Opening Date7 Dec 2024
Closing Date13 Dec 2024
Tender AmountRefer Documents
Costs
EMD
₹ 2,89,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
C/o Road From Rach Tabio To Meb Jote Village
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_2014_1Tender No
SLD/SSD/SJETA/2024-25/02Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://www.arunachalpwd.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Girth from 600 mm to 900 mm
700
-
-
... More
SH: FORMATION CUTTING
-
-
-
... More
Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1)
24570.84
-
-
... More
Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in Ordinary Rock using Manual Means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.)
12657.71
-
-
... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
18614.28
-
-
... More
SH: CROSS DRAINAGE WORK
SSH: RCC SLAB CULVERT 1 MTR SPAN 1 MTR HEIGHT
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material).
(i) Ordinary soil
a)Manual Means (upto 3 m depth (without dewatering))
278.08
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
60.8
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
174.48
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
a) RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
9.4
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
1.69
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
38.88
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
72
-
-
... More
SSH: RCC SLAB CULVERT 2 MTR SPAN 2 MTR HEIGHT
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material).
(i) Ordinary soil
a)Manual Means (upto 3 m depth (without dewatering))
570.72
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
103.68
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
389.12
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
a) RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
20.44
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
2.77
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
90.48
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
88
-
-
... More
SSH: RCC SLAB CULVERT 4 MTR SPAN 4 MTR HEIGHT
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material).
(i) Ordinary soil
a)Manual Means (upto 3 m depth (without dewatering))
723.36
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
87.68
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
516.3
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
a) RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c) (p) Height upto 5m
24.54
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
2.28
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
92.16
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
156
-
-
... More
SH: PROTECTION WORK
SSH: RRM RETAINING WALL 3.00 MTR. HEIGHT
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) (I) Ordinary Soil (A) Manual Means (i) Upto 3 m depth
179.92
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
34.32
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. (B) PCC Grade M20 (p) (Height upto 5m)
9.57
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications (A) Random Rubble Masonary
322.4
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
104
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular material
78
-
-
... More
SH: CC DRAIN
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material).
I. Ordinary soil (A) Manual Means
i(b) upto 3 m depth (with de-watering).
445.5
-
-
... More
Centring and shuttering including strutting, propping etc. and removal of form work for (a) Foundation, footings, base of columns etc. and mass concrete.
3960
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
267.3
-
-