Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Road Construction
Eprocure
Opening Date2 Jan 2025
Closing Date14 Jan 2025
Tender AmountRefer Documents
Costs
EMD
₹ 9,75,084Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
C/o Road From Beye To Piri Village, West Siang District(ph-i) Under Crif
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_PWDAP_2039_1Bid Award Id
ViewTender No
AD/W/CRIF/03/2024-25/2097 dtd 31/12/2024Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://http://www.arunachalpwd.org/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
SH:- SLAB CULVERT 1 M SPAN
-
-
-
... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering).
(i) Ordinary soil (A) Manual Means (Depth upto 3 m)
802
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
53.2
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications, (i) Coursed rubble masonry (first sort )
32.4
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications.
(A) RCC Grade M20, Using Conrete Mixer (p) Height upto 5 Mtr.
208.8
-
-
... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification, Using Concrete Mixer, RCC Grade M25
31.2
-
-
... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications
15.47
-
-
... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
400
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (A) Granular Material
308
-
-
... More
SH:- CRM RETAINING WALL(3.50M Ht.)
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.).,
Ordinary soil., Manual Means., Upto 3 mtr depth
200
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
22
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications., (b) Coursed Rubble Masonry (First short)
216.3
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
75
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications(PCC Grade M-15)
3
-
-
... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical specifications
57.3
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification., Sandy material
63.75
-
-
... More
SH:- CRM BREAST WALL(2.50M Ht.)
-
-
-
... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.).,
Ordinary soil., Manual Means., Upto 3 mtr depth
224
-
-
... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)
23.1
-
-
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications., (b) Coursed Rubble Masonry (First short)
161
-
-
... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.
105
-
-
... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications(PCC Grade M-15)
7
-
-
... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification., Sandy material
63
-
-
... More
SH:- UNLINED SURFACE DRAIN
-
-
-
... More
Surface Drains in Soil (Construction of unlined surface drains of average cross sectional area 0.40 sqm in soil to specified lines, grades, levels and dimensions to the requirement of clause 301 and 309. Excavated material to be used in embankment within a lead of50 metres (average lead 25 metres)). (A) Mechanical Means
6312
-
-
... More
Surface Drains in Ordinary Rock (Construction of unlined surface drain of average cross sectional area 0.4 sqm in ordinary rock to specified lines, grades, levels and dimensions as per approved design and to the requirement of clause 301 to 309. Excavated material to be used in embankment at site.) (A) Mechanical Means
1578
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements