Public Works Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date4 Mar 2024
Closing Date11 Mar 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Close Graded Material (Table:- 400-1) . Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 ).

-

-

-

... More
For grading- I Material.

832.57

-

-

... More
Add for carriage

-

-

-

... More
R.C.C. Toe Wall 2.50mtr. Ht.

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material).

-

-

-

... More
Ordinary soil

-

-

-

... More
Manual Means

-

-

-

... More
upto 3 m depth

1708.2

-

-

... More
Dry rubble Flooring…..

213.53

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days).

213.37

-

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications.

-

-

-

... More
R.C.C. Grade M20.

-

-

-

... More
Case I, Using concrete mixer .

1077.86

-

-

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.

48.47

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.

948

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification .

-

-

-

... More
Granular material.

1244.25

-

-

... More
Add for carriage

-

-

-

... More
SH : R.C.C. Box Culvert 6.00m Span - 4.00m height with Wing walls

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material

-

-

-

... More
Manual Means

-

-

-

... More
Depth upto 3 m

369.48

-

-

... More
Dry rubble Flooring

31.41

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

17.46

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.

-

-

-

... More
RCC Grade M20

171.47

-

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification

-

-

-

... More
Using Concrete Mixer

-

-

-

... More
Height upto 5m

29.74

-

-

... More
Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

28.2

-

-

... More
Providing and laying filter media behind abutment and return wall, complete as per drawings and Technical Specifications Section 1200.

175.2

-

-

... More
Providing and laying of boulder apron for bed protection in U/S and D/S protection work complete as per drawing and Technical specifications clause 1300.

31.05

-

-

... More
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.

12.12

-

-

... More
Providing & fixing in position HYSD (TMT) reinforcement bars in superstrucutre complete as per drawings and Technical Specifications Section 1000.

2.65

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

32

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification . A)- Granular material.

169.92

-

-

... More
Add carriage charge

-

-

-

... More
S:H:- R.C.C. Cause way

-

-

-

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material

-

-

-

... More
Manual Means

-

-

-

... More
Depth upto 3 m

172.46

-

-

... More
Dry rubble Flooring

26.42

-

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

13.22

-

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.

-

-

-

... More
RCC Grade M20

74.52

-

-

... More
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.

6.73

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.