Public Works Department Tender
BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.
Public Works Department - PWD Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date7 Feb 2024
Closing Date12 Feb 2024
Tender Amount₹ 1,97,08,042
Costs
EMD
₹ 1,97,080Document Cost
₹ 2,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_PWDAP_1656_1Bid Award Id
ViewTender No
BDL/TandA-23/BDL/2023-24/196Tender Authority
Public Works Department ViewPurchaser Address
-Website
http://arunachaltenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
249.21
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular material
45
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
35
-
-
(SH :- RRM Retaining Wall - 4.00 mtr ht. & 28.10 mtr Length)
-
-
-
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
70.33
-
-
PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
7.64
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
123.64
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular material
21.08
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
16
-
-
(SH :- RRM Retaining Wall - 3.00 mtr ht. & 15.00 mtr Length)
-
-
-
Excavation for Structures
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
44.55
-
-
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
4.05
-
-
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification
Random Rubble Masonry
49.5
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification (A) Granular material
7.5
-
-
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
14
-
-
(SH:- Storm water drain of Length 227.85m) ( Section B :- Internal size:- Bottom-1.00, Top-1.875 & Depth 1.75 Mtr. )
-
-
-
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering)
Manual Means
Depth upto 3 m
1144.43
-
-
Dry rubble Flooring
84.3
-
-
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
84.3
-
-
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications
Random Rubble Masonry
359.78
-
-
Providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.50 coarse sand : 3 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :
a) Foundations and plinth
54.11
-
-
15 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
1253.18
-
-
Neat cement punning.
1253.18
-
-
Centring and shuttering including strutting proping etc. and removal of form work for : foundation and plinth.
273.42
-
-
Carriage of Engineering materials by manual means (Head Load) like Cement, Steel, CGI sheet, Stone, Sand etc as per the direction of Engineer-incharge.(Lead=0.145Km)
1638431.32
-
-
( SH :-RCC Wall 10.00 m Height & 28.00 m Length)
-
-
-
Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, into plinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
670.52
-
-
Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
20.31
-
-
Centring and shuttering including strutting, propping etc and removal of form work for :
a) Foundation, footings, bases of columns etc. and mass concrete.
125.35
-
-
b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
881.94
-
-
Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcement in :1 : 1: 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size) M25.
146.44
-
-
Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :
1 : 1: 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size) M25.
222.07
-
-
Reinforcement of RCC work including bending, binding and placing in position complete.
b) Tar/ TMT Steel
22743.5
-
-
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specification Granular material
264.6
-
-
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
126
-
-