Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date12 Mar 2024
Closing Date18 Mar 2024
Tender Amount₹ 98,60,610
Costs
EMD
₹ 98,610Document Cost
₹ 1,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1826_1Bid Award Id
ViewTender No
SGMD/NIT/W-46/2023-2024 /03Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachalpwd.org
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Excavation in Ordinary Rock by Manual Means Excavation in Ordinary Rock with Dozer with lead upto 100 metres (Excavation for roadway in ordinary rock by deploying a dozer, 80 HP including cutting and pushing the cut earth to site of embankment upto a distance of 100 metres ( average lead 50 metres ), trimming bottom and side slopes in accordance with the requirements of lines, grades and cross sections.)
11935.58
-
10
... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
5967.79
-
10
... More
SH-II:Cross Drainage(RCC slab culvert 1.00 Mtr span 1.50 Mtr Height)
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I. Ordinary soil
A. Manual Means
i) upto 3 m depth
343.5
-
10
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
53.19
-
10
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
136.38
-
10
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20
Height upto 5m
12.96
-
10
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
10.04
-
10
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
1.03
-
10
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
42
-
10
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
60
-
10
... More
SH-II:Cross Drainage(RCC slab culvert 2.00 Mtr span 2.00 Mtr Height)
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
I. Ordinary soil
A. Manual Means
i) upto 3 m depth
92.7
-
10
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
23.12
-
10
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Coursed rubble masonry (first sort )
77.36
-
10
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications
PCC Grade M20
Height upto 5m
0.96
-
10
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
For solid slab super-structure, 20-30% of (a+b+c)
Height upto 5m
5.18
-
10
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
0.75
-
10
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
52.65
-
10
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
40
-
10
... More
SH-III:- Kutcha Drain) (1.00 km)
-
-
-
... More
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres)
(A) Mechanical means
570
-
10
... More
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.
(A) Mechanical Means
430
-
10