Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date26 May 2023
Closing Date8 Jun 2023
Tender Amount₹ 9,89,84,107
Costs
EMD
₹ 9,89,841Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2023_PWDAP_1273_1Bid Award Id
ViewTender No
TD/W-12/RIDF-XXVIII/2023-24/01Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://www.arunachalpwd.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Excavation in Ordinary Rock by Manual Means
-
-
-
... More
Excavation in Hilly Area in Ordinary Rock by Manual Means (Excavation in Ordinary Rock using Manual Means including loading in a truck and carrying of excavated material to embankment site with a lift upto 1.5 m and lead upto 20 m as per Clause 1603.2.)
102447.99
-
-
... More
Excavation in Hard Rock (requiring blasting) with disposal upto 1000 metres
-
-
-
... More
Excavation for roadway in hard rock (requiring blasting) by drilling, blasting and breaking, trimming of bottom and side slopes in accordance with requirements of lines, grades and cross sections, loading and disposal of cut road with in all lifts and leads upto 1000 metres
28685.44
-
-
... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
65566.72
-
-
... More
SH:- CROSS DRAINAGE a) RCC S/ Culvert 2.00 m Span - 2.00 Ht)-15 Nos
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
1390.5
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
356.4
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
1317.75
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m
14.4
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
77.7
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
11.18
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
789.75
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
600
-
-
... More
b) RCC S/ Culvert 4.00 m Span - 2.00 Ht)-1 Nos
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
106.8
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
23.28
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
134.97
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m
0.96
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
18.3
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
1.45
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
30.24
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
60
-
-
... More
c) RCC S/ Culvert 6.00 m Span - 2.00 Ht)-1 Nos
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
106.8
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
23.28
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Coursed rubble masonry (first sort )
171.57
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M20 Height upto 5m
2.16
-
-
... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m
24.01
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
2.28
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
30.24
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
60
-
-
... More
SH:- Protection Works a) Retaining Wall=158.00M
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
608.77
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
27.02
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification Random Rubble Masonry
497.54
-
-
... More
Dry rubble Flooring
417.59
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material
59.25
-
-
... More
b) Breast Wall=140.00M
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) Ordinary soil Manual Means upto 3 m depth
539.42
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
23.94
-
-
... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification Random Rubble Masonry
440.86
-
-
... More
Dry rubble Flooring
370.02
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
52.5
-
-
... More
SH: Side Katcha Drain L=14.00 Km)
-
-
-
... More
Excavation in Soil by Manual Means. (Excavation for roadway in soil using manual means including loading in truck for carrying of cut earth to embankment site with all lifts and leads upto 1000 meters.)
3276
-
-
... More
Excavation in ordinary rock by Manual Means. (Excavation for roadway in ordinary rock using manual means including loading in truck for carrying of excavated material to embankment site with all lifts and leads upto 1000 meters.)
4914
-
-