Public Works Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date11 Oct 2024
Closing Date25 Oct 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.

103087.05

10

-

... More
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)

125995.29

10

-

... More
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)

177853.6

10

-

... More
SH:- SLAB CULVERT (2.00 mtr Span & 2.00mtr Height

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means upto 3 m depth

92.7

10

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

23.76

10

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed Rubble Masonary( First Short)

85.15

10

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 (Height up to 5m)

0.96

10

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

5.18

10

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.75

10

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.

32

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material

52.65

10

-

... More
SH:- SLAB CULVERT 4.0 mtr Span & 4.00 mtr Height

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means upto 3 m depth

106.8

10

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

23.28

10

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed Rubble Masonary( First Short)

162.58

10

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 (Height up to 5m)

0.96

10

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

18.3

10

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.47

10

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.

42

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material

30.24

10

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.