Public Works Department Tender

... More
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date22 Mar 2025
Closing Soon5 Apr 2025
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.

4417.5

10

-

... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.

1104.38

10

-

... More
SH: II: CROSS DRAINAGE

-

-

-

... More
R.C.C. Box Culvert 1.00 Mtr Span - 1.50 Mtr Height = 2 Nos Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. i.Manual Means a.Depth upto 3 m

140.86

10

-

... More
Providing and laying boulders Solling for bed for protection against scour with stone boulders weighing not less than 05kg each complete as per drawing and Technical specification.

12.84

10

-

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

11.92

10

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. A.RCC Grade M30

28.6

10

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. A.RCC Grade M20

26.88

10

-

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification a. RCC Grade M20 , Using Concrete Mixer, Height upto 5m

5.2

10

-

... More
Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

5.2

10

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.

17.02

10

-

... More
Providing and laying of boulder apron for bed protection in U/S and D/S protection work complete as per drawing and Technical specifications clause 1300.

6.14

10

-

... More
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.

4.28

10

-

... More
Providing & fixing in position HYSD (TMT) reinforcement bars in superstrucutre complete as per drawings and Technical Specifications Section 1000.

1.6

10

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

52

10

-

... More
SH:III-Protection Works

-

-

-

... More
SH:- C/o R.C.C. Retaing Wall 4.00 Mtr Height=78 m Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material). I.Ordinary soil A.Manual Means i.upto 3 m depth

227.14

10

-

... More
Dry rubble Flooring complete as per drawing and Technical specification.

31.67

10

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

19.11

10

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. a.R.C.C. Grade M20. Case I, Using concrete mixer.

147.81

10

-

... More
Centring and shuttering including strutting proping etc. and removal of form work for: a.Foundations and plinth.

58.81

10

-

... More
Walls including attached buttresses, pilasters etc.

578.45

10

-

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.

7.72

10

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.

156

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. a. Granular material

20.87

10

-

... More
SH:- C/o R.C.C. Breast Wall 3.00 Mtr Height)=40 m Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material). I.Ordinary soil A.Manual Means i.upto 3 m depth

89.84

10

-

... More
Dry rubble Flooring complete as per drawing and Technical specification.

14.96

10

-

... More
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.

8.96

10

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications. a.R.C.C. Grade M20. Case I, Using concrete mixer.

50.44

10

-

... More
Centring and shuttering including strutting proping etc. and removal of form work for: a.Foundations and plinth.

26.04

10

-

... More
Walls including attached buttresses, pilasters etc.

217.92

10

-

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.

2.38

10

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications.

80

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification. a. Granular material

10.08

10

-

... More
SH:IV-Pavement(0.595 km)

-

-

-

... More
Granular Sub-base (150 mm thick)=0.595 Preparation of sub grade (Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.)

5435.33

10

-

... More
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.

5435.33

10

-

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Plant Mix Method (Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401) A.By Manual Means

815.3

10

-

... More
WBM-I Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) By Mechanical Means: Grading- I (Using Screening Crushable type such as Moorum or Gravel), Using Screening Type-A (13.2 mm Agg.)

468.56

10

-

... More
WBM-II Water Bound Macadam (Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with vibratory roller 8-10 tonnes in stages to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting to the required density.) b.By Mechanical Means: Grading- II (Using Screening Crushable type such as Moorum or Gravel), Using Screening Type-A (13.2mm Agg.)

351.42

10

-

... More
WBM-III By Mechanical Means: Grading- III (Using Screening Crushable type such as Moorum or Gravel), Using Screening Type-A (13.2mm Agg.)

351.42

10

-

... More
Carpeting (DBM & BM) Prime coat Prime coat (Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means.)

4685.63

10

-

... More
Dense Bituminous Macadam Dense Graded Bituminous Macadam (Providing and laying dense bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5% by weight of total mix of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 507 complete in all respects) i. for GradingII(19 mm nominal size)

304.57

10

-

... More
b.Tack coat Tack coat - Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 Kg per Sqm on the prepared bituminous/ granular surface cleaned with mechanical broom.

4685.63

10

-

... More
BM Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 % of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects) for Grading-II (10 mm nominal size)

140.57

10

-

... More
SH:V- C. C. Drain 0.60 mtr. Wide

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I.Ordinary soil A.Manual Means i.upto 3 m depth

550

10

-

... More
Providing and laying boulders Solling for bed for protection against scour with stone boulders weighing not less than 05kg each complete as per drawing and Technical specification.

82.5

10

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

55

10

-

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specifications a.PCC Grade M15

153.5

10

-

... More
Steel work in single section including cutting, hoisting, fixing in position and applying a priming coat of red lead paint. A.In Tees, Angles and Channels

150.01

10

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

200

10

-

... More
12mm Cement Plaster in CM..1:4..

1050

10

-

... More
Cement Neat Punning…..

1050

10

-

... More
SH:VI-Road sign board and Km. stone

-

-

-

... More
Direction and Place Identification signs with size more than 0.9 sqm size board. (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing).

