Public Works Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Feb 2024
Closing Date16 Feb 2024
Tender Amount₹ 9,83,76,482 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
SH:Dismantling (3.5km)

-

-

-

... More
Dismantling of Flexible Pavements (Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately) A. By Manual Means

568.75

-

-

... More
SH: Sub-Grade, GSB,DLC, CC Pavement & Road Marking width 5.50m. SH:SUBGRADE & WBM(3.5KM)

-

-

-

... More
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)

21000

-

-

... More
SH :-Granular Sub-base By Mix in Place Method (Construction of granular sub- base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) (I) for grading- I Material

4200

-

-

... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)

3150

-

-

... More
SH: C.C. PAVEMENT(3.5km) Centring and shuttering including strutting,propping etc and removal of form work for : a) Foundation, footings, bases of columns etc. and mass concrete.

1400

-

-

... More
Providing and laying in 1000 G polythene film below cc pavement with suficient overlap of 1.5ft copmlet as /Relevant Specification.

3150

-

-

... More
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing ) Mix Design M35

2887.5

-

-

... More
Reinforcement For Dowels Bars of CC pavment work including bending, binding and placing in position complete. TMT, Fe-500 b) Cold Twisted bars

34355.12

-

-

... More
Providing and laying in position bitumen hot sealing compound for expansion joints etc. 6mmx50mm Using grade 'A' sealing compound Carriage Width 5.50m CC Pavement

14000

-

-

... More
SH: ROAD MARKING Painting Two Coats on New Concrete Surfaces (Painting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces)

798

-

-

... More
SH: Slab Culvert 1 mtr span(8 Nos)

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil A. Manual Means (i) upto 3 m depth

759.84

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

189.82

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )

535.93

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m

35.4

-

-

... More
Furnishing and Placing Reinforced / Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

25.6

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

3.78

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technicals

224

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material

132.8

-

-

... More
SH: Retaining Wall 3.00 Height 10.00 Length(472m)

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides a I. Ordinary soil A. Manual Means (i) upto 3 m depth

2282.59

-

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

87.79

-

-

... More
Centring and shuttering including strutting,propping etc and removal of form work for : (b) a) Foundation, footings, bases of columns etc. and mass concrete.

3135.97

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC grade M20 Height upto 5m

623.04

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

27496.36

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. Granular material

3894

-

-

... More
SH:-Side Drain 1km

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom with backfilling of approved materials) I. Ordinary soil A. Manual Means (i) upto 3 m depth

1700

-

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 3: 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

200

-

-

... More
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 40 mm nominal size) excluding the cost of centring an shuttering in: a) Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.

600

-

-

... More
12mm cement plater 1:4 (1 cement : 4 fine sand)

3250

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.