Public Works Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Oct 2024
Closing Date25 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SH : RCC Retaining wall, 4.00 mtr Height

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling the excavation earth to the exlent required and utilising the remaining earth locally for road work.) Ordinary soil Manual Means (Depth upto 3 m)

548.05

10

-

... More
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

43.91

10

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications RCC Grade M20 (Height up to 5 m)

30.68

10

-

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

2.02

10

-

... More
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

31

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

19.52

10

-

... More
SH : B/ wall 10.00 mtr length & 3.80 mtr Height

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means (Depth upto 3 m)

30.78

10

-

... More
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

3.42

10

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. Random Rubble Masonry

23.33

10

-

... More
Dry Rubble flooring

25.69

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

6.88

10

-

... More
SH :RCC Slab Culvert 1.00 mtr Span 1.50 mtr Height

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I. Ordinary soil A.Manual Means i. upto 3 m depth

95.88

10

-

... More
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

22.8

10

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. Coursed Random Rubble Masonry(first Short)

61.84

10

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m

0.54

10

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

2.72

10

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.54

10

-

... More
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

36

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

4.13

10

-

... More
SH- RCC Steel Composit Bridge

-

-

-

... More
(SH:Sub-Structure) Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means (Depth 3-6 m)

504

10

-

... More
Ordinary rock (not requiring blasting) Manual Means (Depth upto 3 m)

504

10

-

... More
Hard rock (requiring blasting) Manual Means

252

10

-

... More
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

36.48

10

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications. As pe detail attached Annexure-RB

21.64

10

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M25 Height upto 5m using concrete mixer

326.45

10

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications RCC Grade M30 Height upto 10m using concrete mixer

20.06

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

1046.15

10

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.

213.85

10

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

236

10

-

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

244800

10

-

... More
(SH:Super Structure) Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification. C.RCC Grade M30 Case-I:Using Concrete Mixer i. For solid slab super-structure, 20-30% of (a+b+c) r.Height above 10m

22.5

10

-

... More
E.PSC Grade M-40 Case-I:Using concrete mixer. i. For solid slab super-structure, 20-30% of (a+b+c) q.Height 5m to 10m

21

10

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification

15.6

10

-

... More
M30 Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

15.6

10

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

4.36

10

-

... More
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and technical Specifications.

14

10

-

... More
Drainage Spouts complete as per drawing and Technical specification

15

10

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

8.44

10

-

... More
Structural steel work such as bearing plate, 100mm Ø steel tube & HT bolt 50mm Ø as per direction of Engineer incharge and drawing.(Steel work similar to item 12.10 for cutting edge has been consicerded for rate) At crash barrier pipe rail hoisting and placing etc

0.9

10

-

... More
Supply and fabrication of steel work at Fabricators workshop comprising of Main Girders, Cross Girders, Connecting plates, stringer, stiffening plates etc. and delivered at bridge site in undamaged condition including straightening, descaling, degreasing, cutting to size and shape, drilling, welding and grinding, supply of all MS/HTS shop or site bolts, nuts & washers, holding down bolts and nuts etc., trial assembling at workshop, one priming coat of shop paint with red lead paint conforming to IS-102 with all labour, material, cost of paints, consumables, etc. complete as per specification and as directed by the Engineer-in-Charge

27

10

-

... More
Taking delivery of fabricated steelwork, leading to and at site as necessary, assembling and erection of fabricated steel structure to proper line , level and camber as per approved drawings complete in all respect including transportation and handling in and specification including supply of all fasterners, painting of all exposed surfaces of steelwork after erection with one site coat of red lead to IS-102 and two coats Alumunimium paint to IS-2339, grouting of anchor bolts in position, including all labour, consumables, materials, machinery, tools and tackles complete as per specification and as directed by the Engineer-in-Charge Case-I:Up to 40m single span or in multiples

27

10

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.