5.82

10

-

... More
Painting Lines, Dashes, Arrows etc on Roads in Two Coats on New Work (Painting lines, dashes, arrows etc on roads in two coats on new work with ready mixed road marking paint conforming to IS:164 on bituminous surface, including cleaning the surface of all dirt, dust and other foreign matter, demarcation at site and traffic control ) i.Over 10 cm in width.

877.5

10

-

... More
SH:VII-Steel Girder Composite Bridge=01 Job

-

-

-

... More
SH-1:FOUNDATION Excavation for Structures i(b)Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing sides and bottom and backfilling with approved material (with de-watering) a.Ordinary Soil (Mechanical Means) - Depth 3 m to 6 m

1139.55

10

-

... More
b.Ordinary rock (not requiring blasting) - Mechanical Means (Depth up to 3 m)

759.07

10

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15

71.06

10

-

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. Using Batching Plant, Transit Mixer and Concrete Pump RCC Grade M 30

238.08

10

-

... More
Supplying, fitting and placing un-coated HYSD bar reinforcement in foundation complete as per Drawing and Technical Specifications

8.83

10

-

... More
SH:2-SUB - STRUCTURE Plain/Reinforced Cement Concretein Sub structure complete as per drawing Technical Specifications RCC Grade M 30 With Batching Plant, Transit Mixer and Concrete Pump Height 5m to 10 m

222.06

10

-

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

30.76

10

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

92

10

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification A.Granular Material

654.86

10

-

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

374.42

10

-

... More
Supplying, fitting and fixing in position true to line and level sliding plate bearing with PTFE surface sliding on stainless steel complete including all accessories as per drawing and Technical Specifications and BS :5400. section 9.1 & 9.2 (for PTFE) and clause 2004 of MoRTH Specifications.

2

10

-

... More
SH:3-SUPER - STRUCTURE Furnishing and placing a reinforced / prestressed cement concrete in super- structure as per drawing and Technical Specification. C.RCC Grade M 30 Using Batching Plant, Transit Mixer and Concrete Pump i.For Solid Slab Super-structure p.Height up to 5m

171.02

10

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and Technical Specifications

30.21

10

-

... More
Reinforced Cement Concrete Crash Barrier Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-35 grade concrete with HYSD reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which it is built and installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at locations directed by the Engineer, all as specified

101.08

10

-

... More
Type - B, "THRIE" : Metal Beam Crash Barrier Providing and erecting a "Thrie" metal beam crash barrier comprising of 3 mm thick corrugated sheet metal beam rail, 85 cm above road/ground level, fixed on ISMC series channel vertical post, 150 x 75 x 5 mm spaced 2 m centre to centre, 2 m high with 1.15 m below ground level, all steel parts and fitments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixed on the vertical post with a space of channel section 150 x 75 x 5 mm, 546 mm long complete as per clause 810

20.6

10

-

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

28.63

10

-

... More
Drainage Spouts complete as per drawing and Technical specification

20

10

-

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification

11.09

10

-

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. (Cement Concrete M 30 Grade)

32.59

10

-

... More
Painting on concrete surface Providing and applying 2 coats of water based cement paint to unplastered concrete surface after cleaning the surface of dirt, dust, oil, grease, efflorescence and applying paint @ of 1 litre for 2 sqm.

701.73

10

-

... More
Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.

20

10

-

... More
Supply and fabrication of steel work at fabricators workshop comprising of main griders, cross griders connecting plates, stringers,stiffening plates etc. from steel plates and structural steel of specified grades as per approved drawing including straightening, decaling, degreasing cutting to size and shape drilling welding and grinding supply of all MS/HTS shop or site bolts nuts & washers, holding down bolts and nuts etc. trail assembling at workshop one priming coat of shop paint with red lead paint conforming to IS-102 with all labour material cost of paints consumables stacking in protected condition etc complete as per specification and as directed by the Engineer in charge (Carriage cost from fabricator workshop to actual bridge site will be paid separately).

269.75

10

-

... More
Haulage of materials by mechnical transport from source (Guwahati, Assam) to Site of work including cost of loading, unloading and stacking as per direction of Engineer-in-Charge.

269.75

10

-

... More
Taking delivery fo fabricated steel work from stacks at site as necessary assemblimg and erection at site as necessary assembling and erection of fabricated steel structure to proper line level and camber as per approved drawing complete in asll respect including transportation and handling supply of all fastener. painting of all exposed surfaces of steel work after erection with one coat or red lead conforming to IS-102 and two coats Aluminium paint to IS-2339, grouting of anchor bolts in position including all lobour consumables material machinery tools and tackles complete as per specification and as directed by the Engineer fin charge

269.75

10

-

... More
Load Testing of Super structure of bridge after completion in all respect using static loading method to determine accpectance criteria of design as per IRC:SP:51-2015 complete as per direction of Engineer- In-Charge.

1

10

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.