Public Works Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Works Department - PWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Jul 2024
Closing Date26 Jul 2024
Tender Amount₹ 10,43,80,300 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )

29771.77

-

-

... More
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)

19847.85

-

-

... More
SH:- GSB LAYING

-

-

-

... More
Preparation of sub grade by excavating earth to an average depth of 22.50 cm, dressing to camber and consolidating with road roller, making good the undulations etc. and disposal of surplus earth, lead upto 50 m.

12631.5

-

-

... More
Consolidation of sub-grade with road roller of 8 to 12 tonne capacity including making good the undulations etc. with earth or quarry spoils etc. and rerolling the sub grade.

12631.5

-

-

... More
Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-I Material

947.37

-

-

... More
Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by Plant Mix Method providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401 c) Material For Grading-II Material

947.37

-

-

... More
SH:- RCC BOX CULVERT (1.50x1.50 m) - 05 Nos

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means upto 3 m depth

203.33

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

25.48

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for (a) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

266

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height).

57

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15 Height upto 5m

76.65

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

22.05

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

4.88

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical sp

100

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material

279.3

-

-

... More
15mm cement plater 1:6 (1 cement : 6 fine sand)

226.2

-

-

... More
SH:- RCC BOX CULVERT (2.0x2.0 m) - 02 Nos

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means upto 3 m depth

121.68

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

11.24

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for (a) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

112

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height).

28

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15 Height upto 5m

30.66

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

10.92

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

2.22

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical sp

40

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material

231.42

-

-

... More
15mm cement plater 1:6 (1 cement : 6 fine sand)

117

-

-

... More
SH:- RCC BOX CULVERT (3.0x3.0 m) - 01 No.

-

-

-

... More
Excavation for Structures (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means upto 3 m depth

100.98

-

-

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

6.86

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for (a) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.

92.4

-

-

... More
Centring and shuttering including strutting, propping etc and removal of form work for c) Suspended floors, roofs, landings shelves and their supports, balconies and chajjas (3.5 m height).

21

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC Grade M15 Height upto 5m

23.13

-

-

... More
Furnishing and Placing Reinforced/Prestressed cement concrete in super-structure as per drawing and Technical Specification RCC Grade M20 Using Concrete Mixer For solid slab super-structure, 20-30% of (a+b+c) Height upto 5m

7.56

-

-

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.73

-

-

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical sp

30

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification a) Granular material

91.41

-

-

... More
15mm cement plater 1:6 (1 cement : 6 fine sand)

66.5

-

-

... More
SH:- RCC Bridge (25.00 Mtr Span) - 01 No.

-

-

-

... More
Foundation

1

-

-

... More
Substructure( on both banks)

1

-

-

... More
Superstructure

1

-

-

... More
Approach Road

1

-

-

... More
Protection Works

1

-

-

... More
Laying and Jointing PVC Pipe. Heading

-

-

-

... More
Excavation for structures ( Earth work in excavation of foundation of structures as per drawing and technically specification, including setting out, construction of shoing and bracing, removal of stumps and other deletenious matter, dressing of sides and bottom and backfilling with approved material) Ordinary Soil Mechanical means Depth upto 3.0m (With De-wataring)

543.05

-

-

... More
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

42.87

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M 15 Height upto 5 m

600.22

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. Random Rubble Masonry

63.93

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granualar material

23.69

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical

150

-

-

... More
SH:- BREAST WALL - 259.501 M

-

-

-

... More
Excavation for structures ( Earth work in excavation of foundation of structures as per drawing and technically specification, including setting out, construction of shoing and bracing, removal of stumps and other deletenious matter, dressing of sides and bottom and backfilling with approved material) Ordinary Soil Mechanical means Depth upto 3.0m (With De-wataring)

583.88

-

-

... More
PCC 1:3:6 in foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crusged stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

58.39

-

-

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications PCC Grade M 15 Height upto 5 m

797.97

-

-

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications. Random Rubble Masonry

110.29

-

-

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification A) Granualar material

42.82

-

-

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical

260

-

-

... More
SIDE DRAIN-2.975Km

-

-

-

... More
Earth work in excavation in foundation and trenches etc. in all kinds of soil (excluding soil containing 50% or more of shingle or small size boulders upto 30 cm size, saturated soil and rock), lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers, when required, into plinth sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus soil as directed within a lead of 50m.

2231.25

-

-

... More
Providing and laying cement concrete 1 : 3 : 6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) excluding the cost of centring an shuttering in: a) Foundations and plinth

602.44

-

-

... More
Centering and shuttering including strutting , propping etc, and removal of form work for :- b) Walls including attached buttresses, pilasters etc.

6247.5

-

-

... More
12 mm Cement plaster in CM 1:4 (1 Cement : 4 Sand)

4908.75

-

-

... More
Neat Cement Punning

4908.75

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.