Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Civil Works Others
Eprocure
Opening Date1 Mar 2024
Closing Date7 Mar 2024
Tender Amount₹ 98,59,379
Costs
EMD
₹ 99,000Document Cost
₹ 2,500Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1749_1Bid Award Id
ViewTender No
BD/e-NIT/SIDF/2023-24/09Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://www.arunachalpwd.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
2160
-
-
... More
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto distance of 100 metres ( average lead 50 metres), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
1080
-
-
... More
SH:-Approach Road
-
-
-
... More
Excavation in Soil with Dozer with lead upto 100 metres ( Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections.)
3453.31
-
-
... More
Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
1479.99
-
-
... More
SH:-Boundary Wall With MS Gate
-
-
-
... More
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposit layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
78
-
-
... More
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering in: a) Foundation and plinth.
13.47
-
-
... More
Centring and shuttering including strutting, propping etc and removal of formwork for : a) Foundations, footings, bases of column and mass concrete.
117.47
-
-
... More
Brick work with best available local bricks in foundations and plinth in cement mortar 1:4(1cement:4 fine sand)
99.38
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications.
RCC Grade M20
Height upto 5m
Case-I Using concrete Mixer
41.83
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications.
2.45
-
-
... More
Providing and fixing MS gate as per technical drawing and specification complete.
1489.7
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A) Granular Materials
75.11
-
-
... More
SH:-CC SURFACE FOR LANDING AREA
-
-
-
... More
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material,spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)
Granular Sub-Base
605
-
-
... More
Dry Lean Cement Concrete Sub- base (Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.)
Dry Lean Cement Concrete
87.88
-
-
... More
Cement Concrete Pavement (Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, for M40 Grade having minimum 28 days flexural strength of 4.5 Mpa, using approved admixtures, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip,dowel bar, tie rod, admixtures as approved, curing compound, finishing tolines and grades as per drawing. )
Pavement Quality Concrete
121.68
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements