Public Works Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Civil And Construction
Road Construction
Eprocure
Opening Date5 Jun 2023
Closing Date12 Jun 2023
Tender Amount₹ 2,95,64,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Girth from 900 mm to 1800 mm

60

-

-

... More
2. Clearing and Grubbing Road land (claering and grubbing road land including uprooting rank vegetetion , grass, bushes, shrubs, saplings and trees girth upto 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness). (i) By manual means A. In area of light jungles

2.5

-

-

... More
II. SH:- Formation Cutting

-

-

-

... More
Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth on the Barren Valley side.

64686.5

-

-

... More
Excavation in hilly area in ordinary rock not requiring blasting by mechanical means including cutting and trimming of slopes and disposal of excavated earth on the barren valley side.

63500.05

-

-

... More
III. SH:- Kutcha Drain

-

-

-

... More
C/o Kutcha Drain as per drawing and direction of Engineer In - Charge

3120

-

-

... More
IV. SH:- Culvert 1.5 mtr span-5 Nos

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil A. Manual Means (i). upto 3 m depth

381.7

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

88.65

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )

227.31

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m

21.6

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

16.74

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.78

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical s

100

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material

70

-

-

... More
(i). Carriage of Materials by mechanical transport from Bhalukpong to work site including loading, unloading and stacking in measurable stacks as per direction of Engineer - in - charge. a) Cement -

70.16

-

-

... More
b) Steel -

1.78

-

-

... More
(ii). Carriage of River bed materials like Sand, Shingles, Boulder etc by mechanical transport from River to Site of works including loading, unloading and stacking in measurable stacks as per direction of Engineer - in - charge. a) Sand -

128.75

-

-

... More
b) Aggregate -

114.28

-

-

... More
c) Boulder -

263.7

-

-

... More
d) Granular material -

84

-

-

... More
V. SH:- Culvert 3.0 mtr span-2Nos

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Manual Means Depth upto 3 m

265.48

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

77.82

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15

117.12

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry

73.12

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M20 Using Concrete Mixer

3.94

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer Height upto 5m

17.56

-

-

... More
Reinforcement of RCC work including bending binding and placing in position complete.(a) Cold twisted/TMT bars

2.42

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification Granular material

79.68

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

80

-

-

... More
(i). Carriage of Materials by mechanical transport from Bhalukpong to work site including loading, unloading and stacking in measurable stacks as per direction of Engineer - in - charge. a) Cement -

72.04

-

-

... More
b) Steel -

2.42

-

-

... More
(ii). Carriage of River bed materials like Sand, Shingles, Boulder etc by mechanical transport from River to Site of works including loading, unloading and stacking in measurable stacks as per direction of Engineer - in - charge. a) Sand

120.44

-

-

... More
b) Aggregate -

194.81

-

-

... More
c) Boulder -

84.83

-

-

... More
d) Granular material -

95.62

-

-

... More
VI. SH:- Retaining wall 3.00 mtr height-117.53 mtr Length

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. I. Ordinary soil A. Manual Means (i). upto 3 m depth

321.56

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

20.1

-

-

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification (a). Random Rubble Masonry

370.1

-

-

... More
(a). Dry Rubble flooring

144.33

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular material

102.84

-

-

... More
Carriage of Engineering Material such As Steel , Bitumen , Bitumen Emulssion, CGI Sheet, etc By mechancal Transport including Loading, Unloading and stacking at site as per direction of engineer-in charge from Bhaukpong to site of work ( Hill Road ) ( Lead 115.00 km )

64.31

-

-

... More
Carriage of Engineering Materials like forest product such as sand, Boulder,stone shingle,stone aggregate, moorom from quarry site by mechanical transport including Loading, Unloading and stacking in measurable stack as per direction of engineer in chargeat site of work from quarry to work siteon Hill/Katcha/Gravelled road. ( Lead 5.00 km )

696.44

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.