Public Health Engineering And Water Supply Department Tender

BidAssist is a very user-friendly website that helps us to explore all the new opportunities so as to achieve growth in our business. It helps us to attain all the information with respect to any e-tender the Arunachal Pradesh government has posted on its website in a very hassle-free manner.

Public Health Engineering And Water Supply Department Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date2 Dec 2024
Closing Date16 Dec 2024
Tender Amount₹ 24,95,56,535 
Notes
Download

Costs

Summary

Augmentation And Improvement Of Water Supply At Kanubari Town Under Amrut 2.0 (1.60 Mld)

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Procurement of HDPE fittings for Zonal lines: ISI Marked HDPE fittings shall be procured for proper alignment and sealing of joints as per requirement and shall be use during laying, fitting and fixing of pipeline.

1

-

-

... More
C/o drop inlet type Headwork: -

-

-

-

... More
C/o drop inlet type Headwork: - RCC drop inlet type Headwork will be constructed across the stream. First the stream will be diverted to some other route and then the construction activity will begin. The D.I pipe will convey the water from headwork intake tank to Pre-Sedimentation Tank

1

-

-

... More
Formation cutting for main pipe line (Ch. 10110 mtrs to 12480 mtrs): - Formation cutting for D.I main pipe line of 2370 mtrs and width 5 mtrs should be carried out with proper specification

1

-

-

... More
Construction of Pre-Sedimentation tank:

-

-

-

... More
Construction of Desilting tank: - A Desilting tank has been provided with detention period of 1 hour

1

-

-

... More
Construction of Security Fencing around desilting tank: - Chain link fencing of height 1.8 mtrs bottom embedded in CC with Angle Iron posts and MS Gate.

1

-

-

... More
C/o Aerator and flash mixture: - The water will then pass through a Cascade Aerator, so that any odour or carbon dioxide impurities are removed. The cascade aerator shall have 4 nos. steps rise of each step of 40 cm. The water shall be collected in a channel and then led to Sedimentation by flash mixture with channel.

1

-

-

... More
C/o Sedimentation tank: The water from the Aerator will enter the sedimentation tank, where all fine suspended particles will be removed. There will be no mechanical devices or any electrically operated equipment. The floc chamber and the settling chamber will be separated by a baffle wall. The deposited sludge will be removed through drain valve provided in the bottom.

1

-

-

... More
C/o RCC Clariflocculator: - The provision of Clariflocculation tank has been kept for removal of suspended particles.

1

-

-

... More
C/o Filter house with RSF: -

-

-

-

... More
C/o Filter house with RSF: - Three units of RSF. One unit will act as standby will be provided with rate of filtration of 4800 ltrs/hr/sqm. and maintenance will be done through backwash system.

1

-

-

... More
Formation cutting for D.I main pipe line 300 mm (Ch. 12480 mtrs to 13860 mtrs): - Formation cutting for D.I main pipe line of 1380 mtrs and width 5 mtrs should be carried out with proper specification.

1

-

-

... More
C/o Steel overhead stagging for Zincalume tank at new Kanubari (60,000.00 Ltrs capacity) : - Provision of MS Steel overhead stagging height 15 mtrs for Zinclume tank for Zonal tank at New Kanubari of capacity 60,000.00 ltrs.has been kept.

1

-

-

... More
Supply & Installation of Zincalume tank near sericulture 1,00,000.00 ltrs Capacity: -Provision of Zinclume tank of capacity 1,00,000.00 ltrs for Zonal tank near Sericulture has been kept.

1

-

-

... More
C/o RCC CWR: -

-

-

-

... More
C/o Clear water reservoir tank at WTP: - One no. of clear water reservoir, circular in shape having capacity 0.64 MLD has been provided to collect the water. Water from this reservoir will then be supplied to service reservoirs located in different places to the town.

1

-

-

... More
Supply & Installation of Zincalume tank for Dasatong-II 1,00,000.00 ltrs Capacity: Provision of Zinclume tank of capacity 1,00,000.00 ltrs for Zonal tank Dasatong-II has been kept.

1

-

-

... More
Construction of Support pillar for D.I main pipe line: - Provision of 17 Nos. of support pillars of size 0.60 m x 0.40 m x 3.00 m for D.I main pipe line has been kept.

1

-

-

... More
Electro mechanical component at WTP: -

-

-

-

... More
Electro mechanical component of WTP: - Providing, supplying and installation of Electro mechanical component for whole WTP structures including chlorinator.

1

-

-

... More
SCADA Automation systems: - Supply, erection, testing and commissioning of complete package for PLC/SCADA including supply of instrument required for maintaining the system in SYNC with other system and compatible to communicate to central SCADA system.

1

-

-

... More
C/o Pump house: -

-

-

-

... More
C/o Pump house: - Pump house at WTP for controlling the pumping system for dosing, back washing.

