Public Works Department Tender

... More
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Mar 2025
Closing Soon17 Mar 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Clearing and Grubbing Road Land .(Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)

-

-

-

... More
By Manual Means:-

-

-

-

... More
In area of Area of thorny jungle

12.32

-

-

... More
Cutting of Trees, including Cutting of Trunks, Branches and Removal (Cutting of trees, including cutting of trunks, branches and removal of stumps, roots, stacking of serviceable material with all lifts and up to a lead of 1000 mtrs and earth filling in the depression/pit.)

-

-

-

... More
Girth from 300 mm to 600 mm

582

-

-

... More
Girth from 600 mm to 900 mm

463

-

-

... More
Girth from 900 mm to 1800 mm

300

-

-

... More
SH III:- Earth Work in Formation Cutting - 8.00 Km

-

-

-

... More
Excavationin Hill Area in Soil by Mechanical Means (Excavationinsoil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres

34385

-

-

... More
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavationin hilly areain ordinaryrock notrequiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres

275080

-

-

... More
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.)

34385

-

-

... More
SH IV :- Preparation of Sub-grade - 14.00 Km

-

-

-

... More
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)

102900

-

-

... More
SH V :- GSB - 14.00 Km

-

-

-

... More
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)

-

-

-

... More
For Grading- I Materials

8085

-

-

... More
SH VI :- CC Pavement - 14.00 Km

-

-

-

... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)

8085

-

-

... More
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing. )

8085

-

-

... More
SH VII :- Box Culver 1x1m - 14 Nos.

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)Mechanical Means/upto 3 m depth (without de-watering)

478.38

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

109.2

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications (C) RCC Grade M20 Case I Using concrete mixer

24.08

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications/RCC Grade M20 /Height upto 5m/Using concrete Mixer

162.05

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification/For solid slab super structure, 20-30% of (a+b+c) /Height upto 5m

60.19

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications

20.94

-

-

... More
Back filling behind abutment ,wing wall and return wall complete as per drawing and technical specification/a) Granular material

280

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

364

-

-

... More
SH VIII :- Box Culver 2x2M - 2 Nos

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)Mechanical Means/upto 3 m depth (without de-watering)

112.88

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

23.38

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications (C) RCC Grade M20 Case I Using concrete mixer

8.06

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications/RCC Grade M20 /Height upto 5m/Using concrete Mixer

48.95

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification/For solid slab super structure, 20-30% of (a+b+c) /Height upto 5m

13.96

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications

4.22

-

-

... More
Back filling behind abutment ,wing wall and return wall complete as per drawing and technical specification/a) Granular material

120

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

64

-

-

... More
SH IX :- Kutcha Drain 10.00 Km

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the exacation earth to the extent required and utilising the remaining earth locally for road work)

-

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

19500

-

-

... More
SH X :- RCC Drain -Usize 0.60 x 0.45 x 0.60 mtr) - 1.50 Km

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides a

-

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

1800

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

255

-

-

... More
RCC 1:1.5:3 Reinforced concrete work in foundations, footings and bases of column etc excluding the cost of centering and shuttering in

750

-

-

... More
Reinforcement of RCC Work including bending,binding and placing in position (a) TMT Bars

62085

-

-

... More
centering and shuttering including strutting proping etc.and removal of form work for:(b) wall including attached buttresses,pilasters etc.

3060

-

-

... More
Pastering with cement motor 1:3 (1: cement : 3 find sand)

3000

-

-

... More
SH XI :- R/Wall 3.00 Height 330 Mtr

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)

-

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

687.23

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

146.03

-

-

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification

-

-

-

... More
Random Rubble Masonry

1210.61

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular Material

247.5

-

-

... More
Providing weep holes in Brick masonary/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards draing face. Complete as per drawing and technical specifications.

528

-

-

... More
SH XII :- B/Wall 3.00 Height - 250 Mtr

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)

-

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

520.63

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

65.63

-

-

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification

-

-

-

... More
Random Rubble Masonry

917.13

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

187.5

-

-

... More
Providing weep holes in Brick masonary/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V : 20H towards draing face. Complete as per drawing and technical specifications.

400

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.