Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1759_1Bid Award Id
ViewTender No
DD/2023-24/18Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachaltenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
(ii) Girth from 600 mm to 900 mm
20
-
-
(iii) Girth from 900 mm to 1800 mm
10
-
-
Clearing and Grubbing Road Land . (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stackin of serviceable material to be used or auctioned up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness.)
-
-
-
By Manual Means:-
-
-
-
A) In area of light jungle
4.8
-
-
B) In area of thorny jungle
3.2
-
-
SH:- Formation Cutting
-
-
-
Excavation in Hilly Areas in Soil by Manual Means (Excavation in soil in Hilly Area by Manual Means including cutting and trimming of side slopes and disposing of excavated earth with a lift upto 1.5 m and a lead upto 20 m as per drawing and Technical Specification Clause 1603.1)
41037.5
-
-
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
82075
-
-
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
82075
-
-
Deduction
-
-
-
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
61556.25
-
-
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
41037.5
-
-
Sub-Head:- RCC Box Culvert 2.00m Span - 2.00m height with Wing walls
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
-
-
-
Manual Means
-
-
-
Depth upto 3 m
1028.52
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
68.88
-
-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
-
-
-
RCC Grade M20
336.36
-
-
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
-
-
-
RCC Grade M20 , Using Concrete Mixer, Height upto 5m
125.28
-
-
Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
225.6
-
-
Providing and laying filter media behind abutment and return wall, complete as per drawings and Technical Specifications Section 1200.
384.36
-
-
Providing and laying of boulder apron for bed protection in U/S and D/S protection work complete as per drawing and Technical specifications clause 1300.
12.36
-
-
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.
46.2
-
-
Providing & fixing in position HYSD (TMT) reinforcement bars in superstrucutre complete as per drawings and Technical Specifications Section 1000.
14.64
-
-
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
576
-
-
Sub-Head:- RCC Box Culvert 5.00m Span - 4.00m height with Wing walls
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
-
-
-
Manual Means
-
-
-
Depth upto 3 m
805.92
-
-
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
33.63
-
-
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
-
-
-
RCC Grade M20
103.62
-
-
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
-
-
-
RCC Grade M20
-
-
-
Using Concrete Mixer
-
-
-
Height upto 5m
63.72
-
-
Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
71.4
-
-
Providing and laying filter media behind abutment and return wall, complete as per drawings and Technical Specifications Section 1200.
148.74
-
-
Providing and laying of boulder apron for bed protection in U/S and D/S protection work complete as per drawing and Technical specifications clause 1300.
8.79
-
-
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.
18.36
-
-
Providing & fixing in position HYSD (TMT) reinforcement bars in superstrucutre complete as per drawings and Technical Specifications Section 1000.
7.44
-
-
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
120
-
-
Sub-Head:- Retaning Wall of Height 3.00m. (R.R.M.)
-
-
-
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
-
-
-
Ordinary soil, Manual Means, upto 3 m depth
586.1
-
-
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
65.61
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
-
-
-
Random Rubble Masonry
814.92
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
-
-
-
Granular material
406.5
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
764
-
-
Sub-Head:-Breast Wall of Height 3.00m. (R.R.M.)
-
-
-
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
-
-
-
Ordinary soil, Manual Means, upto 3 m depth
456.12
-
-
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
50.68
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
-
-
-
Random Rubble Masonry
638.7
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification
-
-
-
Granular material
319.07
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
587.6
-
-
SH:- C.C. Drain 60cm wide
-
-
-
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.)
-
-
-
Ordinary soil
-
-
-
Manual Means
-
-
-
upto 3 m depth
5994.1
-
-
Dry rubble Flooring
1284.45
-
-
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
2397.64
-
-
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications
-
-
-
PCC Grade M20.
-
-
-
Using concrete mixer
256.89
-
-
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
16269.7
-
-
Cement Neat Punning…..
16269.7
-
-