Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date11 Oct 2024
Closing Date25 Oct 2024
Tender AmountRefer Documents
Costs
EMD
₹ 9,25,586Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1961_1Bid Award Id
ViewTender No
SGMD/eNIT/SGM/2024-2025/001Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachalpwd.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
SH : (RCC Retaining Wall - 4.00 Mtr Ht.)
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.)
Ordinary soil
Manual Means (Depth upto 3 m)
548.05
10
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
43.91
10
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
RCC Grade M 20 (Height up to 5 M)
30.68
10
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
2.02
10
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
31
10
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular Materials
19.52
10
-
... More
SH:- B/Wall 10.00m length & 3.80m height
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
I. Ordinary soil
A. Manual Means i. Depth upto 3 m
30.78
10
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
3.42
10
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
b. Random Rubble Masonry
23.33
10
-
... More
Dry rubble Flooring
25.69
10
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular Materials
6.88
10
-
... More
SH:- RCC CULVERT (1.00 mtr Span 1.5 mtr height
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.
Ordinary soil
Manual Means
upto 3 m depth
95.88
10
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
22.8
10
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed Rubble Masonary( First Short)
61.84
10
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20 (Height up to 5m)
0.54
10
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
2.72
10
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
0.54
10
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specification.
36
10
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
4.13
10
-
... More
SH:RCC STEEL COMPOSITE BRIDGE
-
-
-
... More
(i) SUB-STRUCTURE
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
i.Ordinary soil
A.Manual Means (Depth 3-6 m)
504
10
-
... More
ii. Ordinary rock (not requiring blasting)
A.Manual Means (Depth upto 3 m)
504
10
-
... More
iii. Hard rock (requiring blasting)
A.Manual Means
252
10
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
54.72
10
-
... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications
34.44
10
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
F.RCC Grade M25
p.Height upto 5m
Case-I:Using concrete Mixer
470.53
10
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
G.RCC Grade M30
r.Height above 10m
Case-I:Using concrete Mixer
20.06
10
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A. Granular Materials
1046.15
10
-
... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.
181.34
10
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
236
10
-
... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.
122400
10
-
... More
ii. SUPER STRUCTURE
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
C.RCC Grade M30
Case-I:Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c) Height above 10m
37.5
10
-
... More
PSC Grade M-40
Case-I:Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c) Height 5 to 10m
42
10
-
... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification
10.4
10
-
... More
M30 Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification
10.4
10
-
... More
a) Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
21.86
10
-
... More
Elastomeric Slab Steel Expansion Joint (Providing and laying of an elastomeric slab steel expansion joint, catering to right or skew (less than 20 deg., moderately curved with maximum horizontal movement upto 50 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation and clause 2606 of MoRTH specifications for road & bridge works.)
12
10
-
... More
Drainage Spouts complete as per drawing and Technical specification
50
10
-
... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications
12.75
10
-
... More
Structural steel work such as bearing plate, 100mm Ø steel tube & HT bolt 50mm Ø as per direction of Engineer incharge and drawing.(Steel work similar to item 12.10 for cutting edge has been consicerded for rate)
At crash barrier pipe rail hoisting and placing etc
2.27
10
-
... More
Supply and fabrication of steel work at Fabricators workshop comprising of Main Girders, Cross Girders, Connecting plates, stringer, stiffening plates etc. and delivered at bridge site in undamaged condition including straightening, descaling, degreasing, cutting to size and shape, drilling, welding and grinding, supply of all MS/HTS shop or site bolts, nuts & washers, holding down bolts and nuts etc., trial assembling at workshop, one priming coat of shop paint with red lead paint conforming to IS-102 with all labour, material, cost of paints, consumables, etc. complete as per specification and as directed by the Engineer-in-Charge
72.22
10
-
... More
Taking delivery of fabricated steelwork, leading to and at site as necessary, assembling and erection of fabricated steel structure to proper line , level and camber as per approved drawings complete in all respect including transportation and handling in and specification including supply of all fasterners, painting of all exposed surfaces of steelwork after erection with one site coat of red lead to IS-102 and two coats Alumunimium paint to IS-2339, grouting of anchor bolts in position, including all labour, consumables, materials, machinery, tools and tackles complete as per specification and as directed by the Engineer-in-Charge
Case-I:up to 40m single span or in multiples
72.22
10
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements