Urban Development And Housing Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Urban Development And Housing Department Tender
Eprocure
Opening Date6 Feb 2021
Closing Date26 Feb 2021
Tender AmountRefer Documents
Costs
EMD
₹ 11,08,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2021_APUDH_412_1Bid Award Id
ViewTender No
RIDF-02-2020-21Tender Authority
Urban Development And Housing Department ViewPurchaser Address
-Website
http://http://udarunachal.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Extra for every additional lift of 1.5 Meter or part thereof for saturated soil.
65.04
-
-
Providing and laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 MM nominal size) excluding the cost of centring and shuttering in:
Foundations and plinth .
1059.02
-
-
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in:
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 MM nominal size).
1455.09
-
-
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc. from top of foundation up-to floor two level including finishing and plastering exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 MM to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in:
M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 MM nominal size).
2529.04
-
-
Reinforced cement concrete in suspended floors, roofs, landings and balconies up-to floor two level including finishing and plastering the exposed surface with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 MM to give a smooth and even surface but excluding cost of centring and shuttering and reinforcement with M20 (1 cement : 1.5 coarse sand : 3 stone aggregate 20 MM nominal size).
568.57
-
-
Centring and shuttering including strutting, propping etc and removal of form work for:Foundation, footings, bases of columns etc. and mass concrete.
2913
-
-
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
5710.85
-
-
Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 Meter height).
32933.5
-
-
Reinforcement of RCC work including bending, binding and placing in position complete.
Tor/ TMT steel.
329431.54
-
-
Random rubble masonry with hard stone in foundations and plinth in cement mortar 1 : 6 (1 cement : 6 fine sand) including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 stone aggregate 20 MM nominal size) at plinth level.
1005.62
-
-
12 MM cement plaster 1 : 3 (1 cement : 3 fine sand).
17145.72
-
-
Neat cement punning.
17145.72
-
-
Carriage as per calculation
1
-
-
Granular cushion, sand filling (0.25 percentage of Item 1 to 16)
0.25
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements