Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Apr 2024
Closing Date8 Apr 2024
Tender AmountRefer Documents
Costs
EMD
₹ 1,69,951Document Cost
₹ 2,000Tender Fee
Refer Documents
Summary
Construction Of Approach Road From Bro Helipad Leeto Cocumbdo Resident Via Hospital/general Ground/co Cum
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1860_1Bid Award Id
ViewTender No
SGMD/NIT/KLG//2023-2024/10Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachalpwd.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.
20775.1
-
-
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres (average lead 50 metres), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections).
12465.06
-
-
Excavation in Hard Rock ( blasting prohibited) (Excavation for roadway in hard rock ( blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
A. Mechanical
8310.04
-
-
SH:3 Cross Drainage
-
-
-
SH :- RCC Slab Culvert 1.50m Span - 1.50m height=2.00 Nos
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I. Ordinary soil.
A.Manual Means.
i. upto 3 m depth
283.82
-
-
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
71.8
-
-
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Random Rubble Masonry
93.66
-
-
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20
Height upto 5m
1.08
-
-
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
4.48
-
-
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
0.96
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
40
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
a) Granular material
7.06
-
-
SH :- RCC Slab Culvert 2.00 m Span - 2.00 m height=2.00 Nos
Excavation for Structure (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I. Ordinary soil.
A.Manual Means.
i. upto 3 m depth
459.36
-
-
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
50.88
-
-
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Random Rubble Masonry
188.92
-
-
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20
Height upto 5m
1.92
-
-
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
10.36
-
-
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
1.49
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
80
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
a) Granular material
75.6
-
-