1

-

-

... More
C/o Foot path at WTP: - Provision of footpath of size 1.20 m x 0.15 m and length 184 m of CC has been kept for WTP.

1

-

-

... More
C/o Procurement, Carriage, laying fitting of D.I K-7 pipes (from Head work to WTP): -

1

-

-

... More
Providing and laying S&S centrifugally cast (Spun)/Ductile Iron pipes conforming to IS:8329: - Main pipe line of D.I K7 pipes length 23250 m including laying & Supply in position S&S or flanged D.I such as tees, bends, collars, tapers & caps.

1

-

-

... More
C/o MS steel stagging for overhead Zincalume tank at Olingtong (1,00,000 ltrs) Capacity: - Provision of MS Steel overhead stagging height 15 mtrs for Zinclume tank for Zonal tank at Olingtong of capacity 1,00,000.00 ltrs. has been kept.

1

-

-

... More
Supply and Installation of Zincalume tank at Olingtong capacity 1,00,000 ltrs.:- Provision of Zinclume tank of capacity 1,00,000.00 ltrs for Zonal tank at Olingtong has been kept

1

-

-

... More
C/o Anchor block for main pipe line: - 60 Nos. Size 0.60 mtr x 0.60 mtr x 1.00 mtr

1

-

-

... More
Formation cutting for D.I main pipe line 300 mm (Ch. 13860 mtrs to 15330 mtrs): - Formation cutting for D.I main pipe line of 1470 mtrs and width 5 mtrs should be carried out with proper specification.

1

-

-

... More
C/o RCC Retaining/breast wall at WTP : - 120 mtrs. Height 1.20 mtr

1

-

-

... More
Transportation of D.I and HDPE pipes.

1

-

-

... More
Electro mechanical component for CWR :-

1

-

-

... More
Procurement of Electro mechanical items for HDPE fittings.:- Electromechanical Items like Butt Fusion Machine, DG set Etc for laying fitting of HDPE Pipes.

1

-

-

... More
C/o MS steel stagging for overhead Zincalume tank at Luaksim (1,00,000 ltrs) Capacity: - Provision of MS Steel overhead stagging height 15 mtrs for Zinclume tank for Zonal tank at Luaksim of capacity 1,00,000.00 ltrs. has been kept.

1

-

-

... More
Supply and Installation of Zincalume tank at Luaksim capacity 1,00,000 ltrs.:- Provision of Zinclume tank of capacity 1,00,000.00 ltrs for Zonal tank at Luaksim has been kept.

1

-

-

... More
C/o Drain for waste water disposal: -

-

-

-

... More
C/o CC Drain at WTP :- 0.60 m x 0.60 mx 0.60 m

1

-

-

... More
Site Development of WTP:- Site Development including Landscaping.

1

-

-

... More
C/o Compound wall: -

-

-

-

... More
Construction of boundary wall : - RCC Boundary wall around WTP with MS gate.

1

-

-

... More
C/o MS steel stagging for Overhead Zincalume tank near sericulture (1,00,000 ltrs Capacity) :- Provision of MS Steel overhead stagging height 15 mtrs for Zincalume Zonal tank near Sericulture of capacity 1,00,000.00 ltrs. has been kept.

1

-

-

... More
Supply and Installation of Zincalume tank near Dasatong-II capacity - 1,00,000 ltrs.:- Provision of Zinclume tank of capacity 1,00,000.00 ltrs for Zonal tank Dasatong-II has been kept.

1

-

-

... More
Supply and Installation of Zincalume tank at New Kanubari capacity - 60,000 ltrs.:- Provision of Zinclume tank of capacity 60,000.00 ltrs for Zonal tank at New Kanubari has been kept.

1

-

-

... More
Procurement of Special fittings for D.I main line:-

1

-

-

... More
Construction of Anchor Block and valve chambers: -

-

-

-

... More
Construction of Anchor Block :- 3 Nos.Size 0.60 m x0.60 m x 1.00 m

1

-

-

... More
Construction of Valve Chamber :- 3 Nos.Size 2.00 x 2.00 m x 1.20 m

1

-

-

... More
C/o GSB road from main road to WTP :-

1

-

-

... More
formation cutting of approach road to WTP :- 80 Mtrs., Width 7 mtr

1

-

-

... More
CC Pavement approach road to WTP : - 100 Mtrs., Width 4.00 mtr

1

-

-

... More
CC Drain of approach to WTP:- 100 mtrs. Size 0.60 m x 0.45 m x 0.60 m

1

-

-

... More
Construction of valve chambers for D.I main pipe line and WTP: - 16 Nos. Size 2.00 x 2.00 m x 1.20 m

1

-

-

... More
C/o Site office cum Store and Provision of furniture:-

1

-

-

... More
Construction of RCC Bachelor Barrack Cum Site Office :- 1 Unit

1

-

-

... More
Provision of furniture:- Furniture for B. Barrack and site office.

1

-

-

... More
Operation and Maintenance of WTP:- 5 Years

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.