Public Works Department Tender

... More
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date10 Mar 2025
Closing Soon17 Mar 2025
Tender Amount₹ 8,00,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401) (i)For grading- I Material

4273.5

-

-

... More
Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2

1943

-

-

... More
Add for cartage from quarry to work site (lead -10.7 Km) Boulder, sand & Shingle =

5512.82

-

-

... More
Loading and unloading of stone boulder / stone aggregates / sand /kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) For Hill Roads

5512.82

-

-

... More
SH : WMM

-

-

-

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

2913.75

-

-

... More
Add for cartage from quarry to work site (lead -10.7 Km) Boulder, sand & Shingle =

3846.2

-

-

... More
Loading and unloading of stone boulder / stone aggregates / sand /kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) For Hill Roads

3846.2

-

-

... More
SH : DGBM

-

-

-

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) (ii) Grading -II

728.44

-

-

... More
Add for cartage from quarry to work site (lead -10.7 Km) Boulder, sand & Shingle =

1085.38

-

-

... More
Loading and unloading of stone boulder / stone aggregates / sand /kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) For Hill Roads

1085.38

-

-

... More
SH : Bituminous Concrete

-

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)

14568.75

-

-

... More
Tack coat Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

14568.75

-

-

... More
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects (i) for Grading-I ( 13 mm nominal size )

582.75

-

-

... More
Add for cartage of Bitumen from Guwahati to Pasighat = Lead - 625 km

151.7

-

-

... More
Add for cartage of Bitumen from Pasighat to site of work via boleng= Lead - 156.0 km

151.7

-

-

... More
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe / Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.

151.7

-

-

... More
Add for cartage from quarry to work site (lead -10.7 Km) Boulder, sand & Shingle =

879.95

-

-

... More
Loading and unloading of stone boulder / stone aggregates / sand /kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) For Hill Roads

879.95

-

-

... More
SH : Slab Culvert 1 mtr span

-

-

-

... More
Excavation for Structures (Earthwork in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I-Ordinary soil B-Mechanical Means (i) Depth up to 3 m

96

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

16.22

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )

91.72

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20

4.72

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in substructure complete as per drawing and technical specifications

0.86

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. A Granular material.

50.7

-

-

... More
Providing weep holes in Brick masonry/ Plain /Reinforced concrete abutment, wing wall/ return wall with 100mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

40

-

-

... More
FOR PLAIN ROADS 1.4 Cost of Haulage Excluding Loading and Unloading (i) Surfaced Road Add for cartage from Guwahati to Pasighat (lead -625 Km) Steel

0.9

-

-

... More
FOR PLAIN ROADS 1.4 Cost of Haulage Excluding Loading and Unloading (i) Surfaced Road Add for cartage from Silapathar to Pasighat (lead -104 Km) cement

19.66

-

-

... More
FOR HILL ROADS Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. (i) Surfaced Road Add for cartage from Pasighat to work site (lead -52.00 Km) Steel & Cement = For Hill Roads

20.56

-

-

... More
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.

20.56

-

-

... More
Add for cartage from quarry to work site (lead - 10.7 Km) Boulder, sand & Shingle .

219.08

-

-

... More
Loading and unloading of stone boulder / stone aggregates / sand /kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) For Hill Roads

219.08

-

-

... More
SH : C.C DRAIN

-

-

-

... More
Excavation for structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material) II Ordinary rock (not requiring blasting) B) Mechanical means (i) Depth upto 3 m ( without de-watering)

8002.8

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

3062.8

-

-

... More
FOR PLAIN ROADS 1.4 Cost of Haulage Excluding Loading and Unloading (i) Surfaced Road Add for cartage from Silapathar to Pasighat (lead -104 Km) cement

704.44

-

-

... More
FOR HILL ROADS Cost of Haulage Excluding Loading and Unloading on hill roads. Haulage of materials by tipper excluding cost of loading, unloading and stacking. (i) Surfaced Road Add for cartage from Pasighat to work site via Boleng (lead -156 Km) Steel & Cement = For Hill Roads

704.44

-

-

... More
Loading and Unloading of Cement / Steel / Structural Steel / RC Pipe /Wooden Logs / Bricks / Bitumen and Timber etc, by Manual Means and Stacking for hill roads.

704.44

-

-

... More
(iv) Add for cartage from quarry to work site (lead - 10.7 Km) Boulder, sand & Shingle =

4134.78

-

-

... More
Loading and unloading of stone boulder / stone aggregates / sand /kanker / moorum. (Placing tipper at loading point, loading with front end loader, dumping, turning for return trip, excluding time for haulage and return trip) For Hill Roads

4134.78

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.