Public Works Department Tender

... More
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Eprocure
Opening Date2 Nov 2020
Closing Date19 Nov 2020
Tender Amount₹ 9,91,00,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.)

212.64

-

-

... More
Sub-Head-II (Embankment)=5.00 KM

-

-

-

... More
Embankment Construction with Material Obtained from Borrow Pits (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2)

13858.32

-

-

... More
Sub-Head-III-Cross drainage work

-

-

-

... More
[RCC Slab Culvert ( Span-1 Mtrs span and abutment height - 1.50 Mtrs)]=12 Nos.

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Manual Means Upto 3.00 Mtr Depth.

689.76

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

178.2

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15 Height upto 5m

583.68

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

120

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications

5.4

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, Height upto 5m

24.96

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

5.4

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder

168

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material

168

-

-

... More
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

1464

-

-

... More
Loading and unloading of Cement & Steel by manual means.

216

-

-

... More
Cost of Haulage excluding loading & unloading Kutcha Track and Track in River bed/Nallah bed and choe bed.

7908

-

-

... More
Cartage of Cement/Steel to Site of work Surfaced Road

2160

-

-

... More
[RCC Slab Culvert ( Span-2 Mtrs span and abutment height - 1.50 Mtrs)]=3 Nos.

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Manual Means Upto 3.00 Mtr Depth.

194.04

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

50.3

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15 Height upto 5m

147.69

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

30

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications

2.49

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, Height upto 5m

13.18

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

2.7

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder

42

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material

42

-

-

... More
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

387

-

-

... More
Loading and unloading of Cement & Steel by manual means.

60

-

-

... More
Cost of Haulage excluding loading & unloading Kutcha Track and Track in River bed/Nallah bed and choe bed.

3676.5

-

-

... More
Cartage of Cement/Steel to Site of work Surfaced Road

600

-

-

... More
[RCC Slab Culvert ( Span-6 Mtrs span and abutment height -3.50 Mtrs)]=1 Nos.

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Manual Means Upto 3.00 Mtr Depth.

128.7

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 mix with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

33.36

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15 Height upto 5m

155.13

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

30

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications

2.62

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, Height upto 5m

20.79

-

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

2.7

-

-

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications Stone/Boulder

39

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material

39

-

-

... More
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

376

-

-

... More
Loading and unloading of Cement & Steel by manual means.

61

-

-

... More
Cost of Haulage excluding loading & unloading Kutcha Track and Track in River bed/Nallah bed and choe bed.

3572

-

-

... More
Cartage of Cement/Steel to Site of work Surfaced Road

35990

-

-

... More
Katcha Track and Track in river bed / nallah bed and choe bed

326.3

-

-

... More
SUB-HEAD-IV (PAVEMENT)

-

-

-

... More
GSB LAYER-5.86 Km (5.05 Mtr wide & 100mm thick)

-

-

-

... More
Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)

31188.41

-

-

... More
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.

31188.41

-

-

... More
Granular Sub-Base with Coarse Graded Material ( Table:- 400- 2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401)

2835.31

-

-

... More
WBM-II-5.86 Km (4.05 m width and 75mm thick)

-

-

-

... More
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) By Manual Means Grading- II (Using Screening Crushable type such as Moorum or Gravel) Using Screening Type-A (13.2mm Agg.)

2258

-

-

... More
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

2370.9

-

-

... More
Cost of Haulage Excluding Loading and Unloading Katcha Track and Track in river bed / nallah bed and choe bed

23602

-

-

... More
WBM-III-5.86 Km (4.05 m width and 75mm thick)

-

-

-

... More
Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) By Manual Means Grading- III (Using Screening Crushable type such as Moorum or Gravel) Using Screening Type-B (11.20 mm Agg.)

2258

-

-

... More
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

2370.9

-

-

... More
Cost of Haulage Excluding Loading and Unloading Katcha Track and Track in river bed / nallah bed and choe bed

23602

-

-

... More
SUB-HEAD-V-DENSE GRADED BITUMINOUS MACADAM-9.98 KM (3.75 MTR WIDTH) AND 75 MM THICK

-

-

-

... More
Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)

37320

-

-

... More
Teck Coat (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

37320

-

-

... More
Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects.) for Grading I ( 40 mm nominal size )

2799

-

-

... More
Loading and Unloading of Stone Boulder/Stone aggregates/Sand/Kanker/Moorum/Lime/Shingle/Surki/Earth/Excavated Rock and Kerb Stones by Manual Means for hill roads.

4030.56

-

-

... More
Cost of Haulage excluding loading & unloading Kutcha Track and Track in River bed/Nallah bed and choe bed.

38695

-

-

... More
SUB-HEAD-VI-SEAL COAT-9.98 KM (3.75 MTR WIDTH)

-

-

-

... More
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A and B seal coats)

-

-

-

... More
Case - II : Type B (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 75 tonnes/ hours using crushed stone chipping 6.7 mm size and penetration bitumen of suitable grade.)

37320

-

-

... More
Sub-Head - VI-PROTECTION WORK

-

-

-

... More
RCC Retaining wall 4 Mtrs height)=80.00 Mtr length.)

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Upto 3.00 Mtr Depth.

550.64

-

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

19.6

-

-

... More
Reinforced cement concrete in retaining wall (any thickness) including attached pillasters, buttresses, plinth and string courses, fillets etc from top of foundation up to floor two level excluding cost of centring,shuttering and reinforcement in : M20 (1 cement : 1.5 Coarse Sand : 3 stone aggregate 20 mm nominal size).

149.2

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

708.8

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete. Tar/TMT steel

7548.72

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material

96

-

-

... More
RCC Breast wall 4 Mtrs height)=42.00 Mtr length.)

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.) Ordinary Soil Manual Means Upto 3.00 Mtr Depth.

289.09

-

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

10.29

-

-

... More
Reinforced cement concrete in retaining wall (any thickness) including attached pillasters, buttresses, plinth and string courses, fillets etc from top of foundation up to floor two level excluding cost of centring,shuttering and reinforcement in : M20 (1 cement : 1.5 Coarse Sand : 3 stone aggregate 20 mm nominal size).

78.33

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for : Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

372.12

-

-

... More
Reinforcement of RCC work including bending, binding and placing in position complete. Tar/TMT steel

3963.08

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material

50.4

-

-

... More
Sub-Head - VII- (CC Drain)=6.64 Km. length.)

-

-

-

... More
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into sides of plinth, sides of foundation etc., consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 30 m.

2988

-

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 5 : 10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

398.4

-

-

... More
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in : Walls including attached buttresses, pilasters and their caps and bases and string courses etc. up to floor two level.

1533.84

-

-

... More
Centring and shuttering including strutting proping etc. and removal of form work for: Walls including attached buttresses, pilasters etc.

6241.6

-

-

... More
12 mm cement plaster 1 : 4 (1 cement : 4 fine sand) on the rough side of single or half brick wall.

10225.6

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.