete. a) Tar/ TMT steel

3137

-

-

... More
Half brick masonry (with best available local bricks) in cement mortar 1:4 (1 cement : 4 coarse sand) in foundation and plinth.

261

-

-

... More
Extra for half brick masonry in superstructure above plinth level and up to floor two level.

261

-

-

... More
Providing and fixing MS grills of required pattern in wooden frames of windows etc with MS flat, square or round bars with round headed bolts and nuts or by screws. a) Plain grill.

1555

-

-

... More
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).

429

-

-

... More
Colour washing such as green, blue or buff on new work (two or more coats) including a base coat of white washing with lime to give an even shade.

612

-

-

... More
Carriage of materials by mechanical transport including loading, unloading from the nearest source to site of work.

1

-

-

... More
MS GATE

-

-

-

... More
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.

10

-

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

2

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete.

8

-

-

... More
b) Column, pillars, posts and struts etc.

13

-

-

... More
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in : a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size)

2

-

-

... More
Reinforcement cement concrete work in columns, pillars,post and struts etc up to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface but exluding cost of centring, shuttering and reinforcement. a) M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size)

2

-

-

... More
Providing and laying up to floor two level RCC string courses, coping bed plates, anchor blocks, plain window sills and the like including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface including centering and shuttering etc but excluding cost of reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 mm nominal size).

1

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete. a) Tar/ TMT steel

322

-

-

... More
Brick work with best available local bricks in foundations and plinth in cement mortar 1:4 (1 cement : 4 fine sand).

1

-

-

... More
Extra for brick work with best available local bricks in superstructure above plinth level up to floor two level.

1

-

-

... More
Steel work in M.S.Gate including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer welded and bolted including special shaped washers etc complete (welding to be paid separately).

774

-

-

... More
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand).

6

-

-

... More
Distempering (two or more coats) with oil bound washable distemper of approved brand and manufacture and of required shade on new work over and including a priming coat with distemper primer of approved brand and manufacture to give an even shade.

22

-

-

... More
Painting two or more coats (excluding priming coat) with superior ready mixed paint for steel work of approved brand and manufacture in all shades on new work to give an even shade.

35

-

-

... More
Carriage of materials by mechanical transport including loading, unloading from the nearest source to site of work.

1

-

-

... More
RETAINING WALL

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I) Ordinary Soil Manual Means

181

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. PCC Grade M15

37

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Random Rubble Masonry

201

-

-

... More
Dry Random Rubble Masonry ( First Sort ) with hard stone in foundation and plinth.

156

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification.

115

-

-

... More
Carriage of materials by mechanical transport including loading, unloading from the nearest source to site of work.

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.