Public Works Department Tender
... More
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date7 Mar 2025
Closing Date17 Mar 2025
Tender Amount₹ 21,50,27,043
Costs
EMD
₹ 21,50,270Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWDAP_2219_1Bid Award Id
ViewTender No
NIT/PLND/CRIF/2024-25/001Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://www.arunachalpwd.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in Hilly Area in Soil by Mechanical Means
(Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres).
72500.74
-
-
... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
18125.19
-
-
... More
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting.
(Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
12794.25
-
-
... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
3198.56
-
-
... More
SH:- Interlocking Paver Block- 3.00Km
-
-
-
... More
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)
16650
-
-
... More
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.
16650
-
-
... More
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
(i) for grading- I Material
4995
-
-
... More
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator,filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in- Charge
(ii) 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.
16500
-
-
... More
Providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.50 coarse sand : 3 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :
a) Foundations and plinth
80
-
-
... More
Centring and shuttering including strutting proping etc. and removal of form work for: a) Foundations and plinth.
400
-
-
... More
SH:- Box Culvert (1.5x1.5m)- 07 Nos.
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
I. Ordinary soil
A. Manual Means
(i) upto 3 m depth
284.66
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
35.67
-
-
... More
Centring and shuttering including strutting, propping etc and removal of form work for: (b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
372.4
-
-
... More
c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height).
79.8
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M15
Height upto 5m
107.31
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
30.87
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
6.83
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical s
140
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
391.02
-
-
... More
15mm cement plater 1:6 (1 cement : 6 fine sand)
316.68
-
-
... More
SH:- Box Culvert (2.0x2.0m)- 01No.
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
I. Ordinary soil
(A) Manual Means
(i) upto 3 m depth
60.84
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
5.62
-
-
... More
Centring and shuttering including strutting, propping etc and removal of form work for: (b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
56
-
-
... More
c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height).
14
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M15
Height upto 5m
15.33
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
For solid slab super-structure, 20-30% of (a+b+c) Using Concrete Mixer Height upto 5m
5.46
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
1.11
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical s
20
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
a) Granular material
115.71
-
-
... More
15mm cement plater 1:6 (1 cement : 6 fine sand)
58.5
-
-
... More
SH:- Steel Girder Composite Bridge (35.00m Span)- 01No. (a) (Foundation and Sub Structure)
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
a) Ordinary soil, Mechanical Means
i) Above 6 m depth (with de-watering)
831.48
-
-
... More
Ordinary rock (not requiring blasting, Mechanical Means
(i) Depth upto 3 m ( with de-watering).
554.32
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specification
Square Rubble Coursed rubble masonry( first sort )
63.96
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. Using Concrete Mixer B) PCC Grade M15
36.08
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. Using Concrete Mixer. a) RCC Grade M35.
569.1
-
-
... More
Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical specification
147
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications , Height 5m to 10m , Using concrete Mixer a) RCC Grade M35,
62.54
-
-
... More
Supplying, fitting and placing Mild steel reinforcement complete in sub-structure as per drawing and technical specification.
10.1
-
-
... More
Provididng weep holes in brick masonry/plain/ reinforcement concrete abutment, wing wall/ return wall with 100 mm dia AC Pipe extending through the full width of the structure with slope of 1V:20H towards drwaing face, complete as per drawing and technical specification.
54
-
-
... More
Back filling behind the abutment, wing wall & return wall complete as per drawing and technical specification
(a)Granular materials
555.54
-
-
... More
Providing and laying fitlter media with granular materials/ stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoTTH specifications to a thickness of not less than 600 mm with smaller size towards the slil and bigger size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing qall and return wall to the full height compacted to a firm condition complete as per drawing and techincal specification.
124.2
-
-
... More
Approach wall
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
Ordinary soil, Mechanical Means
Above 6 m depth (with de-watering)
296.45
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical SpecificationSquare Rubble Coursed rubble masonry( first sort )
46.2
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.Using Concrete Mixer PCC Grade M-15
46.2
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.Using Concrete Mixer RCC Grade M35
330.98
-
-
... More
Supplying, fitting and placing un-coated Mild steel reinforcement complete in foundation as per drawing and technical specification
11.4
-
-
... More
Provididng weep holes in brick masonry/plain/ reinforcement concrete abutment, wing wall/ return wall with 100 mm dia AC Pipe extending through the full width of the structure with slope of 1V:20H towards drwaing face, complete as per drawing and technical specification.
42
-
-
... More
Back filling behind the abutment, wing wall & return wall complete as per drawing and technical specification
Granular materials
122.5
-
-
... More
(S/Sub Head:-Super-structure)
-
-
-
... More
Supply and fabrication of steel work at Fabricators workshop comprising of Main Girders, Cross Girders, Connecting plates, stringers, stiffening plates etc. from steel plates and structural steel of specified grades as per approved drawing including straightening, descaling, degreasing, cutting to size and shape, drilling, welding and grinding, supply of all MS / HTS shop or site bolts, nuts & washers, holding down bolts and nuts etc., trial assembling at workshop, one priming coat of shop paint with red lead paint conforming to IS-102 with all labour, material, cost of paints, consumables, stacking in protected condition etc complete as per specification and as directed by the Engineer in charge (Carriage cost from fabricator workshop to actual bridge site will be paid separately).
197.5
-
-
... More
Taking delivery of fabricated steel work from stacks at site as necessary, assembling and erection at site as necessary, assembling and erection of fabricated steel structure to proper line, level and camber as per approved drawings complete in asll respect including transportation and handling supply of all fasteners. Painting of all exposed surfaces of steel work after erection with one coat of red lead conforming to IS-102 and two coats Aluminium paint to IS-2339, grouting of anchor bolts in position, including all labour, consumables, materials, machinery, tools and tackles complete as per specification and as directed by the Engineer in charge
197.5
-
-
... More
Decking slab
-
-
-
... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M25, Using Concrete Mixer, For solid slab super-structure, 20-30% of (a+b+c) ,Height 5m to 10m.
91.35
-
-
... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202.
5.72
-
-
... More
Mastic Asphalt (Providing and laying 12 mm thick mastic asphalt wearing course on top of deck slab excluding prime coat with paving grade bitumen meeting the requirements given in table 500-29, prepared by using mastic cooker and laid to required level and slope after cleaning the surface, including providing antiskid surface with bitumen precoated fine grained hard stone chipping of 9.5 mm nominal size at the rate of 0.005cum per 10 sqm and at an approximate spacing of 10 cm center to center in both directions, pressed into surface when the temperature of surfaces not less than 100 deg. C, protruding 1 mm to 4 mm over mastic surface, all complete as per clause 515.)
304.5
-
-
... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.
20
-
-
... More
Supplying, fitting and fixing in position true to line and level cast steel rocker bearing conforming to IRC: 83(Pt.-1) section IX and clause 2003 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
Roller Bearing : 3x200
900
-
-
... More
Rocker Bearing : 3x200
900
-
-
... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
20
-
-
... More
Reinforced Cement Concrete Crash Barrier (Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-20 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified) M 20 grade concrete.
70
-
-
... More
Reinforced cement concrete approach slab including reinforcement and form work complete as per drawing and Technical specification
20.1
-
-
... More
Sub Soil Investigation
-
-
-
... More
Cost of transportation of planks, equipments and personal effects to the side of work and back as per the mobilization.
4
-
-
... More
Boring drilling hole at the abuitments , anchor block in river banks though allkind of soil and rock up to depth of 20 mtr from the ground level (50mmdia).
18
-
-
... More
Collection of soil sample and conducting of selection soil and rock samples to natural moisture content, particle size distribution, liquid and plastic limit, bulk and dry density and specific gravity of soil sample.
6
-
-
... More
Completion of laboratory test result including preparation and submission of report.
3
-
-
... More
(S/Sub Head : Bank Protection Span 10 m)
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
Manual Means.
Depth upto 3 m.
240
-
-
... More
Providing and laying boulders apron on river bed for protection against scour with stone boulders weighing not less than 40 kg each complete as per drawing and Technical specification.
A Boulder laid dry without wire crates.
240
-
-
... More
Boulder apron laid in wire crates (Providing and laying of boulder apron laid in wire crates made with 4mm dia GI wire conforming to IS: 280 & IS:4826 in 100mm x 100mm mesh (weaved diagonally) including 10% extra for laps and joints laid with stone boulders weighing not less than 40 kg each.)
240
-
-
... More
SH:- PCC Breast Wall- 208.576 Mtrs.
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
Ordinary Soil, Manual Means, Upto 3 m depth
1358.46
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
166.44
-
-
... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
PCC Grade M15
1321.12
-
-
... More
Centring and shuttering including strutting, propping etc and removal of form work for :
b) Walls (any thickness) including attached pilasters, buttresses, plinth and string
courses etc.
2384.65
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
625.73
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
Granular material
391.08
-
-
... More
SH:- RCC Retaining Wall- 200.00 Mtrs.
-
-
-
... More
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m.
2100
-
-
... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering
62
-
-
... More
Reinforced cement concrete in retaining wall (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets etc from top of foundation up to floor two level excluding cost of centring,shuttering and reinforcement in :
a) M20 (1 cement : 1.5 Coarse Sand : 3 stone aggregate 20 mm nominal size).
486.2
-
-
... More
Centring and shuttering including strutting, propping etc and removal of form work for :
a) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
2320
-
-
... More
Reinforcement of RCC work including bending, binding and placing in position complete
a) Tar/ TMT steel
29878.6
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
200
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular material
670
-
-
... More
SH:- Cattle Trap-01 No.
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
(i) Ordinary soil
79.2
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
17
-
-
... More
Plan/Reinforced cement concrete in sub structure complete as per drawing and technical specifications.
A) PCC Grade M15 (p) Height upto 5m
48.23
-
-
... More
Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint.
b) In Tees, Angles, I, and Channels
31.21
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. a) Granular material
4.41
-
-
... More
SH:- CC Drain-2770.00 Mtrs
-
-
-
... More
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m.
2077.5
-
-
... More
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in:a) Foundations and plinth
560.93
-
-
... More
Centering and shuttering including strutting , propping etc, and removal of form work for :- b) Walls including attached buttresses, pilasters etc.
5817
-
-
... More
12 mm Cement plaster in CM 1:4 (1 Cement : 4 Sand)
4570.5
-
-
... More
Neat Cement Punning
4570.5
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements