Public Works Department Tender
... More
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date21 Mar 2025
Closing Date26 Mar 2025
Tender Amount₹ 2,95,60,700
Costs
EMD
₹ 2,95,607Document Cost
₹ 3,000Tender Fee
Refer Documents
Summary
C/o Cc Drain And Cc Pavement Road From Brtf Road To Tikringka Hq Under Jaring Circle, Upper Subansiri District
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWDAP_2406_1Tender No
DD/NIT/SASCI/2024-25/13Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://www.arunachalpwd.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Granular with coarse Graded material (Table:- 400-2) (Construction of granular sub-base by providing coarse graded materials, spreading in unidform layers with motor grader on prepared surface, mixing by mix in place method wth rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per 401) For grading-I materials
1718.75
-
-
... More
Rolled Cement Concrete Base (Construction of rolled cement concrete base course with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm with minimum, aggregate cement ratio15:1 and minimum cement content of 200 kg/cum, aggregate gradation to be as per table 600-4 after blending, mixing in batching plant at optimum moisture content, transporting to site, laying with a paver with electronic sensor, compacting with 8-10 tonnes smooth wheeled vibratory roller to achieve, the designed flexural strength, finishing and curing.)
1375
-
-
... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
893.75
-
-
... More
(SH: CC Drain -II size 60 x 45 x 60 mtr)
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides a Ordinary soil Manual Means upto 3 m depth
112
-
-
... More
PCC 1:3:6 IN FOUNDATION(Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days
13.04
-
-
... More
Stone masonary work in cement mortar 1:3 for sub structure complete as per drawing and technical specifications. Course rubble masonary(First sort)
187.51
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specifications. Granular material
58.78
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
81.16
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements