Public Works Department Tender
... More
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Road Construction
Eprocure
Opening Date24 Mar 2025
Closing Date7 Apr 2025
Tender Amount₹ 27,72,30,000
Costs
EMD
₹ 27,72,300Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Improvement Of District Head Quarters Township Roads
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWDAP_2425_1Bid Award Id
ViewTender No
BDL/TA-32/BSD-09/2024-25/261 Dated 21/03/2025Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachaltenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Dismantling of flexible pavements and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
By Manual Means
Bituminous courses
251.74
-
-
... More
Dismantling of Cement Concrete Pavement
-
-
-
... More
Dismantling of cement concrete pavement by mechanical means using pneumatic tools, breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials up to a lead of 1000 metres, stacking serviceable and unserviceable materials separately
487.5
-
-
... More
(SSH:- Formation Cutting )
-
-
-
... More
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
12805.77
-
-
... More
Excavation in Hard Rock (blasting prohibited)
-
-
-
... More
Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. A. Mechanised
5332.62
-
-
... More
Haulage of materials by tipper exluding the cost of loading and unloading on hill roads[ lead = 7.50 Km]
36915.2
-
-
... More
(SSH:- Widening )
-
-
-
... More
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
18175.07
-
-
... More
Excavation in Hard Rock (blasting prohibited)
Excavation for roadway in hard rock (blasting prohibited) with rock breakers including breaking rock, loading in tippers and disposal within all lifts and lead upto 1000 metres, trimming bottom and side slopes in accordance with requirements of lines, grades and cross sections. A. Mechanised
9833.75
-
-
... More
Haulage of materials by tipper exluding the cost of loading and unloading on hill roads[ lead = 7.50 Km]
58282.88
-
-
... More
(SSH: Non Bituminous Course)
-
-
-
... More
Preparation of sub grade
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.
22458.47
-
-
... More
Granular Sub-Base with Coarse Graded Material (Table:- 400- 2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
For grading-I
3621.61
-
-
... More
Granular Sub-Base with Coarse Graded Material (Table:- 400- 2)
Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
For grading-II
1810.81
-
-
... More
Wet Mix Macadam
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.
9177.24
-
-
... More
(SSH: Bituminous Course)
-
-
-
... More
Prime Coat - Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.
44542.14
-
-
... More
Tack Coat - Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.
44542.14
-
-
... More
Dense Graded Bituminous Macadam : Bituminous Concrete (Providing and laying bituminous concrete with 100- 120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects).
2893.11
-
-
... More
Bituminous Concrete : (Providing and laying bituminous concrete with 100- 120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects).
2254.52
-
-
... More
(SSH: Earthen Shoulder)
-
-
-
... More
Construction of Subgrade and Earthen Shoulders (Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)
837.52
-
-
... More
(SH :-Cross drain with cattle trap-13 No. )
-
-
-
... More
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering)
A) Manual Means
(i) Depth upto 3 m
210.6
-
-
... More
PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
15.6
-
-
... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications PCC grade M20
88.14
-
-
... More
Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. b) In Tees,Angles and Channels.
75.21
-
-
... More
15 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
486.72
-
-
... More
Neat cement punning.
486.72
-
-
... More
(SH:- V-Shaped RCC drain - 8.63km Length)
-
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
1360.26
-
-
... More
II) Ordinary Rock (not requiring blasting)
i) Depth upto 3 m (without de-watering)
906.84
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications
RCC Grade M25.
Using Concrete Mixer. Height upto 5m
1475.73
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications
64.07
-
-
... More
15 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
9838.2
-
-
... More
Neat cement punning.
9838.2
-
-
... More
(SH:- RCC slab culvert 1.50 mtr. span - 4Nos.)
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material I) Ordinary soil
A) Manual Means
i) Depth upto 3 m (without de-watering)
549.15
-
-
... More
II) Ordinary Rock (not requiring blasting)
A) Manual Means
i) Depth upto 3 m (without de-watering)
366.1
-
-
... More
Dry rubble Flooring
6.08
-
-
... More
PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
46.55
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specifications
Random Rubble Masonry( coursed/uncoursed )
374.27
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
PCC Grade M20
4.53
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
120
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
RCC Grade M25
Using Concrete Mixer. Height upto 5m
43.7
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
2.41
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
39.04
-
-
... More
(SSH:- RCC Slab culvert 3.00 mtr. span- 1 No.)
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material I) Ordinary soil
A) Manual Means
i) Depth upto 3 m (without de-watering)
136.59
-
-
... More
Ordinary Rock (not requiring blasting A) ) Manual Means
(i) Depth upto 3 m (without de-watering)
91.06
-
-
... More
Dry rubble Flooring
3.8
-
-
... More
PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
14.4
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and Technical Specifications
Random Rubble Masonry( coursed/uncoursed )
109.74
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
PCC Grade M20
2.27
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
48
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
RCC Grade M25
Using Concrete Mixer. Height upto 5m
11.25
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
0.93
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
48
-
-
... More
(SH :- Protection Wall- 3.00m high )( Length = 170.00m)
-
-
-
... More
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
357.38
-
-
... More
PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
46.82
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
655.1
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular material
88.82
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
187
-
-
... More
(SH :- Protection Wall- 6.00m high )( Length = 320.00m)
-
-
-
... More
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
1697.28
-
-
... More
PCC 1:3:6 in Foundation
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
124.8
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
3072
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granular material
712.8
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
448
-
-
... More
(SH:- RCC Retaining Wall of Height 6.00mt & legth=130.00m) )
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material Ordinary soil
A) Manual Means
i) Depth upto 3 m (without de-watering)
352.25
-
-
... More
Ordinary Rock (not requiring blasting)
A) Manual Means
i) Depth upto 3 m (without de-watering)
234.83
-
-
... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
51.05
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
PCC Grade M20
51.05
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications
RCC Grade M25
Using Concrete Mixer. Height upto 5m
414.38
-
-
... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
RCC Grade M25
Using Concrete Mixer. Height 5.00m to 10.00m
13.75
-
-
... More
Reinforcement of RCC work including bending, binding and placing in position complete.
b) Tar/ TMT Steel
32853.32
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
1496.14
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical
286
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements